Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Agriculture or Forestry Works
Opening Date28 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 6,32,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development and Maintenance of MLAP Plantations;Application of FYM including internal distribution in red soil areas 60 cm pit

333

247

824.06

... More
Development and Maintenance of MLAP Plantations;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)

333

861

2870.09

... More
Development and Maintenance of MLAP Plantations;Internal transporation of Bag plants to planting site

333

608

2026.11

... More
Development and Maintenance of MLAP Plantations;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)

333

2139

7123.54

... More
Development and Maintenance of MLAP Plantations;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

333

28

9324

... More
Development and Maintenance of MLAP Plantations;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)

-

350

350

... More
Development and Maintenance of MLAP Plantations;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

333

57

190.14

... More
Development and Maintenance of MLAP Plantations;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

-

700

700

... More
Development and Maintenance of MLAP Plantations;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

333

293

978.75

... More
Development and Maintenance of MLAP Plantations;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival

67

2261

1514.87

... More
Development and Maintenance of MLAP Plantations;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 333 x 20ltrs x 43/25000=11.45 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5 ( Subject to changes in the Unit rates)

11.45

3352

38383.83

... More
Development and Maintenance of MLAP Plantations;(a) Raising Year: Digging of pits of size 0.30x0.30x0.30 mts @ 0.5mtrs apart

1665

1072

17864.28

... More
Development and Maintenance of MLAP Plantations;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.30mt pits (0.30 x 0.30 x 0.30 x 4995 x 2 / 3 = 30)

30

1228

36855

... More
Development and Maintenance of MLAP Plantations;Application of Red soil 30cmt cube pit

1665

30

514.98

... More
Development and Maintenance of MLAP Plantations;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.50cmt)=2558.73/8

1665

319

5325.34

... More
Development and Maintenance of MLAP Plantations;Application of FYM 30cmt cube pit (176.76 / 8 = 22.09)

1665

30

514.98

... More
Development and Maintenance of MLAP Plantations;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided (4"x7" / 6"x8") * If department vehicle is used only loading and unloading allowed (Tecoma gadichaudi / caesalpinia hardy plants)

1665

269

4490.67

... More
Development and Maintenance of MLAP Plantations;Internal transport of bag plants to planting site 4x7 bags

1665

95

1584.75

... More
Development and Maintenance of MLAP Plantations;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

-

3330

3330

... More
Development and Maintenance of MLAP Plantations;Planting of bag plants after refilling the pits/support sticks (4"x7" / 6"x8") bags

1665

154

2564.27

... More
Development and Maintenance of MLAP Plantations;Cost of preparation of stakes (1.00m length)and transportation to site

1665

6

9990

... More
Development and Maintenance of MLAP Plantations;Application of chemicals and fertilizers/Neem Cake etc

1665

293

4893.93

... More
Development and Maintenance of MLAP Plantations;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. (4"x7" / 6"x8" Tall plants)

167

789

1317.83

... More
Development and Maintenance of MLAP Plantations;Cost and supply of water @ 5 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (1665 x 5 x 180 Days / 25000 = 59.94 or 60) ( Subject to changes in the Unit rates)

60

3352

201138

... More
Development and Maintenance of MLAP Plantations;Protection, maintenance, watering, tending the plants, weeding, in entire area, soil working upkeep of fencing and removal of unwanted growth etc (12) months @ One person / 1000 mts

1

14675

176100

... More
Development and Maintenance of MLAP Plantations;GST 18 %

1

69485

69485.07

... More
Development and Maintenance of MLAP Plantations;Misc

1

386

386.77



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.