Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Agriculture or Forestry Works
Opening Date1 Sep 2024
Closing Date4 Sep 2024
Tender Amount₹ 9,47,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of MLAP;Application of FYM including internal distribution in red soil areas 60 cm pit

500

247

1237.32

... More
Development of MLAP;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)

500

861

4309.45

... More
Development of MLAP;Internal transporation of Bag plants to planting site

500

608

3042.2

... More
Development of MLAP;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)

500

2139

10696

... More
Development of MLAP;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

500

28

14000

... More
Development of MLAP;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)

-

525

525

... More
Development of MLAP;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

500

57

285.5

... More
Development of MLAP;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

-

1050

1050

... More
Development of MLAP;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

500

293

1469.6

... More
Development of MLAP;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival

100

2261

2261

... More
Development of MLAP;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 333 x 20ltrs x 43/25000=11.45 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5

17

3352

56989.1

... More
Development of MLAP;(a) Raising Year: Digging of pits of size 0.30x0.30x0.30 mts @ 0.5mtrs apart

2500

1072

26823.25

... More
Development of MLAP;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.30mt pits (0.30 x 0.30 x 0.30 x 4995 x 2 / 3 = 30)

45

1228

55282.5

... More
Development of MLAP;Application of Red soil 30cmt cube pit

2500

30

773.25

... More
Development of MLAP;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.50cmt)=2558.73/8

2500

319

7996

... More
Development of MLAP;Application of FYM 30cmt cube pit (176.76 / 8 = 22.09)

2500

30

773.25

... More
Development of MLAP;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided (4"x7" / 6"x8") * If department vehicle is used only loading and unloading allowed (Tecoma gadichaudi / caesalpinia hardy plants)

2500

269

6742.75

... More
Development of MLAP;Internal transport of bag plants to planting site 4x7 bags

2500

95

2379.5

... More
Development of MLAP;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

-

5000

5000

... More
Development of MLAP;Planting of bag plants after refilling the pits/support sticks (4"x7" / 6"x8") bags

2500

154

3850.25

... More
Development of MLAP;Cost of preparation of stakes (1.00m length)and transportation to site

2500

6

15000

... More
Development of MLAP;Application of chemicals and fertilizers/Neem Cake etc

2500

293

7348.25

... More
Development of MLAP;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. (4"x7" / 6"x8" Tall plants)

250

789

1972.8

... More
Development of MLAP;Cost and supply of water @ 5 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (1665 x 5 x 180 Days / 25000 = 59.94 or 60)

90

3352

301707

... More
Development of MLAP;Protection, maintenance, watering, tending the plants, weeding, in entire area, soil working upkeep of fencing and removal of unwanted growth etc (12) months @ One person / 1000 mts

1.5

14675

264150

... More
Development of MLAP;GST 18 %

1

104147

104147.85

... More
Development of MLAP;Misc

1

103

103



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.