Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Drainage Work
Opening Date9 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 3,42,65,509 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SWD 5;Supply and placing of Plain Cement Concret (PCC) M15 by Ready Mix Concrete (RMC) in open foundations as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 275 Kgs) and with 20mm size graded (40mm - 60%, 20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days etc.,complete for finished item of work but excluding seigniorage charges as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for levelling course under CC Road. Note: 1. The quatities for cement, coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 275 Kg/Cum. As per mix design, if the cement content is found to be less than 275 Kg/Cum of concrete, the difference in cost shall be deducted

72.9

5267

383987.63

... More
SWD 5;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (using hard broken stone of granite trap dolerite and dolamite free from dust obtained by quarrying wedging, breaking, burning and splitting (quartzite and basalt with aggregate impact of less than 20) specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

145.8

2917

425298.6

... More
SWD 5;Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MORTH Clause 301.

328.05

90

29626.2

... More
SWD 5;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8)150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

54

16142

871690.68

... More
SWD 5;Labour charges only for laying, jointing and testing SWG pipes of any dia with airtight cement joints including excavation of trenches and socket pits in any soil up to 1524 mm (5'0") depth (except rock requiring blasting) and refilling with watering and tamping.

270

482

130372.2

... More
SWD 5;Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (350mm)

270

2441

659229.3

... More
SWD 5;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including T&P and scafolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RR Masonry)

264.6

618

163731.83

... More
SWD 5;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of Prestressed / reinforced cement concrete grade M-20 & above including T&P and scafolding wherever necessary, sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORT Prestressed / reinforced cement concrete grade M-20 & above

176.4

2918

514902.78

... More
SWD 5;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial leadin layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., omplete for finished item of work. (APSS NO. 309 & 310).

1879.09

45

85761.67

... More
SWD 5;Carting of surplus excavated Soil/rock within a lead of 15Km from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

4544.1

291

1324605.15

... More
SWD 5;Providing barricading arrangement with casurina ballies as per the design duly excavating pits and its removal after the function is over including hire charges for the barricading materials as per the schedule given by the departmental authorities complete for finished item of work

906

98

89630.58

... More
SWD 5;Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. Above 900 mm dia . Uprooting of 1200mm dia/1800mm dia NP3 Pipe.

270

1758

474819.3

... More
SWD 5;Laying Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stiching charges and labour charges for finished item of work.

1630.8

40

65232

... More
SWD 5;Dewatering by pumping out water collected by natural drainage including cost of all materials machinary, labour, drinage, lighting, and all other operations etc, complete.

10872

83

911399.76

... More
SWD 5;Supply and Fixing of Perforated Ductile Iron Square (DI) frame with Covers of size (0.75x0.75m), Weight 135 kgs including transportation, loading and unloading charges including GST etc.

30

20550

616500

... More
SWD 5;Supplying, fitting and placing HYSD bar reinforcement Fe-500/500D/550D from steel manufactures within telangana with minimum integrated installed production capacity of 2 lakh MT per annum ( AF Star TMT, MS life TMT, Radha TMT, Sugna TMT) for box drain/ culvert foundation, walls and top slab and for foundation of retaining wall complete as per drawings and technical specifications sections 1600 & 2200 MORTH including over laps and wastage, where they are not welded. (for Box Drains Base slab/Walls/Top Slab)

163034.4

69

11392843.87

... More
SWD 5;Supply and placing of Reinforced Cement Concrete (RCC) M 30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH For Walls and Slab of Box drain. Note: 1. The quatities for cement , coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 Kg/Cum of concrete, the difference in cost shall be deducted.

944.83

7942

7503943.79

... More
SWD 5;Supply and placing of Reinforced Cement Concrete (RCC) M30 by Ready Mix Concrete (RMC) as per IS 4926-2003 and standard mix design as per IS:10262:2009 with minimum cement content as per IS code 456-2000 (cement content is taken as 407 Kgs) and with 20mm size graded (20mm-60% & 10mm-40%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 (50% Natural Sand and 50% manufactured sand) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundations as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for Foundation Raft of Box Drain. Note: 1. The quatities for cement , coarse aggregrates and fine aggregrates (50% natural sand and 50% manufactured sand) are for estimating purpose only. The exact quantities will be as per mix design. 2. For estimate purpose Cement Content is taken as 407 Kg/Cum. As per mix design, if the cement content is found to be less than 407 Kg/Cum of concrete, the difference in cost shall be deducted. For Base Slab

413.79

6994

2894055.54

... More
SWD 5;Supply and placing of Plain Cement Concrete (PCC) M15 by Ready Mix (RMC) Standard Mix Concrete grade as per IS 4926-2003 and with minimum cement content (Cement Content is taken as 275 Kgs) as per IS code 456-2000 and standard mix design as per IS:10262:2009 with 40mm size graded (40mm-60%, 20mm-30% & 10mm-10%) machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting and fine aggregate confirming to IS 383-1970 50% Natural Sand and 50% manufactured sand (as per mix design approved by the Engineer-in-charge from the Dept., from standard suppliers) including cost and conveyance of all materials, labour charges,water charges, pumping, including form work, laying concrete, vibrating, curing for 14 days, etc.,complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges for Foundation Bed as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. Note: 1. The rate of RMC is worked out with 100% Cement, 50% Natural Sand and 50% manufactured sand. 2.The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 3. For estimate purpose Cement Content is taken as 275Kg/Cum. As per mix design, if the cement content is found to be less than 275 kgs per cum of concrete, the difference in cost shall be deducted. 4.Manufactured sand (Rock Sand) not more than 50% of total sand content can be used.

227.28

5369

1220482.24

... More
SWD 5;Providing & constructing Stone dust filling below foundation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.

151.52

1656

251036.82

... More
SWD 5;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling in trenches with excavated suitable material, as per Technical Specification 305 MORD / 304 MORTH - Hard rock (blasting prohibited) by mechanical means - Upto 3 m depth - EWE in Rock

543.9

1699

924548.41

... More
SWD 5;Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and excluding backfilling - Mechanical means - depth upto 3m

4895.11

134

656972.71

... More
SWD 5;Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately, As Per MoRTH Specification No 202

519.87

1368

711634.45

... More
SWD 5;Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately by Mechanical Means

53.75

849

45640.2

... More
SWD 5;Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.