Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Pipe Line Project
Opening Date24 Jan 2025
Closing Date1 Feb 2025
Tender Amount₹ 2,12,557
Costs
EMD
₹ 2,126Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
571647Tender No
NIT No. 29/EE-30/SD Z/GHMC/2024-2025(Item 1) Dt.21-01-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SWG pipe line and maintenance / repair;Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH
0.75
502
377
... More
SWG pipe line and maintenance / repair;Removing and refixing of Flooring with 40 mm thick Rough Cuddapah/Shabad stones of size (0.457m X 0.457m) set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost and conveyance of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,
63
596
37586
... More
SWG pipe line and maintenance / repair;Plain Cement Concrete (1:5:10) using 40mm metal with hand mixing up to plinth level using 129.60kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing etc., complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}
3.68
4783
17605
... More
SWG pipe line and maintenance / repair;Plain Cement Concrete M20 nominal mix with 20mm metal with concrete mixture, using 400kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing including hire charges of machinary but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}
2.25
6458
14532
... More
SWG pipe line and maintenance / repair;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. (with out paver finisher)
3.2
1986
6358
... More
SWG pipe line and maintenance / repair;Supply of fixing 160 MM dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm , complete for finished item of work.TBSP-H.I-23
7
1354
9478
... More
SWG pipe line and maintenance / repair;Supply and fixing of MS structural steel for heavy iron grills, trusses, steel beams and girders as approved by the dept officers including cost and conveyance of metarials, fabrication charges, cost of welding rods, power charges, labour charges for erecting in position and fixing by using chain pully blocks, derek pole arrangments and crain etc complete in position (SSR item)
80
131
10480
... More
SWG pipe line and maintenance / repair;Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self- drilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws.End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti-capillary grove.TBSC-R.I-41
29.92
842
25193
... More
SWG pipe line and maintenance / repair;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable. ISI mark , HD 35 - 560mm diaclear opening
1
2911
2911
... More
SWG pipe line and maintenance / repair;Construction of Additional 0.10mt depth to 0.90mt circular dia sewer man hole of 0.90 mts depth with cement bricks of size (flyash cement blocks of size 225X100X60mm with compressive strength of 50kg/ sqm IS:12894- 1990 class -V ) in CM 1:4 and for corbelling portion with internal plastreng 20 mm thick (CM 1:3 prop) and external plasterng 12mm thick ( CM 1:3prop) excluding the cost and fixing charges of CI steps, including the cost and conveyance of all materials at site complete and curing for 21 days complete as per specification etc complete.
2
850
1702
... More
SWG pipe line and maintenance / repair;Constructon of 0.90mt circular sewer man hole of 0.90 mts depth with cement bricks of size (flyash cement blocks of size 225X100X60mm with compressive strength of 50kg/ sqm IS:12894- 1990 class -V ) in cm 1:4 prop for vartical and corbelling portion including cc bed ( 1: 4 : 8 ) prop using 40 mm gauge HG Metal 0.23 mt thick and cc benching of 0.15mt thick and chanelling with 1:2:4 prop with internal plastreng 20 mm thick (CM 1:3 prop) and external plasterng 12mm thick ( CM 1:3prop) with fine rendering including fixing charges of FC/ CI cover and frame but excluding cost of cover and frame and including the cost and fixing charges of CI steps, including the cost and conveyance of all materials at site complete and curing for 21 days complete as per specification etc complete.
1
10384
10384
... More
SWG pipe line and maintenance / repair;Filling with useful available excavated earth (excluding rock) sand/gravel/ stone dust/ chips in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. But excluding cost and conveyance of material. (APSS NO. 309 & 310) Earth/ Sand/ gravel filling (ordinary soil)
24.01
41
999
... More
SWG pipe line and maintenance / repair;Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of 8" dia (203.2 mm ) stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and Spun yarn but excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72)
34.8
302
10529
... More
SWG pipe line and maintenance / repair;Supply of SWG SP-2 pipe conforming to ISI 651 - 8" dia(203.2mm) TBSP-A.II-09
35.5
739
26235
... More
SWG pipe line and maintenance / repair;Carting of excavated earth with a lead of about 14 KMts, including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed.
29.66
241
7153
... More
SWG pipe line and maintenance / repair;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). (manual means)
29.66
293
8691
... More
SWG pipe line and maintenance / repair;Cutting B.T.Road surface road including stacking of excavated materials for pipe line trench work
1.08
1127
1217
... More
SWG pipe line and maintenance / repair;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (cement concrete)
2.82
885
2497
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements