Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date24 Jul 2024
Closing Date30 Jul 2024
Tender Amount₹ 8,05,371 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction Community Hall;Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand}

151.2

546

82563

... More
Construction Community Hall;Plastering 12mm thick in two coats with base coat of 8mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand}

151.2

528

79894

... More
Construction Community Hall;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire and labour charges for cutting, bending, shifting to site, tying etc.. where they are not welded.

78.64

61

4847

... More
Construction Community Hall;Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS:2202 .including Cost and Conveyance of all materials,labour complete etc.

14.4

2300

33120

... More
Construction Community Hall;Powder Coated Mild Steel Hallow single rebate door frames manufactured using cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) and profile size of 105 x 60 mm conforming to IS 4351 - 2003 including pre-treatment, Galvanized as per IS:277, zinc phosphating finished with hermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powdercoating paint thickness 60 ? 65 microns(Dry film thickness) Stainless Steel Ball Bearing Butt Hinges3 mm thick fixed flush to the frame with Hinges, Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and dou ble shutter doors.

21.6

732

15811

... More
Construction Community Hall;Supply, Delivery and Fixing of 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 with bell ends(Socket) as per specification in casing pipe 4Kg/Sqcm etc., complete including cost and conveyance of all materials for finished item of work(SSR-13-14,PGNO;59)

50

369

18450

... More
Construction Community Hall;Flooring with Vetrified tiles of1st quality set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete for finished item of work,

150

1167

175133

... More
Construction Community Hall;Painting with synthetic enamel paint in all shades Grade-I two coats including cost and conveyance of Synthatic enamel paint ( at 20Sqm /Lr as per British paints(I) Ltd.,) , labour charges, etc., complete for new iron work

100

132

13212

... More
Construction Community Hall;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work(Qty as per Plastering)

400

151

60652

... More
Construction Community Hall;Pre Laminated Cement Bonded Particle Board WINDOWS ? Double shutter 3?0? x 3?0? outer frame section size of 50mm x 60mm shutter frame section size of 48mm x 25mm Mullion section size of 50mm x 60mm for outer frame.

21.6

8024

173318

... More
Construction Community Hall;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap including Cost and Conveyance of all materials,labour complete etc. (TBSP-E.II-020)

2

2081

4162

... More
Construction Community Hall;Supply & fixing of PVC low level system with internal components & short bend: 10 Litres capacity Single Flush including Cost and Conveyance of all materials,labour complete etc.

2

1740

3480

... More
Construction Community Hall;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5 including Cost and Conveyance of all materials,labour complete etc.

30

155

4650

... More
Construction Community Hall;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5 including Cost and Conveyance of all materials,labour complete etc. (tbsp-j.III-02)

20

178

3560



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.