Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Construction Material
Pipe Line Project
Opening Date5 Mar 2025
Closing Soon12 Mar 2025
Tender Amount₹ 58,03,739
Costs
EMD
₹ 58,037Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
579678Tender No
NIT No.26/4/SE-M/LBNZ/GHMC/J2&J3/2024-25, date:01.03.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced) NP3 Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation 10km lead etc- 1000mm Dia. RCC NP3 class pipes
105
8883
932773.8
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced) NP3 Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation 10km lead etc- 900mm Dia. RCC NP3 class pipes
100
7847
784761
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Lowering the RCC S/S for NP3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 For 600 mm dia- 1200mm Dia. RCC NP3 class pipes
65
770
50050
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Lowering the RCC S/S for NP3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 For 600 mm dia- 1000mm Dia. RCC NP3 class pipes
105
770
80850
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Lowering the RCC S/S for NP3 pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985 For 600 mm dia- 900mm Dia. RCC NP3 class pipes
100
644
64400
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Manufacture, Supply and Delivery of Rubber rings to suit R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. the Rubber Rings shall be tested at the factory premises conforming to B.I.S. 5382/1985. - 1200mm Dia. RCC NP3 class pipes
23
1679
38617
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Manufacture, Supply and Delivery of Rubber rings to suit R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. the Rubber Rings shall be tested at the factory premises conforming to B.I.S. 5382/1985. - 1000mm Dia. RCC NP3 class pipes
37
1043
38591
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Manufacture, Supply and Delivery of Rubber rings to suit R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. the Rubber Rings shall be tested at the factory premises conforming to B.I.S. 5382/1985. - 900mm Dia. RCC NP3 class pipes
33
865
28545
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and delivery of DI covers with frame, cover of size 600mmx600mm -weight 90kg incl.cost and conveyance charges
14.5
12807
185701.5
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH For pipe line
874.8
112
98826.16
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH - For Catch-pits
190.31
112
21499.32
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH -For Catch-pit foundation
13.59
112
1535.26
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and placing of Ready Mix Concrete M 10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete-For catch pits
13.59
4958
67398.36
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and placing of RCC M 20 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.. -For catchpit -Bottom slab
13.59
5385
73214.31
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and placing of RCC M 20 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.. -For catchpit side walls 400mm thick
91.35
7423
678129.42
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and placing of RCC M 20 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.. -For catchpit -Top slab
13.2
8500
112158.56
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.
10041.79
66
671896.42
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Carting the excavated earth to a lead of 10 KMS including Labour chargess for loading and unloading, Transportation etc. complete as per specification
371.08
204
75701.34
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Filling with Earth filling (ordinary soil) useful excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
612.36
62
38039.8
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Earthwork in excavation for structures(manual means) as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
218.7
332
72807.42
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH- For Restoration
72.9
2111
153960.43
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and placing of the Ready Mix Concrete of M10 grade from GHMC approved RMC suppliers as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard Mix Design as per IS-10262:1982 with coarse aggregate of nominal size 20 mm and fine aggregate of Zone-II as per the Mix Design approved by the Department from standard suppliers including cost and conveyance, vertical pumping up to 5 floors/ horizontal pumping up to 60.0 M for buildings/ pavements etc., works for basic cost including levelling, grading, spreading, curing, , centering, vibrating, compacting, finishing etc as required including material VAT, excise duty, pumping, transportation approved admixture etc complete.For Restoration
48.6
4740
230401.91
... More
Laying of 1000mm RCC and 900mm dia RCC NP3;Supply and placing of the Ready Mix Concrete of M30 grade from GHMC approved RMC suppliers as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard Mix Design as per IS-10262:1982 with coarse aggregate of nominal size 20 mm and fine aggregate of Zone-II as per the Mix Design approved by the Department from standard suppliers including cost and conveyance, vertical pumping up to 5 floors/ horizontal pumping up to 60.0 M for buildings/ pavements etc., works for basic cost including levelling, grading, spreading, curing, , centering, vibrating, compacting, finishing etc as required including material VAT, excise duty, pumping, transportation approved admixture etc complete 150mm thick-For Restoration
72.9
5449
397286.05
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%