Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 9,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
565145Tender No
NIT No.23/DB/EE/Alwal Circle/GHMC/2024-25 Dt.23.12.2024 (Under SDF 2023-24) (Item No.09)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
others;Supply and placing of the Ready Mix Concrete (RMC) M30 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, centering, shuttering for finished item of work.
10
5017
50180
... More
others;Supply and placing of Ready Mix Concrete M 10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete.(RMC-M10)
21.6
4325
93434
... More
others;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying without paver finisher in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
21.6
1955
42237
... More
others;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work
207
177
36807
... More
others;Plastering 20mm thick in single coat in C.M. (1:4) with dubars sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to site ,on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, Scaffolding , lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surfaces of walls. excluding cost of seigniorage charges
207
286
59210
... More
others;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum. excluding Cost of Seigniorage Charges
23.8
7608
181118
... More
others;Flush Pointing to RR Masonary in Cement Mortor 1:3 Prop including cost & conveyance of all materials like cement, sand to site including cost of seignaiorage charges on all materials, all taxes, labour charges on all materials, curing etc., Complete for finished item of work
27
110
2990
... More
others;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Cost of Seigniorage Charges on all Materials, all taxes including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum
32.4
5052
163693
... More
others;Plain Cement Concrete (1:5:10) using 40mm metal with hand mixing up to plinth level using 129.60kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing etc., complete for finished item of Work.1 Cum ex cluding Cost of Seigniorage Charges
6.21
4703
29210
... More
others;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth
81.9
277
22746