Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Building Construction
Opening Date2 Dec 2024
Closing Date7 Dec 2024
Tender Amount₹ 10,92,700
Costs
EMD
₹ 27,318Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
558132Tender No
S O No 504/DUB/24-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Development of parks;Veitchia merrilli gold
15
1800
27000
... More
Development of parks;Plumeria alba
50
80
4000
... More
Development of parks;Ixora singaporensis
100
100
10000
... More
Development of parks;ficus black
50
300
15000
... More
Development of parks;Hibiscus
50
60
3000
... More
Development of parks;Tecoma capensis
500
28
14000
... More
Development of parks;alamanda bush
500
30
15000
... More
Development of parks;Heliconia
400
120
48000
... More
Development of parks;Nerium Dwarf white
400
60
24000
... More
Development of parks;plumbago
400
60
24000
... More
Development of parks;Dracaena mahatma
400
30
12000
... More
Development of parks;Hamelia patens
400
60
24000
... More
Development of parks;Pisonia alba
500
65
32500
... More
Development of parks;cost of plant material
1
-
-
... More
Development of parks;Cost of Carpet grass ( 270 x 10.76= 2905.2 sqmt)
2905.2
10
30678.91
... More
Development of parks;Sweeping of pathway and protection day and night 1 person x 6 months ( Including ESI @ 3.25% , EPFO @ 13% per month )
1
16676
100056
... More
Development of parks;Add 18% GST
1
-
34921
... More
Development of parks;Banglore stone benches with back support
6
10700
64200
... More
Development of parks;Laying of paved pathway with Shabad Stones
50
743
37171
... More
Development of parks;Tools and implements ( Hose Pipes and other implements )
1
11483
11483
... More
Development of parks;Errection of Display of Name Boards with Iron angulars
1
15000
15000
... More
Development of parks;Maintenance of individual shrubs, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 6 months
340
612
12497.28
... More
Development of parks;Maintenance of hedge / shrub planting:i)Trimming of hedges / shrubs once in 15 days. ii) Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). iii). Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., for (6) months
220
2930
38686.43
... More
Development of parks;III) MAINTENANCE : - Maintenance of Lawn, Mannaual watering (2 Months) (1) Watering the lawns@10 liters / Sqm. / day basing on the season and weather conditions (sub soil moisture shall be maintained contionously). The watering shall be carried out DAILY during non rainy days. (2) Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (i) June to November - once in 15 days (ii) December to May - once in 30 days. (3) Edging of the lawns in such a way that the lawn grass do not penetrate innto the plants and in a defined perfect geaometric shapes or smootha curves. (4) Keeping the lawns in lush green & weed - free condition. (5) Application of fertilizers, insecticides, Fungicides etc. (a) With manual watering. (b) With Drip / Sprinklers system. (6) Months
270
924
14970.61
... More
Development of parks;Add 18% GST
1
-
72549.76
... More
Development of parks;Hedge / shrub planting:Digging the trench of size 15 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers(@ 20 gms/pit/sqmt) and plantmaterial.
220
317
69889.6
... More
Development of parks;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
240
194
46576.8
... More
Development of parks;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.60x0.60x0.60 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
100
344
34487
... More
Development of parks;Supply and fixing of Pre Cast AAC Kerbs work size 600 mm X 375 mm X 110 mm Semibated at top in M30 grade including Cost and Convenyance to site and labor charges for laying true to alignment and painting with cement motor (1: 3 ) prop etc
350
225
78750
... More
Development of parks;Regular watering and removal of weeds, protection etc for 45 days for initial establishment
270
9
2670.3
... More
Development of parks;Laying and raimming of carpetgrass
270
58
15687
... More
Development of parks;Bed preparation : Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals & grass.
270
333
90112.5
... More
Development of parks;I ) DEVELOPMENT : Cost of Gravel including internal transportation, application and spreading complete
150
432
64881
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements