Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 24,778Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
577603Tender No
S O. No.987/UB/24-25Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Development of parks;Plumeria alba- 13"X13"
100
65
6500
... More
Development of parks;Michelia champaca - 18"X18"
4
230
920
... More
Development of parks;Nyctanthes arbor- tristis - 18"X18"
4
300
1200
... More
Development of parks;Rose- 13" X 13"
600
100
60000
... More
Development of parks;Jasmine - 13" X 13"
20
100
2000
... More
Development of parks;Pogada - 21"X21"
1
440
440
... More
Development of parks;Duranta - 8" X 10"
200
65
13000
... More
Development of parks;Ixora Dwarf - 13" X 13"
400
100
40000
... More
Development of parks;Areca Palm - 15X16
50
300
15000
... More
Development of parks;Cost of Plant Material : Sygegium -21" X 21"
10
1600
16000
... More
Development of parks;Add 18% GST (Excluding Protection)
1
1
116824.81
... More
Development of parks;Protection of park day & night (1 shift X 2months) night watch men should protect the park with security in Uniform (Including ESI @ 3.25 %, EPFO @ 13% per month)
1
17027
34054
... More
Development of parks;Maintenance of individual shrubs, rose plants, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers (Including cost of Fertilizers), insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 2 months
1230
612
15070.26
... More
Development of parks;Maintenance of hedge/ shrub planting: i) Trimming of hedges/ srubs once in 15 Days. Ii) Watering hedges/ srubs once in a day @ 5 liters / per sqmtrs/ per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii) Formation of basin 1ft way from the hedge. iv) Application of fertilizers (Including cost of Fertilizers), insecticides, Fungicides (@20gms/pit/sqmt)etc., for 2 months
70
2930
4103.11
... More
Development of parks;Maintenance of Lawn: i) Watering the lawns @ 10-15 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously), ii)Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm.June to November ? once in 15 days, December to May ? once in 30 days iii)Edging of the lawns in such a way that the lawn grass do not penetrate into the plants and in a defined perfect geometric shapes or smooth curves. iv) Keeping the lawns always in lush green & weedfree condition. v) Application of fertilizers (Including cost of Fertilizers), insecticides, Fungicides etc. With Manual watering (for 2 months)
238
924
4398.77
... More
Development of parks;Cost and supply of 3' dia cement rings
20
450
9000
... More
Development of parks;Seating Benches with Back Support
5
12700
63500
... More
Development of parks;Cost of chemical and fertilizers
50
50
2500
... More
Development of parks;Cost of dust Bins
1
15000
15000
... More
Development of parks;Erection and display of Name Boards
1
15000
15000
... More
Development of parks;Laying of Shabad Stone for path way
150
743
111480
... More
Development of parks;Carpet grass laying and ramming
238
58
13827.8
... More
Development of parks;Cost of carpet grass
238
10
2513.28
... More
Development of parks;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers(@20 gms/pit/sqmt) and plantmaterial.
70
756
52954.3
... More
Development of parks;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material
1000
129
129790
... More
Development of parks;Digging the pit of size 0.60x0.60x0.60 m, refilling the pit with red soil including cost red soil farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers(@ 20 gms/pit/sqmt) and pesticides etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
40
344
13794.8
... More
Development of parks;Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material at Rockery area.
190
194
36873.3
... More
Development of parks;Bed preparation: Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass.
238
333
79432.5
... More
Development of parks;Cost of Gravel including internal transportation , application and spreadding complete for making mound Details: Lawn Area & Path way area: - 300 x 0.3=90cmt
90
432
38928.6
... More
Development of parks;Supply and fixing of Pre Cast AAC Kerbs work size 600 mm X 375 mm X 110 mm Semibated at top in M30 grade including Cost and Convenyance to site and labor charges for laying true to alignment and painting with cement motor (1: 3 ) prop etc
180
227
40860
... More
Development of parks;Cleanning of jungle growth in the open space by engaging man days
30
728
21840
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%