Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Building Construction
Opening Date6 Mar 2025
Closing Soon13 Mar 2025
Tender Amount₹ 7,58,249
Costs
EMD
₹ 7,582Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579539Tender No
29/EEC-4/LBNR/GHMC/115/2024-25, DT:04.03.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of Toilets;Supply of 3 Plate Jumbo Ceiling Rose of makes Anchor / Gold Medal Olive / Million Zoom.(ELEC-1.7.1 m)
4
25
100
... More
Construction of Toilets;Supply of 16A flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1 h)
4
72
288
... More
Construction of Toilets;Supply of 16A Triangle Plug Top of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(k)
4
40
160
... More
Construction of Toilets;Supply of 16A flush type Socket with shutter of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1i)
4
72
288
... More
Construction of Toilets;Supply of 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega(ELEC-1.7.1)
4
20
80
... More
Construction of Toilets;Supply of PVC insulated 2 core 1.5 Sqmm sheathed flexible copper cable for voltage up to 1100V as per IS 694/1990 of makes Finolex / RR Kable / KEI.(ELEC-1.5.5e)
40
6000
2400
... More
Construction of Toilets;Supply of Decolam Board of Size 4" x 4"(ELEC-1.4.2)
6
16
96
... More
Construction of Toilets;Supply of 4 Module box(ELEC-1.3.1)
12
130
1560
... More
Construction of Toilets;Supply of PVC Junction Boxes Deep size 25mm(ELEC-1.2.6)
6
28
168
... More
Construction of Toilets;Supply of ISI 20mm outer dia medium (1.55mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar(ELEC-1.2.1)
100
25
2500
... More
Construction of Toilets;Supply of ISI 25mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar(ELEC-1.2.2)
100
32
3200
... More
Construction of Toilets;S&F of 15 mm brass body Premium variety Chromium plated finish Swan neck tap with right/left hand operating knob with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 and with a warranty of 10 years(TBSP-F.III-03)
4
1760
7040
... More
Construction of Toilets;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931. SSR- TBSP-F.I-02
4
661
2644
... More
Construction of Toilets;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931(TBSP-F.IV-07)
4
676
2704
... More
Construction of Toilets;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm(TBSP-H.I-01 )
5
301
1505
... More
Construction of Toilets;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm(TBSP-H.I-03)
5
569
2845
... More
Construction of Toilets;Supply of 32mm PPR Tee conforming to DINStandards8077/8084
15
56
840
... More
Construction of Toilets;Supply of 25mm PPR Tee conforming to DINStandards8077/8084
12
33
396
... More
Construction of Toilets;Supply of 20mm PPR Tee conforming to DINStandards8077/8084(TBSP-J.III-65)
15
19
285
... More
Construction of Toilets;Supply of 32mm PPR Elbow conforming to DIN Standards 8077/8084(TBSP-J.III-58)
12
47
564
... More
Construction of Toilets;Supply of 25mm PPR Elbow conforming to DIN Standards 8077/8084(TBSP-J.III-57)
12
24
288
... More
Construction of Toilets;Supply of 20mm PPR Elbow conforming to DIN Standards 8077/8084(TBSP-J.III-56)
30
21
630
... More
Construction of Toilets;Supply of 32mm PPR Socket conforming to DIN Standards 8077/8084
10
23
230
... More
Construction of Toilets;Supply of 25mm PPR Socket conforming to DIN Standards 8077/8084
5
18
90
... More
Construction of Toilets;Supply of 20mm PPR Socket conforming to DIN Standards 8077/8084 (TBSP-J.III-40)
50
13
650
... More
Construction of Toilets;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 ( TBSP-J.III-03 )
30
235
7050
... More
Construction of Toilets;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 13.5 ( TBSP-J.III-02 )
50
178
8900
... More
Construction of Toilets;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 13.5 ( TBSP-J.III-01 )
50
155
7750
... More
Construction of Toilets;Supply & fixing of PVC low level system with internal components & short bend: 10 Litres capacity Single Flush (TBSP-H.II-07)
2
1740
3480
... More
Construction of Toilets;Supply, Installation and commissioning approved make floor mounted Anglo Indian wash down EWC conforming to IS:2556 (Part 8)-2004 suit with 'P' or 'S' trap with dual flush porcelain cistern fixed on wash down EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap & 15 mm angle stop cock & 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour
2
6216
12432
... More
Construction of Toilets;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 410 x 265 x 305 mm
6
3483
20898
... More
Construction of Toilets;Providing Brick masonry seat for Orissa pan/ Indian W.C. using traditional common burnt clay bricks as per standard practice
2
333
666
... More
Construction of Toilets;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556- Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm
2
2207
4414
... More
Construction of Toilets;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
2000
10
20000
... More
Construction of Toilets;Providing and fixing fixing factory made solid wood plymer composite (WPC) single exruded door frame section of 100x65mm with encapsulation of 6mm rigid layer on all external surfaces. The door fame will have a rebate of 32mm 137mm the two vertical members are to be joined together with the horizontal member using 8x75mm long MS dtar full thread screws to be used with reverse forward speed control hand drilling machine. the ready/assembled door frame is fixed to wall using 2 hand fast 300mm long hold fast for toilets. (TBSC-L.I-17)
11.6
777
9013
... More
Construction of Toilets;Providing and fixing 30mm thick WPC ( Wood Plastic Composition ) Door Shutters as per manufacture specification fitted with Hinges, 1 Nos of 300 mm long MS Power coated Aldrop, 2 Nos of 150 mm long Aluminium door handle, 1 No.of 250 mm long 10mm Aluminium tower bolt, 1 no. 250 mm long Aluminium flat latch, including cost and conveyance of all material , all fixtures and all labour charges etc, for fixing etc, complete. (TBSC-L.I-18)
3.6
2138
7697
... More
Construction of Toilets;Flooring with ceramic tiles(non-skid), set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
18
1118
20130
... More
Construction of Toilets;Providing and fixing wall dado with cement based adhesive in specified thick and pointing with specified colour epoxy grout excluding cost of tiles (TBSC-C.IV-10)
2.4
196
470
... More
Construction of Toilets;Supply of glazed full body porcelain tiles for external cladding purposes of any size and thickness between 6-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs (TBSC-C.VI-01)
52.8
578
30518
... More
Construction of Toilets;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg (TBSP-B.II-02)
5
4610
23050
... More
Construction of Toilets;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping. (TBSP-A.I-02)
80
531
42480
... More
Construction of Toilets;Supply and placing of mild steel flats, angles, channels Isections including its all necessary fittings & fixtures etc., complete
120
128
15456
... More
Construction of Toilets;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls
65.16
2734
17819
... More
Construction of Toilets;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
18
6106
10992
... More
Construction of Toilets;Plastering 12mm thick in two coats, first with 8mm thick in cement mortar (1:5) prop and second with 4mm thick in cement mortar (1:3) prop including cost and conveyance of all materials to site Screening and mixing, laying finishing with sponge finish and watering, curing including all labour charges ,hire and operational charges,scaffolding etc., complete for finished item of work.
65.16
5526
36010
... More
Construction of Toilets;Plastering 20mm thick to masonry walls to external side with 16mm in C.M(1:6) prop.as Ist coat and 4mm in C.M (1:4) prop. as II nd coat with dubara sponge finishing and curing etc., incidental labour charges such as scaffolding mixing mortar,curing etc.complete as per specification and drawings for finished item of work.-
35.91
5701
20475
... More
Construction of Toilets;Brick masonry in C.M (1:6) prop. Using IInd class traditional size bricks of locally available size of 23x11x7 CM having a crushing strength of not less than 35 Kg/CM² including cost and conveyance of materials to site, mixing of cement mortar and laying of bricks and mortar to specified thickness, watering, curing, including all scaffolding, hire and operational charges of machinery, all labour charges and all water lead charges etc., complete for finished item of work.
12.57
7712
96955
... More
Construction of Toilets;Filling with Good Gravel soil, including supply and delivery of good gravel for filling, including cost of gravel, seinourage charges and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
16.2
445
7221
... More
Construction of Toilets;Construction of RR Masonary in C.M (1:6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.
4.97
4708
23391
... More
Construction of Toilets;Supplying, fitting and placing of HYSD fe 500 bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded.
1335.74
58
78662
... More
Construction of Toilets;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (400 Kgs Cement) For Slab 125mm Thick
19.2
1567
30087
... More
Construction of Toilets;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (400 Kgs Cement) For Roof Beams
1.27
13118
16655
... More
Construction of Toilets;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (400 Kgs Cement) For Plinth Beams
1.27
14127
17937
... More
Construction of Toilets;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (400 Kgs Cement) For Columns
1.44
14942
21518
... More
Construction of Toilets;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including centering, shuttering. (400 Kgs Cement) For Footings
4.75
11032
52428
... More
Construction of Toilets;Plain Cement Concrete (1:2:4) prop (cement : fine aggregate: Coarse aggregate) using 20mm size hard granite m/c metal including cost and conveyance of all materials like cement, sand,coarse aggregate water etc., and labours charges, for mixing laying concrete ramming in 15 CM layers, finishing top surface to the required level curing etc., Complete for finished item of work as per (SS .402).
1.01
6011
6059
... More
Construction of Toilets;Plain Cement Concrete (1:5:10) prop (cement : fine aggregate: Coarse aggregate) using 40mm size hard granite m/c metal including cost and conveyance of all materials like cement, sand,coarse aggregate water etc., and labours charges, for mixing laying concrete ramming in 15 CM layers, finishing top surface to the required level curing etc., Complete for finished item of work as per (SS .402).
5.41
4801
25967
... More
Construction of Toilets;Carting of excavated surplus earth to an initial lead of 15.00 km from site of work including loading, unloading & conveyance charges etc., complete
40.28
256
10335
... More
Construction of Toilets;Earth work excavation for foundations Ordinary Soil-Manual Means-Upto 3 m depth and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
40.28
293
11803
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%