Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Agriculture or Forestry Works
Opening Date4 Jan 2025
Closing Date7 Jan 2025
Tender Amount₹ 19,72,500
Costs
EMD
₹ 49,313Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
566282Tender No
99/DD/CRZ/UBD/GHMC/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Development and Maintenance of Median;Cost and supply of water @ 5 Ltrs / Sqm in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (1100 x 1.5=1650 Sq x 5 x 180/25000)
59.4
3352
199126.62
... More
Development and Maintenance of Median;Application of chemicals and fertilizers/Neem Cake etc
11000
293
32332.3
... More
Development and Maintenance of Median;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (6"x 8"/ 8"x12" / 9"x11" bag size)
11000
460
50635.2
... More
Development and Maintenance of Median;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1
-
11550
... More
Development and Maintenance of Median;Internal transport of bag plants to planting site (6"x 8"/ 8"x12" / 9"x11" bag size)
11000
278
30615.2
... More
Development and Maintenance of Median;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (6"x 8"/ 8"x12" / 9"x11" bag size)
11000
861
94807.9
... More
Development and Maintenance of Median;Application of FYM including internal distribution 30cmt cube pit = 176.76 / 8 = 22.09 (Proportionate rate calculated)
11000
30
3402.3
... More
Development and Maintenance of Median;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.50cmt)=2558.73/8 = 319.84
11000
319
35182.4
... More
Development and Maintenance of Median;B) Shrub Plantation : (a) Raising Year:Digging of pits of size 0.30x0.30x0.30 mts @ 0.5mtrs apart (766.38 / 100 x 50%) (50% adopted because of fresh filled soil)
11000
536
59011.26
... More
Development and Maintenance of Median;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 220 x 20ltrs x 43/25000=7.57 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5
7.57
3352
25370.21
... More
Development and Maintenance of Median;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"X16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
44
2261
994.84
... More
Development and Maintenance of Median;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
220
293
646.62
... More
Development and Maintenance of Median;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1
-
462
... More
Development and Maintenance of Median;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
220
57
125.62
... More
Development and Maintenance of Median;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
1
-
231
... More
Development and Maintenance of Median;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
220
28
6160
... More
Development and Maintenance of Median;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
220
2139
4706.24
... More
Development and Maintenance of Median;Internal transporation of Bag plants to planting site
220
608
1338.57
... More
Development and Maintenance of Median;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
220
861
1896.16
... More
Development and Maintenance of Median;Application of FYM including internal distribution in red soil areas 60 cm pit
220
247
544.42
... More
Development and Maintenance of Median;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
220
2558
5629.21
... More
Development and Maintenance of Median;Digging of pits 0.60 mt X 0.60 mt X 0.60 mt (50% of rate is adopted) (4829.44 x 50% = 2414.72)
220
3380
7437.34
... More
Development and Maintenance of Median;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc., complete to fill the central median to a depth of 30cms uniformly (1100 m x 1.5 m x 0.40 m = 660 cmt)
660
1228
810810
... More
Development and Maintenance of Median;(a) Raising Year: Carting of debris including excavation, loading, unloading etc completed (1650 Sqmts X 0.40 mtr depth = 660 Cmt)
660
174
115368
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements