Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532883Tender No
SO.No R/1571/UB/23-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Avenue Plantation;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 1500 x 20 ltrs x 43/25000=51.6 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June= 5
51.6
3352
172978.68
Avenue Plantation;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
300
2261
6783
Avenue Plantation;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
1500
293
4408.8
Avenue Plantation;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1
-
3000
Avenue Plantation;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
1500
57
856.5
Avenue Plantation;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
1
-
1500
Avenue Plantation;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
1500
28
42000
Avenue Plantation;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
1500
2139
32088
Avenue Plantation;Internal transporation of Bag plants to planting site
1500
608
9126.6
Avenue Plantation;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
1500
861
12928.35
Avenue Plantation;Application of FYM including internal distribution in red soil areas 60 cm pit
1500
247
3711.96
Avenue Plantation;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
1500
2558
38380.95
Avenue Plantation;Digging of pits 0.60 mt X 0.60 mt X 0.60 mt
1500
6761
101418.24
Avenue Plantation;Alignment and staking including cost of stakes
1500
97
1456.35
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements