Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 23,513Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
570880Tender No
991/UB/2024-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
renovation of park;Ficus blakiana topiary 21 x 21 Bag size
20
800
16000
... More
renovation of park;Syzizium Companulata 21 x 21
25
2500
62500
... More
renovation of park;Cannas Varieties 8" x 8" bag size
300
45
13500
... More
renovation of park;Neerium 8" x 10" Bag Size and etc.,
300
45
13500
... More
renovation of park;Gulfimia 8" x 10" Bag Size
300
45
13500
... More
renovation of park;Tabernam 8" x 10" Bag Size
300
45
13500
... More
renovation of park;Hamelia Patters 8" x 10" Bag Size
300
45
13500
... More
renovation of park;Ixora 8" x 10" Bag Size
300
45
13500
... More
renovation of park;Engaging of Mandays for cleaning, debries removal, Cutting of Lower branches leveling of site complete etc.,
10
728
7280
... More
renovation of park;Cost of good quality korean / mexican/shade carpet grass turf of 2'X1' or 2'X2' size duly rolled and of atleast once moved, with grass blades not more than 1 cm. height, without pumps and tufts, uniform in colour and texture, devoid of weeds, to be delivered at twin cities (430 x 10.76 = 4626.8 or 4627 )
4627
10
48583.5
... More
renovation of park;Artistic Name board - modular
1
35000
35000
... More
renovation of park;Installation of modern seating Benches including material Cost, labour charges completed etc.,
8
18000
144000
... More
renovation of park;Maintenance of Individual shrubs: i) Trimming of shrubs once in 15 days ii) Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc. a) with manual watering (for 7 months)
70
612
3001.79
... More
renovation of park;Maintenance of hedge/ shrub planting 1) Trimming of hedges once in 15 days 2) Watering hedges/shrubs once in a day @ 5 Ltrs per plant/per day ( Sub soil moisture shall be maintained continuously) 3) Formation of basins 1 feet away from the hedge. 4) Application of fertilizers, insecticides, fungicide for one year one labour daily must be present at the site and carry the necessary operations. It is responsible of the contractor to get the work done by the labou for (7) months
405
2930
83087.9
... More
renovation of park;Maintenance of Lawns: Watering the lawns @ 10-15 ltr/Sqm/day basing on the season and weather conditions (Sub Soil moisture shall be maintained continuously) ii) Lawn moving and edging of the lawn in edging of the lawns in the following frequency, keeping the lawn grass blade not more than 2 cm 1) June to Nov - Once in 15 days. 2) Dec to May - Once in 30 days. 3) edging the lawns in such a way that the lawn grass do penetrate into the plants and in a defined perfect geometric shapes or smooth curves. 4) Keeping the lawns always in lush green & weed free condition. 5) Application of fertilizers, insecticides, fungicide etc., with manual watering for (7) months
430
924
27815.71
... More
renovation of park;Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture with red soil and farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of fertilizers (@ 20 gms/pit/sqmt) and plant material)
70
746
52262
... More
renovation of park;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
1800
56
100800
... More
renovation of park;Carpet grass laying and ramming
430
58
24983
... More
renovation of park;Bed preparation : Dressing the surface to the desired shape, laying 4" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (2.5" thickness after rolling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.
430
222
95567.5
... More
renovation of park;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 km. Complete (430*0.30= 129 cmt )
129
174
22549.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements