Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 15,703Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
536597Tender No
SO.No R/1572/UB/23-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Avenue Plantation;Application of FYM including internal distribution in red soil areas 60 cm pit
1365
247
3377.88
... More
Avenue Plantation;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
1365
861
11764.8
... More
Avenue Plantation;Internal transporation of Bag plants to planting site
1365
608
8305.21
... More
Avenue Plantation;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
1365
2139
29200.08
... More
Avenue Plantation;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
1365
28
38220
... More
Avenue Plantation;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
1
-
1400
... More
Avenue Plantation;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
1365
57
779.41
... More
Avenue Plantation;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1
-
2800
... More
Avenue Plantation;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
1365
293
4012.01
... More
Avenue Plantation;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
1365
2261
6172.53
... More
Avenue Plantation;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 1365 x 20 ltrs x 43/25000=46.96 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June= 5
273
3352
157424.01
... More
Avenue Plantation;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth (12) months
46.96
1010
165541.19
... More
Avenue Plantation;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size) Over and above 3 Km for additional 20 Km lead add following rates per km per 100 Plants
1365
-
70559.72
... More
Avenue Plantation;Contingency
1
-
0.61
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements