Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Excavation
Opening Date11 Nov 2024
Closing Date18 Nov 2024
Tender Amount₹ 9,38,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development;Clerodendron inermi 7x8

400

16

6400

... More
Development;Duranta erecta 8X10

240

50

12000

... More
Development;Acalypha red 8x10

400

40

16000

... More
Development;Cost of Plant Material (bag size in inches) :Pisonia alba 8x10

400

65

26000

... More
Development;Engaging of labour for cleaning operations like weeding of overgrowth grass, trimming of side branches removing and cutting of jungle growth, lifting of cutting material and lead mould in park area (Janachaitanya Park N0-64 & 74)

15

728

10920

... More
Development;Installation of Children Play equipmnet (including GST) at site including Cost of Sand , Loading , Unloading .etc complete

1

-

148200

... More
Development;Cost of Carpet grass ( 150x 10.76= 1614 sqmt)

1614

10

17043.84

... More
Development;Sweeping & maintenance 1 person x 12 months ( Including ESI @ 3.25% , EPFO @ 13% per month )

1

16676

200112

... More
Development;Laying of paved pathway with Shabad Stones

40

743

29736.8

... More
Development;Laying of pre fabricatedAACbrick kerbing block size 0.60cmx0.30cmx0.10cm including cost and all material etc alinment 1;3 mortar

263

225

59306.5

... More
Development;Banglore stone benches with back support

12

10700

128400

... More
Development;Errection of Display of Name Boards with Iron angulars

1

15000

15000

... More
Development;Maintenance of individual shrubs, rose plants, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 12 months

50

612

3675.67

... More
Development;Maintenance of hedge / shrub planting:i)Trimming of hedges / shrubs once in 15 days. ii) Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). iii). Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., for (12) months

71.16

2930

25026.6

... More
Development;III) MAINTENANCE : - Maintenance of Lawn, Mannaual watering (1) Watering the lawns@10 liters / Sqm. / day basing on the season and weather conditions (sub soil moisture shall be maintained contionously). The watering shall be carried out DAILY during non rainy days. (2) Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (i) June to November - once in 15 days (ii) December to May - once in 30 days. (3) Edging of the lawns in such a way that the lawn grass do not penetrate innto the plants and in a defined perfect geaometric shapes or smootha curves. (4) Keeping the lawns in lush green & weed - free condition. (5) Application of fertilizers, insecticides, Fungicides etc. (a) With manual watering. (b) With Drip / Sprinklers system. (12) Months =1060 X 924.112/100 X 12 = 44357.38

150

924

16634.02

... More
Development;Hedge / shrub planting:Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers(@ 20 gms/pit/sqmt) and plantmaterial.

71.16

756

53831.83

... More
Development;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

50

194

9703.5

... More
Development;Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture with red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of fertilizers (@ 20 gms/pit/sqmt) and plantmaterial)

2

746

1493.2

... More
Development;Regular watering and removal of weeds, protection etc for 45 days for initial establishment

150

9

1483.5

... More
Development;Laying and raimming of carpetgrass

150

58

8715

... More
Development;Bed preparation : Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals & grass.

150

333

50062.5

... More
Development;I ) DEVELOPMENT : Cost of Gravel including internal transportation, application and spreading complete (287.4 X 0.15 =43.11 Cmt )

43.11

432

18646.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.