Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Opening Date4 Jan 2025
Closing Date7 Jan 2025
Tender Amount₹ 10,48,410 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
MAINTENANCE WORK;Construction of 900mm dia Brick Masonry in CM(1:6) pro. Inspection Chamber upto 3' depth including plastering in CM(1:3) pro. 20" dia light 20kg CI Cover with frame.

1

3813

3813

... More
MAINTENANCE WORK;Supply and fixing of 3 modular box including all charges etc., complete.

8

72

576

... More
MAINTENANCE WORK;Supply and fixing of 3 modular vertical frame including all charges etc., complete.

8

69

552

... More
MAINTENANCE WORK;Supply and fixing of 6 modular box including all charges etc., complete.

8

116

928

... More
MAINTENANCE WORK;Supply and fixing of 6 modular vertical frame including all charges etc., complete.

8

96

768

... More
MAINTENANCE WORK;Supply and fixing of 12 modular box including all charges etc., complete

8

186

1488

... More
MAINTENANCE WORK;Supply & fixing of of FRPVC insulated flexible copper wire (Service wire) incl. all labour charges,etc complete

20

95

1908

... More
MAINTENANCE WORK;Supply of 40-63A 10KA TP MCB, C/D Curve ISI Mark of make Legrand / Schneider. including cost and conveyance of all incidental, operational, labour charges such as placing in position, tying including other taxes on all materials etc., complete for finished item of work.

2

1340

2680

... More
MAINTENANCE WORK;Supply & fixing 6A 3 pin wall plug socket 6A switch control 16A fuse unit, etc complete.

8

357

2860

... More
MAINTENANCE WORK;Supply & fixing of of Panel Board incl. all labour charges,etc complete.

1

2942

2942

... More
MAINTENANCE WORK;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

8

407

3256

... More
MAINTENANCE WORK;Supply and Fixing of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom, including cost and conveyance of all incidental, operational, labour charges such as placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors.

2

1842

3684.5

... More
MAINTENANCE WORK;Supply and Transportation of 1x36/40W box type tube light luminaire with copper / VPIT Choke, condensor, starters etc., and 1No 36/40W tube etc., complete of Crompton, Philips make,etc complete.

4

314

1257.4

... More
MAINTENANCE WORK;Supply and fixing of 550x400mm Flat back wash hand basin made by Nycer or any approved quality made fixed over CI brackets including all charges etc.,

1

1469

1469

... More
MAINTENANCE WORK;Supply and Fixing of 12.07mm brass bib cock indian make including all charges, etc complete.

2

223

446

... More
MAINTENANCE WORK;Supply and Fixing of PVC Water Storage Tank of Standard make,etc complete.

1000

7

7000

... More
MAINTENANCE WORK;Supply and Fixing of 12.07mm (1/2")dia GI Pipe Class B with necessary GI Fittings including c/c of all materials and labour etc., complete

6

204

1224

... More
MAINTENANCE WORK;Supply and Fixing of 25.40mm (1") dia GI Pipe Class B with necessary GI Fittings including c/c of all materials and labour etc., complete

6

268

1608

... More
MAINTENANCE WORK;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap including cost and conveyance of all incidental, operational, labour charges such as placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors.

1

1619

1619

... More
MAINTENANCE WORK;Supply and Fixing of Nahny Trap of 76.02mm including all charges,etc complete

5

111

555

... More
MAINTENANCE WORK;Providing Oil Bound Distemper two or more coats of approved make, shade and colour to give uniform shade to all interior plastered faces of walls over a primary coat of white cement paint (total 3 coats) including cost and conveyance of all materials & labour charges,etc complete.

