Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Civil Works Others
Opening Date19 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 63,79,622 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Beautification and Development of parks;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls

48

254

12232

... More
Beautification and Development of parks;Collection and supply and spreading of gravel including watering and rolling with Hand roller irresppective of thickness to achive the desired density as per Technical specification and excluding Seigniorage charges

72

506

36467

... More
Beautification and Development of parks;Supply of precast cc blocks (of 600*325*150/115mm) for kerbing made with rubberized moulds of M30 grade design mix with 350 kgs cement/cum of concrete.20mm ? 6mm nominal hard granite machine crushed metal at 0.80 cum/cum of concrete and sand at 0.4 cum/cum of concrete including cost and conveyance of all materials like sand water coarse aggregate etc complete. Including Fixing of Precast kerbing blocks of 600 mm length true to its alignment as specified by the Dept to form divider including pointing with cement mortar (1.3) prop Cost and conveyance of all materials like cement, sand, water etc to site, including curing and labour charges for mixing, etc complete.

450

241

108450

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

14.4

332

4794

... More
Beautification and Development of parks;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls

560

254

142705

... More
Beautification and Development of parks;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.

560

650

364235

... More
Beautification and Development of parks;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Cost of Seigniorage Charges on all Materials, all taxes including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc.,Complete for Finished item of WorkPer 1 Cum

118.12

5953

703204

... More
Beautification and Development of parks;Plain Cement concrete (1:5:10) using 40 mm metal with hand mixing upto Plinth level

16.8

5453

91620

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

50.4

332

16779

... More
Beautification and Development of parks;Supply and fixing of Artisticbenches with FRP/GRC orhigher grade material in anany thematical shapes of defined size withspecialized skilled artistworked on 3D art objectshaving beautiful design with sustainable qualitY,eniancing appealing view,exfemely durable, longlasting, corrosion freebenches

30

4956

148680

... More
Beautification and Development of parks;Supply and fixing of FRP /GRC Artistic sculPtures in an any thematical shaPes of defined size with specialized skilled artist worked on 3D art objects having beautiful design with sustainable quality, enhancing appealing view, extremely durable, long lasting, corrosion liee scul re at Parks 1

35

5300

185500

... More
Beautification and Development of parks;Supply and fixing of FRP /GRC Artistic sculPtures in an any thematical shaPes of defined size with specialized skilled artist worked on 3D art objects having beautiful design with sustainable quality, enhancing appealing view, extremely durable, long lasting, corrosion liee scul re at Parks 3

40

5300

212000

... More
Beautification and Development of parks;Providing , Fabricating and fixing One Instructional Sign information Sign Board) as specified in Cement Concrete Block Foundation at each location including cost of materials and labour , taxes for complete item of work as directed by the Engineer-in-Charge.

1

22991

22991

... More
Beautification and Development of parks;SUPPLY, Delivery and Installation of Leg Curl : Technical Specification: 1. Dimensions (LxWxH): 1500 x 450 x 650mm. 2. Fabricated with main post of NB 100mm (G.I.) ?C? Class Pipe of approved make. 3. Leg Support frame of NB 65mm and all other pipes of NB 32mm (G.I.) ?C? Class Pipe. 4. All Pipes are powder coated with 80-120 micron thick AkzoNobel or equivalent Paints. 5. All joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 6. Zinc primer paint is applied at all the welding points prior to finishing. 7. Base plate cover and all open end pipes covered by SS / LLDPE Caps. 8. Maintenance free bearings of SKF or equivalent make duly oil sealed and self-lubricated are used in the equipment manufactured. 9. The equipment are fitted with inbuilt limiters to prevent unwanted movements. 10. The equipment is fixed on ground with concrete of minimum strength M-25 and J shaped welded bolts of 18mm thickness. 11. Once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. 12. High tensile steel with galvanized nut bolts are used for assembly. 13. Equipment made to EN16630 & DIN 79000 International standard for outdoor fitness equipment. 14. Self-Explanatory stainless steel label fixed on equipment for ease of use.The Cost includes inland Transportation, Insurance and other Services required to Convey the Goods to the Final Destination but Excluding GST for complete item of work.

1

41550

41550

... More
Beautification and Development of parks;SUPPLY, Delivery and Installation of Leg Extension : Technical Specification: Leg Extension with below specifications: t. dimensions (LxWxH): 750 x 300 x 1200 mm 2. Fabricated with main post of NB l00mm (G.I.j ?C Class Pipe of approved make. 3. Seat Main frame of NB 50mm, Handle frame of NB 25mm, Leg frame of NB 32mm. All pipes used must be G.I.) ?C? Class Pipe. 4. All Pipes are powder coated with 80-120 micron thick AkzoNobel or equivalent Paints. S. All joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 6. Zinc primer paint is applied at all the welding points prior to finishing. 7. Base plate cover and all open end pipes covered by SS / LLDPE Caps. 8. Foothold made of NB 65mm (G.I.) ?C? Class Pipe. 9. Seats made up from virgin LLDPE manufactured by rotational molding with 4.00 mm thickness, colored, UV resistant and environmental friendly. 10. Maintenance free bearings of SKF or equivalent make duly oil sealed and self-lubricated are used in the equipment manufactured. 11. The equipment are fitted with inbuilt limiters to prevent unwanted movements. 12. The equipment is fixed on ground with concrete of minimum strength M-25 and J shaped welded bolts of 18mm thickness. J3. Once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. 14. High tensile steel with galvanized nut bolts are used for assembly. 15. Equipment made to EN16630 & DIN 79000 International standard for outdoor fitness equipment. 16. Self-Explanatory stainless steel label fixed on equipment for ease of use. 17. Handle bars are provided with high end quality rubber grips.The Cost includes inland Transportation, Insurance and other Services required to Convey the Goods to the Final Destination but Excluding GST for complete item of work.

1

37500

37500

... More
Beautification and Development of parks;SUPPLY, Delivery and Installation of Big Arm Wheel wheel with Carrying Capacity of 2 Persons of overall sizes 850x75x1920 mm with standing base of 300 mm dia made of Hot Dipped Galvanized Pipes Confirming to IS 1239(Part-1) with GI thickness 60 micron Materials and Heavy Duty (C Class) series of pipes only.Equipment should be made up of 100 NB Main Post pipe with Supporting Structure 25NB & 40MM NB. Fixed wheel of 550 mm dia having standing positions equally spaced at 120 degrees each fixed with Deep Grooveé Self Aligning Ball Bearings & thrust bearings using hard ware of Grade 4.60 Galvanized.The Painting to the Equipment should be Powder Coated ( 80-100 microns thickness.All open end pipes should be covered with SS/LLDPE caps & the equipment is grouted with M18 Foundation Bolts with Concrete Strength of M25 for Safety and Stability and as directed by the Engineer-in-Charge.The Cost includes inland Transportation, Insurance and other Services required to Convey the Goods to the Final Destination but Excluding GST for complete item of work.

1

59550

59550

... More
Beautification and Development of parks;SUPPLY, Delivery and Installation of AB Bourd Duosdouble equipment with overall sizes 1500x1500x900 mm with standing base of 300 mm dia made of Hot Dipped Galvanized Pipes Confirming to IS 1239(Part-1) with GI thickness 60 micron Materials and Heavy Duty (C Class) series of pipes only.Equipment should be made up of 100 NB Main Post pipe with Supporting Structure 25NB & 40MM NB. Fixed wheel of 550 mm dia having standing positions equally spaced at 120 degrees each fixed with Deep Grooveé Self Aligning Ball Bearings & thrust bearings using hard ware of Grade 4.60 Galvanized.The Painting to the Equipment should be Powder Coated ( 80-100 microns thickness.All open end pipes should be covered with SS/LLDPE caps & the equipment is grouted with M18 Foundation Bolts with Concrete Strength of M25 for Safety and Stability and as directed by the Engineer-in-Charge.The Cost includes inland Transportation, Insurance and other Services required to Convey the Goods to the Final Destination but Excluding GST for complete item of work.

1

42857

42857

... More
Beautification and Development of parks;SUPPLY, Delivery and Installation of Abdominal Rider or Horse Rider : Technical Specification: Leg Extension with below specifications: 1. Dimensions (LxWxH):1000x600x1100 mm 2. Fabricated with main post of NB 100mm (G.I.) ?C? Class Pipe of approved make. 3. Seat Main frame of NB 50mm, Handle frame of NB 25mm, Leg frame of NB 32mm. All pipes used must be G.I.) ?C? Class Pipe. 4. All Pipes are powder coated with 80-120 micron thick AkzoNobel or equivalent Paints. 5. All joints of pipe are robotic welded with joints scalloped as necessary and dressed off removing sharp edges and burrs. 6. Zinc primer paint is applied at all the welding points prior to finishing. 7. Base plate cover and all open end pipes covered by SS / LLDPE Caps. 8. Foothold made of NB 65mm (G.I.) ?C? Class Pipe. 9. Seats made up from virgin LLDPE manufactured by rotational molding with 4.00 mm thickness, colored, UV resistant and environmental friendly. 10. Maintenance free bearings of SKF or equivalent make duly oil sealed and self-lubricated are used in the equipment manufactured. 11. The equipment are fitted with inbuilt limiters to prevent unwanted movements. 12. The equipment is fixed on ground with concrete of minimum strength M-25 and J shaped welded bolts of 18mm thickness. 13. Once the concrete is set, the equipment is fixed on to it and nuts and bolts are covered with base plate cover. 14. High tensile steel with galvanized nut bolts are used for assembly. 15. Equipment made to EN16630 & DIN 79000 International standard for outdoor fitness equipment. 16. Self-Explanatory stainless steel label fixed on equipment for ease of use. 17. Handle bars are provided with high end quality rubber grips.The Cost includes inland Transportation, Insurance and other Services required to Convey the Goods to the Final Destination but Excluding GST for complete item of work.

1

40714

40714

... More
Beautification and Development of parks;SUPPLY, Delivery and Installation of Air Swing with Carrying Capacity of 1 Person of overall sizes 1000x800x1300mm mm made of Hot Dipped Galvanized Pipes Confirming to IS 1239(Part-1) with GI thickness 60 micron Materials and Heavy Duty (C Class) series of pipes only.Equipment should be made up of 100 NB Main Post pipe with Supporting Structure 25mmNB& 40MM NB, 50mm NB and 60 X 40 mm Rectangular Tube with Standing BASE SIZE OF 320 x 135 MM fixed with Deep Grooveé Self Aligning Ball Bearings & thrust bearings using hard ware of Grade 4.60 Galvanized.The Painting to the Equipment should be Powder Coated ( 80-100 microns thickness.All open end pipes should be covered with SS/LLDPE caps & the equipment is grouted with M18 Foundation Bolts with Concrete Strength of M25 for Safety and Stability and as directed by the Engineer-in-Charge.The Cost includes inland Transportation, Insurance and other Services required to Convey the Goods to the Final Destination but Excluding GST for complete item of work.

1

45350

45350

... More
Beautification and Development of parks;Providing of EPDM Flooring for an area of 100 Sq.m including all charges 36 mm inlcuding EPDM granulars with 22% of base polymers , buffing with synthetic rubber , worlsd class binder wet pour flooring as per desired colour and design by the Engineer-In -Incharge on finished surface of PCC /BT including fixing charges, labour charges, conveyance charges etc.,

1130.01

380

429404

... More
Beautification and Development of parks;Saw cut joints for freshly laid concrete pavement including all materials and labour charges.

104

88

9152

... More
Beautification and Development of parks;providing of mechanical trawelling, finishing with sound edges and corners, including hire and operation charges complete for finished item of work.

105

41

4305

... More
Beautification and Development of parks;Supply and placing of the Ready Mix Concrete (RMC) M30 grade using 20 mm Graded Metal (MORD & MORTH 12.8 E) as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm 54%, 10mm 18%, 6mm 18% as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. CASE II : With Batching Plant, Transit Mixer and Concrete Pump Design Mix: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design

10.5

5818

61094

... More
Beautification and Development of parks;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum

4.55

8783

40002

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

4.55

332

1516

... More
Beautification and Development of parks;High performance, water borne, acrylic, line marking paint possessing fast drying, good adhesion & high wear resistance for use on bituminous and concrete. Great for using on roads, car parks, factory lines which could be used as hard wearing paint that is being driven on for marking of Basketball court including all charges.

1

13110

13110

... More
Beautification and Development of parks;Basketball court Pole with height adjustable 6 to10 feet, international standard board size: 180cm x 105cm, 20mm, non scratchable and weatherproof, transparent acrylic board with frame padding, standard pole extension 1.20 mtr, made of 6 inch (12 gauge) square pipe, heavy duty dunking ring &nylon net, pole safety cushion padding on front side, best quality PU spray paint including all charges etc for finished item of work.

1

73500

73500

... More
Beautification and Development of parks;Providing Plain cement concrete (1:2:4) nominal mix using hand mixer as approved by the department using Graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge.

0.22

7040

1521

... More
Beautification and Development of parks;Acrylic 8 Layer Supply and installation of ITF certified 5 layers acrylic system with thickness upto 2mm. The flooring should be certified by International Tennis Federation (ITF) and should have application as first layer of primer (% 100 acrylic latex based emulsion to improve bond of acrylic court system to the asphalt surface having consumption ratio of 0.014kg/sqft), second layer of acrylic Resurfacer (Filling and smoothing asphalt or concrete surfaces in preparation for Acryflex T tennis court system. And also fills the surface chips, voids and conceals repairs while providing a smooth surface for color coating. It should have a consumption ratio of 0.046kg/sqft), third and fourth layer of Precoat (Quartz filled % 100 acrylic latex based textured tennis coat with total consumption ratio of 0.078 kg/sqft) and Fifth layer of Topcoat (100% acrylic latex polymer & colour coat for the finished surface to protect from UV. It should have consumption ration of 0.023 kg/sft). On top of these 5 layers, the line marking should be done with Overline paint (100% acrylic latex based high hiding line paints. It should have consumption ratio of 4 kg/court). The acrylic resurfacer must have silica sand infill to be embedded into it with consumption ratio of 0.065 kg/sqft. The product must be approved/licensed/preferred by the respective International Sports Federation & used at the Indian/International Championships recognized by the respective Regional /International Sports Federation.

1130.22

160

180835

... More
Beautification and Development of parks;Supply and placing of the Ready Mix Concrete (RMC) M30 grade using 20 mm Graded Metal (MORD & MORTH 12.8 E) as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm 54%, 10mm 18%, 6mm 18% as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. CASE II : With Batching Plant, Transit Mixer and Concrete Pump Design Mix: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design

21

5818

122189

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

63

332

20973

... More
Beautification and Development of parks;High performance, water borne, acrylic, line marking paint possessing fast drying, good adhesion & high wear resistance for use on bituminous and concrete. Great for using on roads, car parks, factory lines which could be used as hard wearing paint that is being driven on for marking of Basketball court including all charges.

1

13110

13110

... More
Beautification and Development of parks;Basketball court Pole with height adjustable 6 to10 feet, international standard board size: 180cm x 105cm, 20mm, non scratchable and weatherproof, transparent acrylic board with frame padding, standard pole extension 1.20 mtr, made of 6 inch (12 gauge) square pipe, heavy duty dunking ring &nylon net, pole safety cushion padding on front side, best quality PU spray paint including all charges etc for finished item of work.

1

73500

73500

... More
Beautification and Development of parks;Acrylic 8 Layer Supply and installation of ITF certified 8 llayers acrylic system with thickness upto 2mm. The flooring should be certified by International Tennis Federation (ITF) and should have application as first layer of primer (% 100 acrylic latex based emulsion to improve bond of acrylic court system to the asphalt surface having consumption ratio of 0.014kg/sqft), second layer of acrylic Resurfacer (Filling and smoothing asphalt or concrete surfaces in preparation for Acryflex T tennis court system. And also fills the surface chips, voids and conceals repairs while providing a smooth surface for color coating. It should have a consumption ratio of 0.046kg/sqft), third and fourth layer of Precoat (Quartz filled % 100 acrylic latex based textured tennis coat with total consumption ratio of 0.078 kg/sqft) and Fifth layer of Topcoat (100% acrylic latex polymer & colour coat for the finished surface to protect from UV. It should have consumption ration of 0.023 kg/sft). On top of these 5 layers, the line marking should be done with Overline paint (100% acrylic latex based high hiding line paints. It should have consumption ratio of 4 kg/court). The acrylic resurfacer must have silica sand infill to be embedded into it with consumption ratio of 0.065 kg/sqft. The product must be approved/licensed/preferred by the respective International Sports Federation & used at the Indian/International Championships recognized by the respective Regional /International Sports Federation.

7104.24

160

1136678

... More
Beautification and Development of parks;Saw cut joints for freshly laid concrete pavement including all materials and labour charges.

728

88

64064

... More
Beautification and Development of parks;providing of mechanical trawelling, finishing with sound edges and corners, including hire and operation charges complete for finished item of work.

660

41

27060

... More
Beautification and Development of parks;Supply and placing of the Ready Mix Concrete (RMC) M30 grade using 20 mm Graded Metal (MORD & MORTH 12.8 E) as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm 54%, 10mm 18%, 6mm 18% as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. CASE II : With Batching Plant, Transit Mixer and Concrete Pump Design Mix: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design

66

5818

384022

... More
Beautification and Development of parks;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum

10.97

8783

96369

... More
Beautification and Development of parks;Plain Cement concrete (1:5:10) using 40 mm metal with hand mixing upto Plinth level using 162kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum

4.77

5453

26014

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

198

332

65916

... More
Beautification and Development of parks;Supply and Fixing of Fiero A Swing: All products must be tested and certified to meet EN 1176 safety standards. The EN 1176 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The EN 1176 certificates must be in the name of a supplier who has carried out in excess of at least 100 public park projects in India either by themselves or through their dealers or contractors. These EN 1176 certificates must be clearly displayed on the notified certifying bodies websites as online verification is mandatory. Shaped structural posts of height 2.31 m are to be schedule HOT DIP Galvanized steel with a 114mm OD and 2.2mm (wall) thickness of the tubing. Plastic Components such as swing seats [super thick plastic] shall be animated and shall be rotationally molded from antistatic, copolymer, virgin linear low density UV stabilized polyethylene, with color molded in and minimum thickness of 6 - 8mm. PLAY EQUIPMENT DIMENSIONS: 3.21 m x 1.54 m x 2.50 m

