For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Pipe Line Project
Water Storage And Supply
Opening Date6 Jan 2025
Closing Date16 Jan 2025
Tender Amount₹ 31,90,463 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
STORM WATER DRAIN;Providing of Impervious cover

477

14

6678

... More
STORM WATER DRAIN;Supply and placing of the Ready Mix Concrete (RMC-M10) as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard Mix Design as per IS-10262:1982 with coarse aggregate of nominal size 20 mm and fine aggregate of Zone-II as per the Mix Design approved by the Department from standard suppliers including cost and conveyance, vertical pumping up to 5 floors / horizontal pumping up to 60.0 M for builsings / pavements etc., works for basic cost including levelling, grading, spreading, curing, centering, vibrating, compacting, finishing etc as required including material VAT, excise duty, pumping, transportation, approved admixture etc., complete

23.85

4359

103976.46

... More
STORM WATER DRAIN;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

95.4

2055

196106.15

... More
STORM WATER DRAIN;Supply and fixing of MS side jallies to be fixed in RCC side drains including labour and conveyance cost complete etc.,

4400

150

663520

... More
STORM WATER DRAIN;Carting away the surplus excavated earth from the work site with a lead of 15.00 km beyond initial lead

316.72

256

81260.85

... More
STORM WATER DRAIN;Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

155.28

41

6458.1

... More
STORM WATER DRAIN;Supply and fabrication of HYSD Fe 415 Grade steel including cost and conveyance to site and labour charges including cutting, bending, fabrication of reinforcement including cost of binding wire, etc complete for 1Kg.

3711.25

66

245833.2

... More
STORM WATER DRAIN;Centering charges for walls

84

1581

132837.6

... More
STORM WATER DRAIN;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,

36.02

8728

314416.78

... More
STORM WATER DRAIN;Plain Cement Concrete 1:4:8 prop using 40mm metal with concrte mexture. All work upto plinth level. Normal mix (cement:fine aggregate:coarse aggregate) using 40mm suze HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges, countries & other taxes on all material, all operational incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing conceret, etc., complete for finished item of work for foundation.

4.2

4903

20592.77

... More
STORM WATER DRAIN;Lowering the RCC 900mm dia class S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985

85

644

54740

... More
STORM WATER DRAIN;Manufacture, supply and delivery of following dia R.C.C NP3 900 mm dia class s/s pipes conforming to BIS 458/1988 using s standard lengths with socket and spigot ends as per detailed specification, including factary to the required test pressure Excluding all taxes and duties. but including Transportaion loading and un loading charges etc., complete

85

7500

637500

... More
STORM WATER DRAIN;Cutting sheet rock including stocking of excavated material.

68.5

2745

188091.44

... More
STORM WATER DRAIN;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.

388.19

293

113748.9

... More
STORM WATER DRAIN;Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 MORD / MORTH

15.3

1537

23526.05



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.