Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date27 Feb 2025
Closing Date6 Mar 2025
Tender Amount₹ 7,76,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of parks;Hibiscus

50

60

3000

... More
Development of parks;ficus black

100

300

30000

... More
Development of parks;Heliconia

100

70

7000

... More
Development of parks;Tecoma capensis

600

28

16800

... More
Development of parks;alamanda bush

600

30

18000

... More
Development of parks;Nerium Dwarf white

600

35

21000

... More
Development of parks;plumbago

600

35

21000

... More
Development of parks;Dracaena mahatma

600

30

18000

... More
Development of parks;Hamelia patens

600

35

21000

... More
Development of parks;Pisonia alba

700

50

35000

... More
Development of parks;Pandanas

800

35

28000

... More
Development of parks;Lantana White

500

30

15000

... More
Development of parks;Lantana Purple

500

30

15000

... More
Development of parks;Cost of Carpet grass ( 100 x 10.76= 1076 sqmt)

1076

10

11362.56

... More
Development of parks;Add 18% GST

1

-

28526

... More
Development of parks;Engaging of Labour [Man Mazdoor] including Municipal Allowances 40% over basic rate

10

728

7280

... More
Development of parks;Gate repairs (Needs to finalize as per genuine work)

1

15000

15000

... More
Development of parks;Banglore stone benches with back support

6

10700

64200

... More
Development of parks;Laying of paved pathway with Shabad Stones

50

743

37171

... More
Development of parks;Errection of Display of Name Boards with Iron angulars

1

15000

15000

... More
Development of parks;Maintenance of ground covers: Watering @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously) The watering shall be carried out DAILY during non rainy days, weeding, trimming and keeping the ground cover in healthycondition ( For 2 months )

50

924

924.11

... More
Development of parks;Maintenance of individual shrubs, rose plants, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 2 months

246

612

3014.05

... More
Development of parks;Maintenance of hedge / shrub planting:i)Trimming of hedges / shrubs once in 15 days. ii) Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). iii). Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., for (2) months

268

2930

15709.03

... More
Development of parks;III) MAINTENANCE : - Maintenance of Lawn, Mannaual watering (2 Months) (1) Watering the lawns@10 liters / Sqm. / day basing on the season and weather conditions (sub soil moisture shall be maintained contionously). The watering shall be carried out DAILY during non rainy days. (2) Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (i) June to November - once in 15 days (ii) December to May - once in 30 days. (3) Edging of the lawns in such a way that the lawn grass do not penetrate innto the plants and in a defined perfect geaometric shapes or smootha curves. (4) Keeping the lawns in lush green & weed - free condition. (5) Application of fertilizers, insecticides, Fungicides etc. (a) With manual watering. (b) With Drip / Sprinklers system. (2) Months

100

924

1848.22

... More
Development of parks;Add 18% GST

1

-

48310.75

... More
Development of parks;Ground Cover : Bed preparation 4" layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers (@ 20 gms/pit/sqmt), smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation.

50

203

10198

... More
Development of parks;Hedge / shrub planting:Digging the trench of size 15 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers(@ 20 gms/pit/sqmt) and plantmaterial.

268

317

85138.24

... More
Development of parks;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

196

194

38037.72

... More
Development of parks;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.60x0.60x0.60 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

50

344

17243.5

... More
Development of parks;Supply and fixing of Pre Cast AAC Kerbs work size 600 mm X 375 mm X 110 mm Semibated at top in M30 grade including Cost and Convenyance to site and labor charges for laying true to alignment and painting with cement motor (1: 3 ) prop etc

268

225

60300

... More
Development of parks;Regular watering and removal of weeds, protection etc for 45 days for initial establishment

100

9

989

... More
Development of parks;Laying and raimming of carpetgrass

100

58

5810

... More
Development of parks;Bed preparation : Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals & grass.

100

333

33375

... More
Development of parks;I ) DEVELOPMENT : Cost of Gravel including internal transportation, application and spreading complete

40

432

17301.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.