Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Agriculture or Forestry Works
Opening Date2 Aug 2024
Closing Date6 Aug 2024
Tender Amount₹ 7,60,300 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Avenue Plantation;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth (12) months

2940

505

178181.64

... More
Avenue Plantation;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 2940 x 10 ltrs x 43/25000= 50.56tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June = 5

50.56

3352

169492.29

... More
Avenue Plantation;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival

588

2261

13294.68

... More
Avenue Plantation;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

2940

293

8641.54

... More
Avenue Plantation;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

2940

-

5880

... More
Avenue Plantation;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

2940

57

1678.74

... More
Avenue Plantation;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)

2940

-

3000

... More
Avenue Plantation;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

2940

17

51038.4

... More
Avenue Plantation;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (8"x12" / 9" x 11" bag plants)

2940

2139

62892.48

... More
Avenue Plantation;Internal transporation of Bag plants to planting site

2940

370

10879.82

... More
Avenue Plantation;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (8"x12" / 9" x 11" bag size)

2940

542

15940.39

... More
Avenue Plantation;Application of FYM including internal distribution in red soil areas 45 cm pit Propotinate rate 21cft = 176.76 for 9cft = 75.75

2940

103

3055.31

... More
Avenue Plantation;Cost and conveyance of well-decomposed Farmyard manure to planting site 45 cm cube Propotinate qty @ 0.09cft/pit for 45 cm cube pit i.e. 21 cft = 2558.73 for 9cft = 1096.59

2940

1074

31595.3

... More
Avenue Plantation;Digging of pits 0.45 mt X 0.45 mt X 0.45 mt

2940

2845

83643.29

... More
Avenue Plantation;Alignment and staking including cost of stakes

2940

97

2854.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.