Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date1 Feb 2024
Closing Date5 Feb 2024
Tender Amount₹ 20,67,890 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Community Hall;Engaging of JCB including fuel and driver charges

48

750

36000

... More
Construction of Community Hall;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and encluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but inccluding centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., a) Column footings for rectangular motion for trapezoidal portion h/3 (A1+A2+A1.A2)

2.08

13539

28162.49

... More
Construction of Community Hall;b) Pedestal

3.95

10454

41294.21

... More
Construction of Community Hall;c) Column

2.05

13539

27756.3

... More
Construction of Community Hall;d) Long beams (A1-A3-A3+A5)

4.01

12524

50224.61

... More
Construction of Community Hall;f) Lintel Beams Over doors windows ventilators

0.49

13367

6550.25

... More
Construction of Community Hall;g) Roof beams Long beams (A1-A2-A3-A4-A5 X B1-B2-B3-B4-B5)

4.04

12418

50172.48

... More
Construction of Community Hall;i) Sun shades of width 0.60 mts and 0.40 mts thick over doors

7.92

1054

8349.18

... More
Construction of Community Hall;j) Slab 150mm thick

128.04

1659

212465.73

... More
Construction of Community Hall;Construction of in RR Masonary Ist Sort in Cement Mortor 1:8 Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc., including Cost of Seigniorage Charges on all Materials, all taxes i

20.36

4860

98954.89

... More
Construction of Community Hall;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniora

35.85

7486

268374.18

... More
Construction of Community Hall;Plastering to Ceiling with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, Cost of seigniorage charges on all materials, all taxes, finishing, curing, scaffolding and all operatio

128.04

1889

24190.34

... More
Construction of Community Hall;Plastering 20mm thick in two coat in C.M. (1:6) with dubars sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to site , cost of seigniorage charges on all materials, all taxes, all operational, incidental cha

423.7

5210

220765.92

... More
Construction of Community Hall;Providing imprevious coat over R.C.C. roof slab with CM (1:3) prop., 20mm average thick mixing with water proofing agent like accoproof or any other impermo compound at 1 Kg per bag of Cement laid over roof slab when it is green including cost and conveya

128.04

5615

71904.7

... More
Construction of Community Hall;Flush Pointing to CRS/Brick Masonary in Cement Mortor 1:3 Prop . for including cost & conveyance of all materials to site , cost of seignaiorage charges on all materials, all taxes, labour charges on all materials, curing etc., Complete for finished item

20.4

1057

2156.42

... More
Construction of Community Hall;Supply of Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 1000 x 1000 mm and thickness between 12-15 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs (TBSC-C.II-07)

100

1334

133443

... More
Construction of Community Hall;White Washing two coats with fine screened shell lime including gum Gungee water Prickly juice including necessary fire wood including cost and conveyance of all materials to site seigniorage charges, all taxes, including labour charges for mixing and bru

572.14

363

20770.4

... More
Construction of Community Hall;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

572.14

139

79887.91

... More
Construction of Community Hall;Supply and fabrication of HYSD Fe 415 Grade steel including cost and conveyance to site and labour charges including cutting, bending, fabrication of reinforcement including cost of binding wire, etc complete for 1Kg.

4300

66

286380

... More
Construction of Community Hall;Supply and fixing of door frame made of hollow extruded PVC section having dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metre-cut/ welded. PVC DOOR FRAME TBSC-L.I-05

51.4

256

13158.4

... More
Construction of Community Hall;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mmthick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheetsfor top rail, lock rail & bottom rail on either side, and10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-incharge, manufacturer?s specification & drawing for finished item of work . TBSC-L.III-01

4.8

2292

11001.6

... More
Construction of Community Hall;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding doors with mesh shutter provision ? (2-glass shutters)- 95 -Series duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.20 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.20 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mmthick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of Patio/Bent espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. TBSC-L.III-09

5.76

6821

39288.96

... More
Construction of Community Hall;Supply of 1.5 sqmm 3 core PVC / XLPE Insulated Sheathed Multi Core Bright Annealed Bare Copper Conductor Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as per IS: 694:1990 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells /Polycab / RPG / KEI / Gloster / V-Guard /Finecab / SPM / Gemini / Unistar /Windsor / Payal / Fortune Arrt / Avocab /Pawancab / Nakoda / HPL / Sudhakar /Bonton / Ollvin

100

75

7500

... More
Construction of Community Hall;Supply and fixing of 16A (2 in one) Mini Modular Switch & Socket combined with Cover Frame.e

12

119

1428

... More
Construction of Community Hall;Supplying and fixing Supply of 36/40W fluorescent tube. Makes : Phillips / Crompton / Bajaj /Surya.

10

40

400

... More
Construction of Community Hall;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminiumbody, consuming 28 W, BEE 5 star rated,ceiling fan with Brush Less DirectCurrent(BLDC)motor, class of insulation:B, 3 no's blades, 30 cm long down rod, 2no's canopies, shackle'kit, safety rope,copper winding, Power Factor greaterthan 0.90, Service Value (CMMAV) greaterthan 8.5, Air delivery minimum 235 CMM,350 RPM (tolerance as per IS:374-2019),THD less than 10%. with remote orcompatible to electronic step typeregulator unit for speed control and allremaining accessories including safetypin, nut bolts, washers, temperaturerise=75 degree C(max), insulationresistance more than 2 mega ohm,suitable for 230V, 50 HZ, single phase ACsupply, earthing etc., including allstandard accessories etc., complete.Makes : Atomberg (Efficio ) / Havells /Orient

6

2822

16932

... More
Construction of Community Hall;Supply and erecting resistance resistance type regulator for ceiling fans 900/1200/1400mm sweep complete erected on existing boards

6

42

252

... More
Construction of Community Hall;Supply and fixing distribution board with 20a single phase plug and socket, in sheet steel enclosure with 10/16/20a sp mcb including internal connection and labour charges for surface / flush mounting etc., complete S

4

943

3772

... More
Construction of Community Hall;Flooring with of any size 1st quality set over 12mm thick CM (1:8) prop base coat and neat grey cement slurry of honey like consistancy spread at the rate of 3.3 kgs. Of cement per sqm and jointed with neat white cement paste mixed with pigment of matching shade including cost, seigniorage, sales tax royalties and conveyance of all materials and water etc., from approved sources to work site and all Deptl. incidental labour charges such as mixing mortar dressing laying lift charges fixing in position curing etc., complete for finished item of work for Bath rooms (Antiskid red on white full body ceramic tiles)

2.94

8888

2613.08

... More
Construction of Community Hall;Dadooing to walls with glazed red tiles of any size 1st quality set over 6mm thick CM (1:3) prop. Base coat and neat grey cement slurry of honey like consistancy spread at the rate of 3.3 kgs. Of cement per sqm and jointed with neat white cement paste mixed with pgiment of matching shade including cost, seigniorage charged and conveyance, seignarage, sales tax royalties of all materials and water etc., from approved sources to work site and all Deptl. incidental labour charges such as mixing mortar dressing laying lift charges fixing in position curing etc., complete for finished item of work

13.51

542

7325.25

... More
Construction of Community Hall;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap

1

2008

2008

... More
Construction of Community Hall;TBSP-H.II-73 Supply and fixing of 3" (75 mm nominal size ) Nahany Trap with Jali -

3

117

351

... More
Construction of Community Hall;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931

5

261

1305

... More
Construction of Community Hall;S& F 50 mm Nominal Bore GI pipe Light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges complete TBSP-G.I-06

100

500

50000

... More
Construction of Community Hall;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indianmakeheavytype-25mmNBSize TBSP-G.III-03

5

1306

6530

... More
Construction of Community Hall;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks TBSP-H.II-01

1000

9

9000

... More
Construction of Community Hall;Supply and fixing of Cement Bonded Prelaminated Particle Board single door shutter using 16MM Cement Bonded Prelaminated Particle Board with all round section ?U? size of mm thick galvanized pre-painted cold rolled steel profiles Cement Bonded Prelaminated Particle Board with necessary screws fixed at every 1?0? ( 304.8mm) intervals. The cost inclusive of MS Nickel coated 250mm long Aldrops 2 no?s , MS powder coated 250mm long tower bolt 1 no?s, 2no?s MS powder coated 125mm long grip handle, 1 no?s M.S.P.C. Door stopper. Including cost and conveyance of all materials at site labour charges etc., complete finished item of work. TBSC-L.II-13

1.39

2531

3511.76

... More
Construction of Community Hall;Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item of work, but excluding the cost of conveyance of all materials.

64

837

53592.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.