248.4

1391

34552.44

... More
MAINTENANCE WORK;Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 84) per 10 Sqm. FOR GROUND FLOOR

280.8

5065

142232.78

... More
MAINTENANCE WORK;Providing and Fixing of High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black

90.72

2576

233694.72

... More
MAINTENANCE WORK;Supplying & Fixing of MS Grill 2x2.5 Mtr of allround 30mm X 20mm with 10mm Square Bars horizontal & vertical ventilator and windows as per drawing including fabrication charges, all cost and conveyance of all materials and labour charges etc.,

558

79

44082

... More
MAINTENANCE WORK;Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm x 50 mm and without grill provision is of 75 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter and cut to length mitre joined with corner brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work Window with Two Sliding Shutters and without Grill Outer Frame Size 75 mm x 50 mm.

5.76

4950

28512

... More
MAINTENANCE WORK;Supplying and fixing of Flush door shutters, solid bond wood block board type with commercial type on both faces, 35 mmthick conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/ STANDARD/ SHUBHDWAR/ ITP including fittings cost and conveyance of all labour charges for loading and unlaoding etc., complete for finished item of work.

4.31

1564

6740.84

... More
MAINTENANCE WORK;Supplying and Fixing of best seasoned non teak wood door frame of size 100mm x 65mm with single leaf shutter of 32mm thick commercial ply wood including cost and conveyance of all materials and labour charges etc., with the following Aluminium fixtures 1.

4.31

1903

8201.93

... More
MAINTENANCE WORK;Providing Impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick mixing with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and Conveyance of all materials, seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining at regular invervals of 450 mm X 450 mm curing, rounding off junctions of wall and slab etc,, complete for finished item of work

16.2

5634

9127.19

... More
MAINTENANCE WORK;Parapet wall in CM(1:3)

1.46

6864

10022.59

... More
MAINTENANCE WORK;Brick Masonary 2nd Class Table moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site Cost of Seigniorage Charges on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. (S.S. No. 504), per 1 Cum. FOR GROUND FLOOR

18.51

7485

138551.61

... More
MAINTENANCE WORK;Supply and filling with good gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

12.15

432

5255.48

... More
MAINTENANCE WORK;Refilling of the excavated earth in foundations incl. all labour charges,etc complete.

2.92

37

109.82

... More
MAINTENANCE WORK;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

1296.3

77

99879.68

... More
MAINTENANCE WORK;Randum Rubble Stones in Cement Mortor 1:6 Prop using hard granite stone including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc.,including cost of Seigniorage Charges on all Materials, all taxes including Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing , Etc., complete for finished item of work. (As per SS 615). per 1 Cum

8.75

4161

36409.98

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Doors

0.25

11135

2783.93

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Lintels

0.4

10198

4079.33

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Roof slab

32.4

1246

40376.23

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Roofbeams

2.24

10344

23172.49

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Staircase

3.18

11591

36860.84

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Coloumns

1.66

11591

19241.82

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Plinth Beams

1.12

11777

13191.19

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Pedastals

0.36

9707

3494.61

... More
MAINTENANCE WORK;VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm to 6 mm nominal size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement (Minimum Cement Content is 400 Kgs / m3), fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, Vibrator, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering. Footings

3.36

9034

30356.42

... More
MAINTENANCE WORK;Plain Cement concrete 1:5:10 prop (Cement : fine aggregate: coarse aggregate ) for foundation and under flooring bed using 40mm size (SS 5) Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement (Minimum Cement Content is 129.60 Kgs / m3), sand, coarse aggregate water etc., to site , cost of seigniorage charges on all materials, labour charges , for mixing , laying, concrete in foundation ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work per 1 Cum.

2.31

4095

9460.28

... More
MAINTENANCE WORK;Carting of excavated earth with Manually, loading, transportation, unlaoding to an average lead of about 20 KMts, from the circle-9 jurisdition, including the tranport vehicles, cost and conveyance of all materials and all labour charges but excluding contractor profit and over head charges etc., complete for finished item of work as directed by the GHMC officers.

36.33

249

9068.33

... More
MAINTENANCE WORK;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Manual Means

12.03

264

3187.83



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.