For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Civil Works Others
Opening Date28 Jan 2025
Closing Date13 Feb 2025
Tender Amount₹ 17,23,62,606 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of SWD7;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe class 15extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.

5200

478

2486900

... More
Construction of SWD7;Supply of high performance expansion joint filler board conforming to IS: 1838 - 25 mm THICK in expansion joints including cost and conveyance of all materials, labour charges, fixing in position.

277.56

1347

374003.77

... More
Construction of SWD7;Providing fencing using Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) of 1.5m high as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge with 50 mm Nominal Bore GI pipe of 9 No's of 1.8 m length in 10m stretch with medium grade properties & weight as per IS 1239 ISI mark with GI fittings and MS flats of 25mm x 3mm size 4 No's for each pipe of 100mm length @ 0.59 Kg/m including theincluding the cost of pipe & its fittings,drilling holes of 12mm dia to GI pipes & MS flats, cost of GI bolts, nuts and washers, labour charges for erection of chain link mesh with MS flat and GI pipe etc., complete for finished item of work.

2696

2251

6069208.24

... More
Construction of SWD7;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial leadin layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310).

12423.47

45

567008

... More
Construction of SWD7;Providing barricading arrangement with casurina ballies as per the design duly excavating pits and its removal after the function is over including hire charges fo the barricading materials as per the schedule given by the departmental authorities complete for finished item of work(30%)

2654

98

262560.22

... More
Construction of SWD7;Carting of surplus excavated Soil/rock within a lead of 15Km from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

31313.88

291

9127996.02

... More
Construction of SWD7;Laying Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stiching charges and labour charges for finished item of work.

17000

40

680000

... More
Construction of SWD7;Dewatering by pumping out water collected by natural drainage including cost of all materials machinary, labour, drinage, lighting, and all other operations etc, complete using 5HP diesel dewatering pump.

30000

83

2514900

... More
Construction of SWD7;Providing, fabricating and placing in position reinforcement TMT Fe 500 steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts. (for Base slab/Walls) of culverts.

93816

69

6555862.08

... More
Construction of SWD7;Providing, fabricating and placing in position reinforcement TMT Fe 500 steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts. (for RW Base slab/Walls)

555102

70

38895997.14

... More
Construction of SWD7;Supply and placing of Reinforced Cement Concrete (RCC) M 30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Walls & Slabs of Box Drain Note: 1. The quatities for cement , coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 Kg/Cum of concrete, the difference in cost shall be deducted.

536.4

7942

4260147.8

... More
Construction of SWD7;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407 Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundations as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Foundation Raft of Retaining wall. Note: 1. The quatities for cement , coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 Kg/Cum of concrete, the difference in cost shall be deducted.

2229.51

6614

14747740.45

... More
Construction of SWD7;Supply and placing of Reinforced Cement Concrete (RCC) M 30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Walls of RW Note: 1. The quatities for cement , coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 Kg/Cum of concrete, the difference in cost shall be deducted.

3723.27

6994

26040626

... More
Construction of SWD7;Supply and placing of Plain Cement Concrete (PCC) M30 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (cement content is taken as 405kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with Ordinary Portland Cement 43/53 grade and with 40mm size graded (40mm-60%,20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate conforming IS:383-1970 (as per the Mix Design approved by the Engineer - in - Charge of the Department from standard suppliers) including cost and conveyance of all materials, labour charges, water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, including dewatering & desilting charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges, as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for road restoration

81

6071

491782.59

... More
Construction of SWD7;Supply and placing of Plain Cement Concrete (PCC) M15 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (Cement Content is taken as 275 Kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with 40mm size graded (40mm-60%, 20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 50% Natural Sand and 50% manufactured sand (as per mix design approved by the Engineer-in-charge from the Dept., from standard suppliers) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundation Bed as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 275Kg/Cum. As per mix design, if the cement content is found to be less than 275 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

54

5267

284435.28

... More
Construction of SWD7;Supply and placing of Plain Cement Concrete (PCC) M15 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (Cement Content is taken as 275 Kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with 40mm size graded (40mm-60%, 20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 50% Natural Sand and 50% manufactured sand (as per mix design approved by the Engineer-in-charge from the Dept., from standard suppliers) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundation Bed as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 275Kg/Cum. As per mix design, if the cement content is found to be less than 275 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

6860.28

5369

36839360.59

... More
Construction of SWD7;Providing & constructing Stone dust filling below foundation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

5430.28

1656

8996833.6

... More
Construction of SWD7;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling in trenches with excavated suitable material, as per Technical Specification 305 MORD / 304 MORTH - Hard rock (blasting prohibited) by mechanical means - Upto 3 m depth

3105.87

1699

5279508

... More
Construction of SWD7;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom - Marshy soil - Mechanaical means.

12678.68

258

3280988.81

... More
Construction of SWD7;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling - Mechanical means - depth upto 3m

27952.8

134

3751545.29

... More
Construction of SWD7;Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.