Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Opening Date16 Oct 2024
Closing Date2 Nov 2024
Tender Amount₹ 20,89,14,506 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Nala Work;Supply and placing of Plain Cement Concrete (PCC) M30 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (cement content is taken as 405kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with Ordinary Portland Cement 43/53 grade and with 40mm size graded (40mm-40%,20mm-40% & 10mm-20%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate conforming IS:383-1970 (as per the Mix Design approved by the Engineer - in - Charge of the Department from standard suppliers) including cost and conveyance of all materials, labour charges, water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, including dewatering & desilting charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges, as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH - for approach road

87.3

6071

530032

... More
Nala Work;Supply and placing of Plain Cement Concrete (PCC) M15 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (Cement Content is taken as 275 Kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with 40mm size graded (40mm-60%, 20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 50% Natural Sand and 50% manufactured sand (as per mix design approved by the Engineer-in-charge from the Dept., from standard suppliers) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundation bed as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.-approach road Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 275Kg/Cum. As per mix design, if the cement content is found to be less than 275 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

58.2

5267

306558

... More
Nala Work;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (using hard broken stone of granite trap dolerite and dolamite free from dust obtained by quarrying wedging, breaking, burning and splitting (quartzite and basalt with aggregate impact of less than 20) specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

58.2

2917

169769

... More
Nala Work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial leadin layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.

23239.79

45

1060664

... More
Nala Work;Providing barricading arrangement with casurina ballies as per the design duly excavating pits and its removal after the function is over including hire charges fo the barricading materials as per the schedule given by the departmental authorities complete for finished item of work

1067.7

98

105628

... More
Nala Work;Carting of surplus excavated Soil/rock within a lead of 20Km from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

42593.58

379

16142967

... More
Nala Work;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of Prestressed / reinforced cement concrete grade M-20 & above including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. As Per MoRTH Specification No 202 (RCC).

288.4

2918

841825

... More
Nala Work;Laying Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stiching charges and labour charges for finished item of work.

5000

40

200000

... More
Nala Work;Dewatering by pumping out water collected by natural drainage including cost of all materials machinary, labour, drinage, lighting, and all other operations etc, complete using 5HP diesel dewatering pump.

7200

83

603576

... More
Nala Work;Construction of an Reinforced cement concrete crash barrier at the bridge decks & approaches to bridge structures, constructed with Reinforced Cement Concrete with HYSD reinforcement conforming MoRT&H Specification and as per details given IRC -5 and approved drawing and at locations directed by the Engineer, all as specified.

164

4043

663085

... More
Nala Work;Supplying, fitting and placing HYSD bar reinforcement Fe-500/500D/550D from steel manufactures within telangana with minimum integrated installed production capacity of 2 lakh MT per annum ( AF Star TMT, MS life TMT, Radha TMT, Sugna TMT) in substructure complete as per drawings and technical specifications sections 1600 & 2200 MORTH including over laps and wastage, where they are not welded - for Retaining Wall Stem and Side walls.

473125.2

71

33809527

... More
Nala Work;Supplying, fitting and placing HYSD bar reinforcement Fe-500/500D/550D from steel manufactures within telangana with minimum integrated installed production capacity of 2 lakh MT per annum ( AF Star TMT, MS life TMT, Radha TMT, Sugna TMT) for box drain/ culvert foundation, walls and top slab and for foundation of retaining wall complete as per drawings and technical specifications sections 1600 & 2200 MORTH including over laps and wastage, where they are not welded.

562132.8

71

40063205

... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M 30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Walls and Top slab of drain. Note: 1. The quatities for cement , coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 Kg/Cum of concrete, the difference in cost shall be deducted.

472.16

7942

3749947

... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (cement content is taken as 407kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with Ordinary Portland Cement 43/53 grade and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate conforming IS:383-1970 (as per the Mix Design approved by the Engineer - in - Charge of the Department from standard suppliers) including cost and conveyance of all materials, labour charges, water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, including dewatering & desilting charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges Plain/Reinforced Cement Concrete for substructure wall of retaining wall etc. complete as per Drawing and Technical Specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH Note: 1) The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 2) For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 kgs per cum of concrete, the difference in cost shall be deducted.3) Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

3942.71

6994

27575393

... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (cement content is taken as 407kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with Ordinary Portland Cement 43/53 grade and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate conforming IS:383-1970 (as per the Mix Design approved by the Engineer - in - Charge of the Department from standard suppliers) including cost and conveyance of all materials, labour charges, water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, including dewatering & desilting charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for foundation /base slab of box culverts, as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Note: 1) The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 2) For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 kgs per cum of concrete, the difference in cost shall be deducted. 3) Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

301.76

6994

2110515

... More
Nala Work;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (cement content is taken as 407kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with Ordinary Portland Cement 43/53 grade and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate conforming IS:383-1970 (as per the Mix Design approved by the Engineer - in - Charge of the Department from standard suppliers) including cost and conveyance of all materials, labour charges, water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, including dewatering & desilting charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for foundation bed of retaining wall, as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Note: 1) The quantities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 2) For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 kgs per cum of concrete, the difference in cost shall be deducted. 3) Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

3910.52

6614

25867269

... More
Nala Work;Supply and placing of Plain Cement Concrete (PCC) M15 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (Cement Content is taken as 275 Kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with 40mm size graded (40mm-60%, 20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 50% Natural Sand and 50% manufactured sand (as per mix design approved by the Engineer-in-charge from the Dept., from standard suppliers) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundation Bed as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 275Kg/Cum. As per mix design, if the cement content is found to be less than 275 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

4114.04

5369

22092189

... More
Nala Work;Providing & constructing Stone dust filling below foundation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

2342.69

1656

3881345

... More
Nala Work;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling in trenches with excavated suitable material, as per Technical Specification 305 MORD / 304 MORTH - Hard rock (blasting prohibited) by mechanical means - Upto 3 m depth

6455.5

1699

10973382

... More
Nala Work;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling Manual Means Depth upto 3 m

11619.89

360

4194315

... More
Nala Work;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling - Mechanical means - depth upto 3m

46479.58

134

6238024

... More
Nala Work;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling with approved material- Marshy soil- mechnical means

990

258

256192

... More
Nala Work;Item Detailed Specification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.