Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation Tender

Works
Civil And Construction
Building Construction
Opening Date6 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 19,27,692 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply,manufacture & fixing of teak wood door frame with alomg with panels & hard ward material like dead boults,tower boults,hinge,flush boult,Latching, including carpenter,transport & fitting all charges etc complete.,including polish

1

165000

165000

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply & fixing Mild Steel Powder coated drapery curtainrods (25.4 mm)1" x 21 G with PVC rings

4.8

153

736.22

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-J.I-25:S & F 25mm dia 0.60 mtrs. Long aluminium anodized towel rods with brackets etc., including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

4

198

795.32

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-F.VII-21:S & F brass soap dish heavy type approved make with NP screws etc., complete including cost and conveyance of all materials, labour charges for finished item of work in all floors

4

682

2731.32

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-J.I-35: Supplying and fixing TV shape Mirror with plastic frame size 609.6 mm x 457 .2 mm

4

618

2472.28

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and fixing of CFL holder in lieu of ceiling rose of light point complete with all connections and all labour charges etc. Makes : GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL.

4

116

466.68

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads,earth connections along with all labour charges etc., complete.

30

177

5310

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

1

5107

5107.99

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

360

99

35658

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

1080

72

77814

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-E.VI-01: Supplying & Fixing 660 x 460 mm - Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer)1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug,chain,32 mm nominal size C.P.Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: Single C.P. Pillar cock

3

4493

13480.41

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-H.II-01:Providing and placing on terrace (at all floor levels) polyeth eylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks

1000

10

10000

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-12-3-(170):Painting to walls with Two coats of water proof cement paint of approved brand and shade over a base coat of water based primer of exterior grade-2 of approved brand,making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials,including cost and conveyance of all materials to work site and all operational,incidental, labour charges etc.complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for External Walls - Water proof cement paint -1+2 Coats

445.59

143

64107.03

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for Internal walls

502.55

115

57793.25

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-12-1-(168) : Painting to Ceiling with 2 coats of Acrylic based Oil bound Washable Distemper having VOC content less than 50 grams/litre over promer coat using water based cement primer of interior grade-1 making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work as per APSS 911 for internal walls/ceiling in all floors.

151.64

148

22501.86

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply ,transportation,and fixing of 22W, 2500 lumens,1200mm length LED batten,housing made with alluminium extrusion, wide operating voltage range from 140V-2720V AC, PF 0.9,IP 20,Class - C serviceability,THD<20%,CCT: 4000K / 6500K as desired by the department and as per IS specifications, minimum CRI 80,.etc suitable for mounting on wall/surfce/ suspendable complete with 5 years warranty. LUMINAIRE MAKE: Phillips model Number BN021LED25S6500PSU GR S1 LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs .

15

829

12440.85

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and Fixing of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesand 400W Mini Modular Stepped type Electronic Regulator with Cover Frame including providing fan hook of 12/15mm dia M.S. rod / bar grouted in RCC slab with making the slab as original and 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan etc,. complete

10

2272

22723

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-E.II-02:Supply & fixing white glazed European water closet with variety as approved by Engineer-in-charge, P" or S" trap with 4" CI outlet pipe of approved make, plastic seat and lid for EWC and rubber buffers as per ISI 2548 1963 with and low down porcelain flushing tank with lid 10 Lit Capacity with internal components and fixed with wooden gutties with required size nails, 32mm dia short CP bend, 15 mm PVC connections with brass union nuts and 12.70 mm (1/2")NP stop cock heavy duty (300 grams), complete including cost and conveyance of all materials to site, for finished item of work for all floors.

2

7283

14567.72

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;TBSP-E.I-01:Providing and fixing 23" (584.2mm) long white glazed Indian WC Orissa pan of parry/Neycer/HSW make with P or S trap with brick masonry seat, CC squatting plate as approved by Engineer-in-charge, W.C. shall be encased on CC (1:2:4) 6? alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and segniorage charges etc., complete for finished item of work.

1

2408

2408.35

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-9-18-(116) see Ref:9-23-(121-b): Dadooing to walls with plain white glazed wall tiles of any size and of 5 to 7 mm thick set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets)

24.68

606

14973.6

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Providing and Fixing Pre painted Steel Sliding Windows / Doors - 3 track sliding window /doors shutter with mesh shutter ? (2 - glass shutters and 1 - mesh shutter) fabricated from Roll formed sections made of galvanized Steel colour coated/powder coated (Base Steel as per IS 513 ?D? quality, galvanized as per IS 277 with zinc of 120 GM/Sq.mtr) with total coated thickness of 0.58mm. Primer coat with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60 microns thick. Section for external frame should be of 44 x 107mm .Section for glass shutter and mesh shutterin case of door should be of 35 x 67 mm Section for euro groove should be 25 x 31mm (Aluminium/ Plastic) (in case of window sections should be 35 x 49 mm and 25 x 24 mm and 30 x 41 mm) and Lap Strip should be of 39 x 41mm (30 x 41 mm & Touch lock for window ) (Aluminium/ Plastic. The doors/ windows should be paneled with 5mm thick plain float glass. Corner bracket for internal and external frame made of glass filled nylon. Gaskets are to be made of Ethyl Propylene Diamine Monomer (EPDM).The sections are to be cut to length, joined and assembled by means of corner bracket. The above frames should be fixed to the concrete/masonry walls by means of self expandingbrackets & screws including 10mm square guard bars with 6? pitch (152.4mm) (in case of windows only) and all Taxes complete for finished item of work.

10.48

10169

106578.14

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with with teak ply on both faces conforming to IS:2202 with 1no. 300 mm long Aldrop, 2 nos. 125 mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. door stopper ( all fixturs MS Powder coated ) including c/c of all materials and labour chrges etc., complete

4.26

3125

13314.2

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Providing and fixing 30mm thick WPC ( Wood Plastic Composition ) Door Shutters as per manufacture specification fitted with Hinges, 2 Nos of 250 mm long MS Aldrop, 2 Nos of 125 mm lond Aluminium door handle, 1 No.of 250 mm long Aluminium tower bolt, 1 no. 250 mm long Aluminium door latch & 1 No.baby lock including cost and conveyance of all material , all fixtures and all labour charges etc, for fixing etc, complete.

5.67

2832

16059.82

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black / premium colours slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand water and tiles etc., complete, for finished item of work.

41.75

5266

219858.84

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls

795.62

231

183788.22

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-FLC-4.1 as per India Gypsum) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1982 fixing to Gyp steel perimeter channels of size 20mm X 27mm X 30mm (web) of 0.55mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using intermediate channels (45 mm x 15mm x 15mm x 0.9mm) from soffit at 1220 mm c/c ceiling angle (25mm X 10mm X 0.55mm ) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm X 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypsboard with 25mm dry wall screws ar 230mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd., specification.

73.18

1137

83226.88

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-9-5-(103) : Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles etc. complete for finished item of work.

160.09

1281

205132.92

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

104.91

83

8726.41

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-12-7-(174): Painting One Priming Coat on New Iron Work- with Red oxide primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

104.91

72

7557.72

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, , including conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

220.52

596

131463

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand ,Water, etc.,to site,all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing including cutting grooves where ever necessary etc.,complete for finished item of work of uneven surfaces of walls. (Internal walls)

445.59

542

241710.3

... More
Balance of Work of Zone II Office Building in Nizamabad Municipal Corporation;BLD-CSTN-5-4-(42):Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

8

7931

63451.44



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.