Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Civil Works Others
Opening Date7 Mar 2025
Closing Soon17 Mar 2025
Tender Amount₹ 21,19,617 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of parks;Artistic painting with Acrylic exterior or higher grade point including cost,conveyance of all material to the work site and all operational,incidental and labour charges hire charges for scaffolding with required materials as per the site condition,etc complete for finished item of work as per the design approved by the engineer incharge (below 6m height wall)

2485.56

110

273412

... More
Development of parks;Painting walls with ACE paint over priming coat, 2 coats including cost and conveyance of all materials tp work site and all operational, incidental, labour charges etc,. Complete for finished item of work

2843.18

275

782358

... More
Development of parks;Carting of excavated earth with a lead of about 14 KMts, including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed.

39.06

241

9420

... More
Development of parks;Supply and fixing of mild steel tubes and pipes of all diameters as per IS -1161, for all heavy steel works like trusses , stanchions, heavy beams and girders as approved by the dept officers including cost and conveyance of metarials, fabrication charges including cost of welding rods, power charges, labour charges for erecting in position and fixing by using chain pully blocks, derek pole arrangments and crain etc complete in position (SSR item)

2008

146

293168

... More
Development of parks;Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls

25.65

572

14684

... More
Development of parks;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site including all lab

2.43

7883

19158

... More
Development of parks;Raised Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site including , labour charges on all materials, curing etc., Complete for finished item of work. {50% natural river sand + 50% rock sand}

28.8

129

3742

... More
Development of parks;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum

7.2

4644

33439

... More
Development of parks;Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - PVC Coated - 2"x2" (50 mm x 50 mm) - 8 Gauge

276

727

200652

... More
Development of parks;supply and fixing of nuts and bolts including cost and conveyence of all materials and labour charges etc complete

159

9

1431

... More
Development of parks;Supply & fixing MS flat patty as per design approved by Engineer-In-Charge including al materials, welding & labour charges etc. complete for finished item of work.

159

10

1590

... More
Development of parks;Drilling holes to GI Pipies including al materials, welding & labour charges etc. complete for finished item of work.

159

10

1590

... More
Development of parks;S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour chargescomplete

106

547

57982

... More
Development of parks;Plain Cement Concrete M20 nominal mix with 20mm metal with concrete mixture, using 400kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing including hire charges of machinary but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum {50% natural river sand + 50% rock sand}

12.46

6538

81471

... More
Development of parks;Fixing of precast kerbing block true to its alignment as specified by dept including pointing with cm 1:3 prop , including cost and conveyence of all materials like cement,sand,water etc to site ,seigniorage charges on all materials ,curing,all taxes and labour charges etc Complete for finished item of work

200

41

8200

... More
Development of parks;Supply of precast Kerbing blocks made with rubberised moulds of M30 grade design mix with 350kgs using 20mm to 6mm nominal size hard granite machine crushed metal @.80 cum/cum of concrete and sand @ .40cum/cum of concrete for RCC works ncluding al materials like cement,coarse aggregate water,seigniorage charges all taxes and labour charges for mixing,laying concrete tamping vibrating,lifting ,curing,finishing top surface including hire charges of all tools and plants and transportation charges of precast blocks from casting site to worksite of each length 0.60m etc. complete for finished item of work.

200

200

40000

... More
Development of parks;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

3.15

293

923

... More
Development of parks;Engaging labour for removal of damaged interlocking tiles,kerbs etc complete works as directed by engineer in-charge.

15

805

12075

... More
Development of parks;Dismantling Stone masonry in cement mortar, TBSC-U.I-01, pg: 192/527, ssr 19-20

6.48

634

4108

... More
Development of parks;Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH

29.43

502

14783



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.