Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
519491Bid Award Id
ViewTender No
7th Call 09/06/Development of Park/Div No 45/2023, Dt. 05.03.2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://nizamabadcorporation.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;V.C.C. grade grade M 20 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate ((50%sand + 50% Rock Sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,(MORTH 12.8 G)R.C.C (Column)
0.93
13386
12449.41
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;V.C.C. grade grade M 20 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate ((50%sand + 50% Rock Sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,(MORTH 12.8 G)R.C.C (Plinth Beam)
2.42
13417
32471.39
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
12.08
7873
95116.35
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)
549
279
153637.65
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-11-4- (161) : White washing one coat with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
549
32
17880.93
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
549
145
79692.84
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )
252.93
91
23158.27
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Supplying and fixing of MS Grill for Compound wall using 25mm MS Square Bars alround and 16mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick/ CRS masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer and One coat of Synthetic enamil paint of approved colour and make including cost and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work as per drawing and as directed by the Engineer-in-charge..
800
115
92600
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Carting of surplus earth including loading , unloading and conveyance upto 3kms including all labour charges RBR-FNDN-2
5.32
79
422.94
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
40.63
268
10921.75
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
445.5
233
103872.78
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
90
1311
118005.3
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Supply of precast cc blocks of 1.00m x 0.45 x 0.115/0.150m size for kerbing made with rubberized moulds of M-20 grade hard granite machine crushed metal including cost and conveyance of all material like of precast kerbing blocks of 600mm length true to its alignment over foundation with (1:4:8) proportion of 100 mm thick as specified by the department to form divider/ median including pointing with cement mortar ( 1:3 ) prop. Cost and conveyance of all materials like cement, sand and water etc,. To site including curing and labour charges for mixing etc, complete.
250
507
126887.5
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
25
4522
113050
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;RBR-CCPV-13 - i : Providing and Laying of Interlocking Concrete Block Pavements using precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification including c0st and c0nveyance of all materials and all labour chrges etc, complete.
250
550
137527.5
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-2-1 (9) : Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308).
3.33
268
895.14
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
51
1311
66869.67
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
1.67
4522
7551.74
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Supply of precast cc blocks of 1.00m x 0.45 x 0.115/0.150m size for kerbing made with rubberized moulds of M-20 grade hard granite machine crushed metal including cost and conveyance of all material like of precast kerbing blocks of 600mm length true to its alignment over foundation with (1:4:8) proportion of 100 mm thick as specified by the department to form divider/ median including pointing with cement mortar ( 1:3 ) prop. Cost and conveyance of all materials like cement, sand and water etc,. To site including curing and labour charges for mixing etc, complete.
37
507
18779.35
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Providing Children play equipment of standard make including cost and conveyance of all material and all labour charges, all operational and incidental charges etc complete.(Slide and Ladder 8 feet)
1
56000
56000
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Providing Children play equipment of standard make including cost and conveyance of all material and all labour charges, all operational and incidental charges etc complete. (Swing Two seater)
1
48000
48000
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Providing Children play equipment of standard make including cost and conveyance of all material and all labour charges, all operational and incidental charges etc complete. (Square Climber)
1
63500
63500
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Providing Children play equipment of standard make including cost and conveyance of all material and all labour charges, all operational and incidental charges etc complete. (Sea-Saw 4 seater)
1
36000
36000
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;Providing Children play equipment of standard make including cost and conveyance of all material and all labour charges, all operational and incidental charges etc complete. (Merry go round 6)
1
52000
52000
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;HMDA(FSR),-Carpet Grass making Lawn BT Dressing the surface to the desired shape laying 6" layer of fine red soil Covered with hand roller ncluding the cost of red earth sand and lobour charges including the cost of fertilizers,chemicals and costofgress laying and ramming reular watering
600
529
317514
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-13.2.2 : Fabrication and Supply of M.S. Poles for garden posts with 'B' class 6 mtrs long 60.25mm outer dia with base plate and suitable pole cap including cost and conveyance of all material including fixing of luminaire and labour charges etc., complete. 6Mtrs 'B' Class M.S. pipe of 60.25mm dia with base plate and suitable pole cap
5
3127
15637.95
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC13.3.1 : Supply and fixing of 50mm dia 0.5 mtrs single arm M.S. pipe bracket with sleeve and fasteners with necessary angle including painting etc., complete on existing pole including fixing of luminaire.
