For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date31 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 8,22,206 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
others;Supplying, fitting and placing HYSD Fe 500 Grade steel for RCC works complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, including cost of all materail like HYSD bars, binding wire, chairs, space bars and all labour charges for cutting, bending, placing position, shifting to site, tying etc.. complete where they are not welded

1151.5

68

79327

... More
others;Supply and fixing of Cement Bonded PrelaminatedParticle Board door shutter made out of U sections of size 12x14x12 made from 0.6mm thickpps sections with 12MM Cement BondedPrelaminated Particle Board with necessaryscrews fixed at every 1?.0?interwells. Thehardware consists of 250mm long Aldrops ? 2Nos.150mm Handle- 1 No , 150 mm long mspowder coated tower bolt 1 no. nickel coated. Thecost is inclusive of all incidentals, labour transportation charges TBSC-L.II-15

4.2

2566

10777

... More
others;Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick CRCA section, size should be 50 x 60 mm with 32 mm rebate. The corner of the frame should be welded. The frame should be painted with one coat of primer and finished painted with pure polyester paint. The frame should be provided with approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 75 mm SSR 17-18,TBSC-L.I-09

4.2

267

1121

... More
others;Plastering 20mm thick in single coat in C.M. (1:4) with dubars sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to site ,on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, Scaffolding , lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surfaces of walls. excluding cost of seigniorage charges

111.04

324

36087

... More
others;Plastering12mm thick in two coats with base coat of 8mm thick in C.M. (1:4) and topcoat of 4mm thick in C.M (1:2) with sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, on all materials, all taxes, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls cost of excluding seigniorage charges

71.04

599

42607

... More
others;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site on all Materials, all taxes including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum. excluding Cost of Seigniorage Charges

34.28

8644

296326

... More
others;Plinth beams ( short wall side )

1.51

14807

22360

... More
others;slab(125mm thick)

6.75

8821

59547

... More
others;Columns

3.75

16041

60157

... More
others;Pedestal

0.55

12349

6792

... More
others;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete , .but ex cluding Seigniorage charges, cost of steel and its fabrication charges, including centering and shuttering charges for finished item of work

3.89

11546

44914

... More
others;Construction of in CRS Masonary 2nd Sort in Cement Mortor 1:6 Prop using hard granite stone (coursed rubbel stone), bond stones including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, bond stones Etc.,including on all Materials, all taxes including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum excluding Cost of Seigniorage Charges

14.04

5621

78933

... More
others;Plain Cement Concrete (1:5:10) using 40mm metal with hand mixing up to plinth level using 129.60kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing etc., complete for finished item of Work.1 Cum ex cluding Cost of Seigniorage Charges

5.35

5344

28591

... More
others;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

26.19

315

8264



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.