Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Civil Works Others
Opening Date28 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 54,54,852
Costs
EMD
₹ 54,549Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
578520Tender No
NIT No.24/04/SE/KPZ/GHMC/2024-25, Dt:25.02.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
DEVELOPMENT OF PARK;Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, complete for finished item of work, but excluding the cost of conveyance of all materials.
600
1008
604872
... More
DEVELOPMENT OF PARK;Flling with crusher stone dust finer than 3 mm with not more than 10% passing 0.075 sieve including supply and delivery of crusher stone dust finer than 3 mm for filling including cost of crusher stone dust seinognarage charges and convenance charges ,filling charges watering tamping and rammiing and all labour charges and operational charges complete as directed by the departmental officer.
95
1259
119680
... More
DEVELOPMENT OF PARK;Collection and supply and spreading of gravel including watering and rolling with Hand roller irresppective of thickness to achive the desired dencity as per Technical specification and excluding Seigniorage charges
900
506
455841
... More
DEVELOPMENT OF PARK;Supply of precast cc blocks (of 600*325*150/115mm) for kerbing made with rubberized moulds of M30 grade design mix with 350 kgs cement/cum of concrete.20mm ? 6mm nominal hard granite machine crushed metal at 0.80 cum/cum of concrete and sand at 0.4 cum/cum of concrete including cost and conveyance of all materials like sand water coarse aggregate etc complete. Including Fixing of Precast kerbing blocks of 600 mm length true to its alignment as specified by the Dept to form divider including pointing with cement mortar (1.3) prop Cost and conveyance of all materials like cement, sand, water etc to site, including curing and labour charges for mixing, etc complete.
900
241
216900
... More
DEVELOPMENT OF PARK;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
60
332
19975
... More
DEVELOPMENT OF PARK;Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD.
1318.54
197
260926
... More
DEVELOPMENT OF PARK;Filling with Sand (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) Sand fillling
36
1330
47890
... More
DEVELOPMENT OF PARK;Supply and fixing of MS Structural steel including cost and conveyance of all materials and erecting and fixing in position fabrication charges etc., complete as per specification.
6100
121
741577
... More
DEVELOPMENT OF PARK;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.( AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT)
3388
66
226691
... More
DEVELOPMENT OF PARK;Supply and placing of R.C.C grade M 30 (Design Mix) using 20 mm Graded Metal (MORD &MORTH 12.8 G) using cemet content 360 kg/cum as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm 54%, 10mm 18%, 6mm 18% as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Case 1 : Using Concrete Mixer Design Mix: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design drain top slab
1.63
10540
17182
... More
DEVELOPMENT OF PARK;Supply and placing of R.C.C grade M 30 (Design Mix) using 20 mm Graded Metal (MORD &MORTH 12.8 G) using cemet content 360 kg/cum as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm 54%, 10mm 18%, 6mm 18% as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Case 1 : Using Concrete Mixer Design Mix: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design drain walls
3.15
12399
39058
... More
DEVELOPMENT OF PARK;Supply and placing of R.C.C grade M 30 (Design Mix) using 20 mm Graded Metal (MORD &MORTH 12.8 G) using cemet content 360 kg/cum as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm 54%, 10mm 18%, 6mm 18% as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, dewatering , curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Case 1 : Using Concrete Mixer Design Mix: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design drain lower slab
1.81
7206
13044
... More
DEVELOPMENT OF PARK;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc.,Columns for Compound Wall
6.38
15585
99438
... More
DEVELOPMENT OF PARK;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., Compound wall Plinth Beam
18.63
14568
271410
... More
DEVELOPMENT OF PARK;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., Gate columns
1.01
15585
15742
... More
DEVELOPMENT OF PARK;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904) per 10 Sqm.
1318.54
6478
854165
... More
DEVELOPMENT OF PARK;Randum Rubble Stones in Cement Mortor 1:6 Prop using hard granite stone including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc.,including cost of Seigniorage Charges on all Materials, all taxes including Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing , Etc., complete for finished item of work. (As per SS 615). per 1 Cum
243
5408
1314180
... More
DEVELOPMENT OF PARK;Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (Brick/tile work in cement mortor)
49.95
736
36766
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements