Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date7 Feb 2025
Closing Date15 Feb 2025
Tender Amount₹ 3,85,930 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
harvesting pit;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete but excluding seigniorage charges for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

49.02

584

28635

... More
harvesting pit;Supply and laying of Sand for filling & blindage including all conveyance charges and laying as per directions of Engineer-in-charge

22.5

3096

69665

... More
harvesting pit;Supply and laying of 20mm HBG Metal (IS383-1970) including all conveyance charges and laying as per directions of Engineer-in-charge

37.5

1584

59433

... More
harvesting pit;Supply and laying of 40mm HBG Metal (IS383-1970) including all conveyance charges and laying as per directions of Engineer-in-charge

75

1285

96440

... More
harvesting pit;Brick masonary in CM (1:6) with 2nd class bricks traditional size 23x11x7 cm including c/c of all material and water to work at site and all operational incidental, labour charges such as scaffolding, mixing mortar lift charges curing etc complete for finished item of work.

4.59

8409

38598

... More
harvesting pit;Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work excluding centering, shuttering.

1.15

4036

4642

... More
harvesting pit;Carting the excavated earth to a lead of 15 KMS including Labour chargess for loading and unlosding, Transportation etc. complete as per specification

128.91

278

35914

... More
harvesting pit;Earth work excavation for foundations and depositing on bank for all lifts with an initial lead of 10m including all operational ,incidental, labour charges such as shoring, sheeting ,planking ,strutting etc complete for finished item. excluding dewatering charges etc. as per SS-20B (APSS 308)

143.23

293

41974



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.