For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
488995Tender No
1451/DUB/GHMC/2023-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Development and Maintenance of MLAP Plantations;Cost and supply of water @ 5 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (1665 x 5 x 180 Days / 25000 = 59.94 or 60)
60
3352
201138
Development and Maintenance of MLAP Plantations;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. (4"x7" / 6"x8" Tall plants)
167
789
1317.83
Development and Maintenance of MLAP Plantations;Application of chemicals and fertilizers/Neem Cake etc
1665
293
4893.93
Development and Maintenance of MLAP Plantations;Cost of preparation of stakes (1.00m length)and transportation to site
1665
6
9990
Development and Maintenance of MLAP Plantations;Planting of bag plants after refilling the pits/support sticks (4"x7" / 6"x8") bags
1665
154
2564.27
Development and Maintenance of MLAP Plantations;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
-
3330
3330
Development and Maintenance of MLAP Plantations;Internal transport of bag plants to planting site 4x7 bags
1665
95
1584.75
Development and Maintenance of MLAP Plantations;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided (4"x7" / 6"x8") * If department vehicle is used only loading and unloading allowed (Tecoma gadichaudi / caesalpinia hardy plants)
1665
269
4490.67
Development and Maintenance of MLAP Plantations;Application of FYM 30cmt cube pit (176.76 / 8 = 22.09)
1665
30
514.98
Development and Maintenance of MLAP Plantations;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.50cmt)=2558.73/8
1665
319
5325.34
Development and Maintenance of MLAP Plantations;Application of Red soil 30cmt cube pit
1665
30
514.98
Development and Maintenance of MLAP Plantations;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.30mt pits (0.30 x 0.30 x 0.30 x 4995 x 2 / 3 = 30)
30
1228
36855
Development and Maintenance of MLAP Plantations;(a) Raising Year: Digging of pits of size 0.30x0.30x0.30 mts @ 0.5mtrs apart
1665
1072
17864.28
Development and Maintenance of MLAP Plantations;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 333 x 20ltrs x 43/25000=11.45 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5
11.45
3352
38383.83
Development and Maintenance of MLAP Plantations;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
67
2261
1514.87
Development and Maintenance of MLAP Plantations;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
333
293
978.75
Development and Maintenance of MLAP Plantations;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
-
700
700
Development and Maintenance of MLAP Plantations;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
333
57
190.14
Development and Maintenance of MLAP Plantations;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
-
350
350
Development and Maintenance of MLAP Plantations;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
333
28
9324
Development and Maintenance of MLAP Plantations;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
333
2139
7123.54
Development and Maintenance of MLAP Plantations;Internal transporation of Bag plants to planting site
333
608
2026.11
Development and Maintenance of MLAP Plantations;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
333
861
2870.09
Development and Maintenance of MLAP Plantations;Application of FYM including internal distribution in red soil areas 60 cm pit
333
247
824.06
Development and Maintenance of MLAP Plantations;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
333
2558
8520.57
Development and Maintenance of MLAP Plantations;Digging of pits 0.60 mt X 0.60 mt X 0.30 mt
333
6761
22514.85
Development and Maintenance of MLAP Plantations;(a) Raising Year: Alignment and staking including cost of stakes
333
97
323.31