1

99820

99820

... More
Beautification and Development of parks;Supply and Fixing of 4 Seater See Saw: All products must be tested and certified to meet EN 1176 safety standards. The EN 1176 certificates must be issued by a reputed notified International Certifying Body such as IPEMA, TUV, CPSC, or SGS only. The EN 1176 certificates must be in the name of a supplier who has carried out in excess of at least 100 public park projects in India either by themselves or through their dealers or contractors. These EN 1176 certificates must be clearly displayed on the notified certifying bodies websites as online verification is mandatory. The See Saw consists of 2 poles of Dia 114mm and thickness of 2.5mm which balances the horizontal rod at the center which is of size 3110 mm length and Dia 114 mm. It consists of 4 seats which is made of LLDPE virgin plastic of size 305mm X 213 mm X 125 mm. PLAY EQUIPMENT DIMENSIONS: 3.10 m x 0.44 m x 0.80 m

1

86950

86950

... More
Beautification and Development of parks;Supply and Fixing of Merry Go Round - VFM: The Merry go round consists of a round platform which is made of galvanized steel and has a thickness of 2.5 mm. It is also power coated with the thickness of 2.5 mm. It is of Dia 1210 mm. It has 3 inverted ?L? shaped handrails which is made of Galvanized steel and of dimensions as 434 mmx 800 mm. It has thickness of Dia 32 mm. The 3 handrails are separated exactly and 1200each. All the 3 handrails are connected to the Centre with the help of a rod which is also made of Galvanized steel and of Dia 48 mm and height 835 mm. Bolts, nuts, screws, washers and etc. used for assembly shall be stainless steel 304 of tamper resistant stainless steel. Exposed hardware shall be covered with safety caps as per EN1176 standards. Joints are robotic welded. ALL COMPONENTS MEET WITH EN-1176 SAFETY STANDARDS. The supplier must have carried out in excess of at least 100 public park projects in India either by themselves or through their dealers or contractors.All joints are Robotic welded. All components designed and manufactured to meet with EN 1176 safety standards. PLAY EQUIPMENT DIMENSIONS: Dia 1.15 m

1

84907

84907

... More
Beautification and Development of parks;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.

67.8

650

44098

... More
Beautification and Development of parks;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) sand filling

202.5

1330

269382

... More
Beautification and Development of parks;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum

6.07

8783

53336

... More
Beautification and Development of parks;Plain Cement concrete (1:5:10) using 40 mm metal with hand mixing upto Plinth level using 162kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum

3.33

5453

18160

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

7.92

332

2637

... More
Beautification and Development of parks;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls

93.53

254

23834

... More
Beautification and Development of parks;Painting with Ready mixed oil paint (all colours) Two Coats - Old Wood Work & New Iron Work:

37.44

177

6651

... More
Beautification and Development of parks;Supply and fixing of MS grills /bars including labour and conveyance cost complete etc.,Mild steel,structural steel i.e., angles chanels and sections including Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, cost of fixing in position Labour charges for fixing Iron Doors, Iron Windows and Window Grills in position

920

120

110796

... More
Beautification and Development of parks;Providing Plain cement concrete (1:2:4) nominal mix using hand mixer as approved by the department using Graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge.

1.2

7040

8468

... More
Beautification and Development of parks;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing.

80.75

650

52523

... More
Beautification and Development of parks;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum

8.88

8783

77988

... More
Beautification and Development of parks;Providing Plain cement concrete (1:2:4) nominal mix using hand mixer as approved by the department using Graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge.

0.68

7040

4752

... More
Beautification and Development of parks;Flush Pointing with CM (1:3) to RR Masonry including Labour charges like cement fire aggregete (sand) water all cost and conveyance etc complete for finished item of work

27

130

3515

... More
Beautification and Development of parks;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Cost of Seigniorage Charges on all Materials, all taxes including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc.,Complete for Finished item of WorkPer 1 Cum

16.88

5953

100458

... More
Beautification and Development of parks;Plain Cement concrete (1:5:10) using 40 mm metal with hand mixing upto Plinth level using 162kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum

1.8

5453

9816

... More
Beautification and Development of parks;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

16.88

332

5618

... More
Beautification and Development of parks;Engaging of JCB on hire basis including all charges etc complete

16

850

13600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.