Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Road Construction
Opening Date11 Mar 2024
Closing Date12 Mar 2024
Tender Amount₹ 40,54,487 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
civil;Vacum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, Mechanical trawelling, finishing with sound edges and camers including hire and operational chare of machinery labour fuel etc complete (as per quotation HMR approved)

2855

75

214125

... More
civil;Laying of Seperation Membrane of Impermiable plastic sheeting 125 Micron thick including all labour , accidental and material charges complete

2855

14

39970

... More
civil;Providing and placing of Ready Mix Concrete of Grade M-10 with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1. The rate of RMC is worked out with manufactured sand (rock sand) and natural river sand in the ratio of 50:50. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.

142.75

4254

607396.97

... More
civil;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

142.75

1913

273144.99

... More
civil;Providing and placing P.C.C. grade M 15 Nominal mix concrete for plain/reinforced concrete in using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days all labour , accidental and material charges complete as per drawings and technical specifications . manufactured sand (rock sand) and natural river sand in the ratio of 50:50.

18.9

5177

97858.72

... More
civil;Carting of excavated earth with a lead of 15 KM's including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

444.5

249

110951.65

... More
civil;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Manual Means

285.5

264

75654.65

... More
civil;Dismantling of flexible pavements and stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 MORD / MORTH including all labour , accidental and material charges complete

134.4

1135

152635.39

... More
civil;Dismantling of cement concrete, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH By Mechanical Means

261.38

746

195198.58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.