Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 615Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
538033Tender No
Nit.No.191/CRZ/epro/GHMC/23-24(7th Recall)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Estimate for the Development and Maintenance;Application of FYM including internal distribution in red soil areas 60 cm pit
95
103
98.73
Estimate for the Development and Maintenance;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (8"x12" / 9" x 11" bag size)
95
542
515.08
Estimate for the Development and Maintenance;Internal transporation of Bag plants to planting site
95
370
351.82
Estimate for the Development and Maintenance;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (8"x12" / 9" x 11" bag plants)
95
2139
2032.24
Estimate for the Development and Maintenance;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
95
17
1649.2
Estimate for the Development and Maintenance;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
95
-
95
Estimate for the Development and Maintenance;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
95
57
54.24
Estimate for the Development and Maintenance;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
95
-
190
Estimate for the Development and Maintenance;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
95
293
279.22
Estimate for the Development and Maintenance;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
19
2261
429.59
Estimate for the Development and Maintenance;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 2945 x 10ltrs x 43/25000= 50.7 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June = 5
1.63
3352
5477.66
Estimate for the Development and Maintenance;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth (12) months
95
505
5757.57
Estimate for the Development and Maintenance;Thorny fencing with nearby available material around the plant
95
10
950
Estimate for the Development and Maintenance;Add GST 18%
1
-
2868.97
Estimate for the Development and Maintenance;Contingencies
1
-
34.74
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements