Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Civil Works Roads
Opening Date22 Sep 2021
Closing Date28 Sep 2021
Tender Amount₹ 20,60,586 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of MLAP;Importation of good quality red earth congenial for plant growth of light textured, crystalline. Porous and friable, generally acidic or neutral bu tnot alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60 mt pits (0.30X0.30X0.30=0.027X6000=162X20% = 32.4

32.4

-

39803.4

... More
Development of MLAP;Application of Red soil and FYM including internal distribution 30cmt cube pit

6000

-

9240

... More
Development of MLAP;Cost and conveyance of well-decomposed Farmyard manure (0.60mt pits)

2000

-

51174.6

... More
Development of MLAP;Cost and conveyance of well-decomposed Farmyard manure (0.30mt )

6000

-

32743.8

... More
Development of MLAP;Internal transporation of Bag plants to planting site

1000

-

2783.2

... More
Development of MLAP;Internal transporation of Bag plants to planting site

1000

-

9396.8

... More
Development of MLAP;Internal transporation of Bag plants to planting site

6000

-

5710.8

... More
Development of MLAP;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unloading and unloading wherever departmental vehicles are not provided (8"X10")

1000

-

7590

... More
Development of MLAP;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unloading and unloading wherever departmental vehicles are not provided (15"X16")

1000

-

25760

... More
Development of MLAP;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unloading and unloading wherever departmental vehicles are not provided (5"X9")

6000

-

65781

... More
Development of MLAP;Planting of bag plants after refilling the pits/ support sticks 8"X10" bag size & 15"x16" Bag size

2000

-

42784

... More
Development of MLAP;Planting of bag plants after refilling the pits/ support sticks 5"X9" Bag size

6000

-

9240.6

... More
Development of MLAP;cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20cm at breast ht) and loop tying to plants & Painting with red color

2000

-

56000

... More
Development of MLAP;Cost of preparation of stakes (0.45m length) and transportation to site (5"X9")

6000

-

30000

... More
Development of MLAP;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)(8000X40%= 320)

320

-

19200

... More
Development of MLAP;Application of Chemicals and fertilizers/ Neem cake etc (2 doses)

8000

-

9136.8

... More
Development of MLAP;Replacement of casualities to a maximum of 10% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"X10"bag Plants)

200

-

4522

... More
Development of MLAP;Replacement of casualities to a maximum of 10% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (5"X9"bag Plants)

600

-

4734.72

... More
Development of MLAP;Maintenance of hedge/shurb planting : i) Trimming of hedges/ shrubs once in 15 days ii) Watering hadges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application of fertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.. ( For 12 .months) (Water to be engaged, Name of the watcher to be reported and payment to be made in the Bank A/c of the watcher)

1

-

167400

... More
Development of MLAP;Cost and supply of water 1) Shrubbery area watering (Alternate Day on non rainy days) Total 180 waterings A) Individual Shrubbery = 6000X180 watering X 5ltrs/sqmt/25000 = 216 B) Tall Plants = 2000 nos X 60 Waterings X 20 ltrs /25000 = 96 Total = 312

312

-

1045917.6

... More
Development of MLAP;Misc & Unforeseen items plantation Boards, watering house pipes electric

1

-

15000

... More
Development of MLAP;Add GST 12 %

1

-

223003.81

... More
Development of MLAP;Misellanious

-

-

31.07



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.