5
984
4920.1
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-13-4-6- Erection charges for 6 Mtrs. Long MS / GI Garden post including excavation of pit, concreting 1:3:6 and painting including cost and conveyance of all materials including fixing of luminaire and labour charges etc., complete.
5
1838
9194.05
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-13-5-2 ; Supply and fixing of 300mm x 180mm x 140mm No.16 gauge CRCA sheet box with hinged door and locking arrangements and din channel for fixing 2Nos MCBs duly powder coated with matching colour of poles including fixing with necessary arrangments etc., complete.
5
2200
11001.45
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-4-1-1 : Supply and erection of Panel mounting cubical type 30 / 32A TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel.
5
2017
10088.25
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;SoR-ELEC-2-13-1 : Supply of 6-32A DP MCB 10KA, C/D Curve ISI Mark. Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.
5
990
4953.6
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-CSTN-3-10- ( 27 ) Using Concrete mixture: Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (50% river sand 50% rock sand), coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
0.28
5236
1466.12
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;ELEC SoR -3.11.1.e: Supply and transportation of 20 W LED Street light Body made of high grade pressure die ? cast Aluminum alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, universal Voltage 100 - 270 V AC, P.F, = 0.90, high power LED's having efficacy =130 lumens/watt, and junction temperature < 75°C, with Ingress protection IP66, Driver surge protection 4KV, with optics distribution Type II medium, THD<10% at 110 Volts AC, driver efficiency =90%, CCT: 5600K, minimum CRI=80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting option provides flexibility of vertical or horizontal pole mounting option complete, with Top Openable Maintenance and Manufacture has to submit LM79,LM80 & Photobiological Safety Report. Luminaire Performance Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO certified company. LUMINAIRE MAKE :AVNI / GOLDWYN / MUELUX / KRIPA LIGHTS / FORTUNE ART / CAPART / GREENLITES / POLYCAB / INSTA POWER / GM / MILLION / C&S / RR Electric / Lb LED / Halonix / MIC / Promptec / Eveready / TRINIC / STANJO / PANASONIC. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
5
2158
10793.45
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-3-1-4 : Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.
25
23
590.75
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-3-1-2 : Supply and run of 1 of 22/0.3mm (1.5 Sqmm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.
25
33
831.5
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;ELEC-4.1.2.b : Supply of 6 Sqmm 2 Core XLPE insulated, 1100V grade armoured Alluminium cable as per specification confirming to IS:7098 (Part- I). Makes : RPG / V-Guard / Fortune Art / Suncab / Finecab / Gemscab / Payal / Orbit / RR Kabel.
100
202
20223
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;ELEC- 1.5.7.q : Supply of 10 Sqmm 4 core PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guard
30
670
20109.9
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-15-6-1 : Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.
30
201
6033.3
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-14-1-2 :Supply, Transportation, fabrication and erection of following guage CRCA sheet steel enclosure for power control cubicle panel / boxes etc., including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank process and painting with powder coating including cost and conveyance of all materials and labour charges.
1.08
2200
2376.31
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-4-1-3: Supply and erection of Panel mounting cubical type ( 100 to 250A ) TPN 415V, 50 Hz. switch disconnector fuse unit complete with front drive mechanism with door inter lock, padlocking arrangement etc., complete with fuse links on existing control panel.
1
6808
6808.8
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;BLD-ELEC-4-3-3: Supply and erection of Panel mounting 125A, 3 Pole, 25kA, MCCB with thermal magnetic setting / Microprocessor based release arrangement with all connections etc., complete on existing panel.
1
12212
12212.33
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;ELEC-3.5.1.b : Supply of Automatic Street Light Control System with Optical Sensor, Low volatage / High voltage trip and reset, operating voltage 150 - 280V AC, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs and contactor suitable to control the load of 3 KW of single phase load with necessary clamping arrangements. Makes : Swadeep Nature Switch / Light Mate / L&T / Siemens / Bajaj
1
14829
14829.03
Development of Park Beside Rana Towers with Compound Wall, Lawn, Children Play, Pathway in Div No 45;ELEC-7.15.5 ( SoR ) : Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)
1
5261
5261.51
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements