Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 28,225Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
539441Tender No
1462/DUB/GHMC/2023-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Raising and maintenance of TKHH;Application of FYM including internal distribution in red soil areas 60 cm pit
500
247
1237.32
Raising and maintenance of TKHH;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
500
861
4309.45
Raising and maintenance of TKHH;Internal transporation of Bag plants to planting site
500
608
3042.2
Raising and maintenance of TKHH;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
500
2139
10696
Raising and maintenance of TKHH;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
500
28
14000
Raising and maintenance of TKHH;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
-
525
525
Raising and maintenance of TKHH;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
500
57
285.5
Raising and maintenance of TKHH;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
-
1050
1050
Raising and maintenance of TKHH;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
500
293
1469.6
Raising and maintenance of TKHH;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"X16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
100
2261
2261
Raising and maintenance of TKHH;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 500 x 20ltrs x 43/25000=17.2 or 17 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5 ( Subject to changes in the Unit rates)
17
3352
56989.1
Raising and maintenance of TKHH;(B) SHRUB PLANTATION (a) Raising Year: Digging of pits of size 0.30x0.30x0.30 mts @ 0.5mtrs apart (766.38 / 100 x 50%) (50% adopted because of fresh filled soil)
5500
536
29505.63
Raising and maintenance of TKHH;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.50cmt)=2558.73/8 = 319.84
5500
319
17591.2
Raising and maintenance of TKHH;Application of FYM including internal distribution 30cmt cube pit = 176.76 / 8 = 22.09 (Proportionate rate calculated)
5500
30
1701.15
Raising and maintenance of TKHH;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (6"x 8"/ 8"x12" / 9"x11" bag size)
5500
861
47403.95
Raising and maintenance of TKHH;Internal transport of bag plants to planting site (6"x 8"/ 8"x12" / 9"x11" bag size)
5500
278
15307.6
Raising and maintenance of TKHH;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
-
11999
11999
Raising and maintenance of TKHH;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (6"x 8"/ 8"x12" / 9"x11" bag size)
5500
460
25317.6
Raising and maintenance of TKHH;Application of chemicals and fertilizers/Neem Cake etc
5500
293
16166.15
Raising and maintenance of TKHH;Cost and supply of water @ 5 Ltrs / Sqm in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (1500x0.60=900 Sq x 5 x 180/25000) =32.4 or 33 ( Subject to changes in the Unit rates)
33
3352
110625.9
Raising and maintenance of TKHH;(C) Watch and ward and maintenance of the plants: Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth (12) months @ One person / 1000 mts
1.5
14675
264150
Raising and maintenance of TKHH;GST 18 %
1
131917
131917.51
Raising and maintenance of TKHH;Misc
1
57
57.45
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements