Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GWMC Tender

Works
Civil And Construction
Drainage Work
Opening Date7 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 16,23,964 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of CC drains;PCC 1:2:4 using 20 mm and 10mm for plain/reinforced concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for Side walls

30.72

5483

168457.11

... More
Construction of CC drains;PCC 1:4:8 using 40mm Nominal Mix for plain/reinforced concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for Bed (BLD-CSTN-2-5)

32.8

5268

172817.95

... More
Construction of CC drains;BLD-CSTN-2-8 (16) : Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

32.8

686

22521.14

... More
Construction of CC drains;Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge.

50.4

72

3669.12

... More
Construction of CC drains;Earthwork in excavation for as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH( PIPE LINE TRENCHES & DRAINS) Manual Means

100.8

297

29962.8

... More
Construction of CC drains;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.

18

607

10937.16

... More
Construction of CC drains;Supply of high performance expansion joint fillet board conforming to IS 1838 25mm thick Supply of high performance expansion joint filler board conforming to IS: 1838 - 25 mm THICK-for roads

7

1347

9432.29

... More
Construction of CC drains;RBR-CCPV-5- Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 53 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.-for roads

120

6982

837840

... More
Construction of CC drains;Supplying and placing seperation membranes of impermeable plastic sheeting 125 microns thick under payments slab including cost and conveyance etc complete.

800

21

17272

... More
Construction of CC drains;Construction of granular sub-base by providing well graded / Close Graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site upto lead of 1000 m spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller 80-100 kN to achieve the desired density, complete For Grading III (CBR Value minimum 20)

129

2198

283548.45

... More
Construction of CC drains;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m including cost and conveyance of all labour charges etc,. Complete.

100

105

10575



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.