Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Civil Works Others
Opening Date22 Nov 2024
Closing Soon25 Nov 2024
Tender Amount₹ 10,39,600 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of greenery;S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour charges (1x75x3=225)

225

500

112500

... More
Development of greenery;Laying of PCC (1:2:4) prop : Using 20mm HG metal including cost & convayance of all Materials & labour charges (1x1x120x0.3x0.5=18)

18

5453

98154

... More
Development of greenery;Supply annd fixing of MS Bolts 2 1/2 including labour charges of all material welding etc complete (1x75x0.15=11.25)

11.25

81

911.25

... More
Development of greenery;Supply, frabication and fixing of steel works like window grills, compound wall grills, iron doors, windows, frames made of mild steel, structural steel i.e angles, channels, I-sections 9 As oer IS 2062-E250 BR) including cost and conveyance of all materials and fixing in position fabrication charges etc complete

750

109

82350

... More
Development of greenery;Providing and fixing Mandatory/ Regulatory sign boards size 600mm circle made out of Type -XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and conforming to IRC 67:2012 for full background of white colour and letters/logos done by screen printing in black colour, boarders by screen printing in Red colour and fixed over 3MM aluminnium Composite material sheet having minimmum 0.3mm thick aluminnium skin on both sides with back side painted grey colour and fxed overback support frame of M.S angle 25x25x3mm all roundand fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1m from the ground level to the bottom of the board. thesignpost should be painted with one coat of red oxide paint and 2 coats ofsynthetic enamel paint Black an white colour withbands of 30cm of height. the Signpost shall be firmly fixed with MS base angle 35x35x4mm into the ground by M-15 concrete foundation of size 450x450x600mm including cost and conveyance of all materials,equipment machinery etc.,

2

5126

10252

... More
Development of greenery;Carting the excavated earth to alead of 15 km from site including loading and unloading etc., complete

84

267

22470

... More
Development of greenery;Engaging of levelling of surface, dressing etc

50

728

36400

... More
Development of greenery;Aligment and stacking including cost of stakes

150

97

145.63

... More
Development of greenery;Digging of pits 0.45 mt X 0.45 mt X 0.45 mt

150

2845

4267.52

... More
Development of greenery;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 x 42% cft/pit =0.21 cft)

150

1074

1612.01

... More
Development of greenery;Application of FYM including internal distribution in red soil areas 60 cm pit

150

103

155.88

... More
Development of greenery;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)

150

861

1292.84

... More
Development of greenery;Internal transporation of Bag plants to planting site

150

370

555.51

... More
Development of greenery;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)

150

2139

3208.8

... More
Development of greenery;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

150

17

2604

... More
Development of greenery;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)

1

150

150

... More
Development of greenery;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

150

57

85.65

... More
Development of greenery;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

1

150

300

... More
Development of greenery;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

150

293

440.88

... More
Development of greenery;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival

30

2261

678.3

... More
Development of greenery;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 1500 x 20ltrs x 43/25000=34.4 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5

5.16

3352

17297.87

... More
Development of greenery;Maintenance of Greenery and protection,Sweeping the pathways etc Circle-17, Khairtabad Zone, GHMC including ESI and EPF for 12 months wage=17027/- including ESI & EPF amounts (3.25% + 13%)

1

17027

187297

... More
Development of greenery;Add GST 18%

1

18

128410.66

... More
Development of greenery;Misceallaneous

1

1022

10499.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.