Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 52,632Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
559435Tender No
NIT.No.19/SE/SLPZ/GHMC/2024-25, Dated: 27 .11.2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying of Balance CC Road;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.
1052.52
66
70424
... More
Laying of Balance CC Road;c) for slab
2.1
7954
16704
... More
Laying of Balance CC Road;b) for walls
7.1
7770
55167
... More
Laying of Balance CC Road;a) for bottom
1.54
5447
8389
... More
Laying of Balance CC Road;Supply and placing of RCC M 20 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centring, vibrating, compacting, finishing etc., as required including, material , pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used. 2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design
-
-
-
... More
Laying of Balance CC Road;Plain Cement concrete 1:5:10 prop (Cement : fine aggregate: coarse aggregate ) for foundation and under flooring bed using 40mm size (SS 5) Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for Hand mixing , laying, concrete in foundation ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work and excluding cost of seigniorage charges
1.95
5443
10614
... More
Laying of Balance CC Road;Manufacture supply delivery and Lowering of 450 mm dia RCC S/S pipes carefully into the trenches laying them true to alignment and gradient ,jointing with rubber ring sand testing including filling with water with a water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985
24
2775
66619
... More
Laying of Balance CC Road;Groove Cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC pavement (CC Pavement 100mm to 200mm thick )
1017
60
61020
... More
Laying of Balance CC Road;Mechanical trowelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc, complete for finished item of work as directed by Engineer-in-Charge
2610
41
107010
... More
Laying of Balance CC Road;Supplyand placing of Impermeable plastic sheeting 125 micron thick over lean concrete mix as separation membrane.
2610
14
36540
... More
Laying of Balance CC Road;Supply of bituminous hot sealing compound (Grade 'A' ISI) /polysulphide and sealing the joints including cost and conveyance of all materials etc. for contraction joints at 4.5 m interval/ for longitudinal/ transverse joints as per MORTH specification No. 602 - 1 Rmt
9
43
393
... More
Laying of Balance CC Road;Supply of 25mm thick high performance premoulded expansion joint filler board (SILFLEX CAPCELL HD-100 or equivalent make), placing the same 25 mm below top of pavement slab,at 50 m interval in CC pavement including cost and conveyance of all materials for expansion joints conforming to MORTH specification No. 602 - 1 Rmt of joint length for 150 mm thick slab
9
168
1516
... More
Laying of Balance CC Road;Supply and placing of Ready Mix Concrete M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design..
391.5
5723
2240672
... More
Laying of Balance CC Road;Supply and placing of Ready Mix Concrete M 10 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 14 days, centering, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete. Note: 1.Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 shall be used.2. The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design..
134.85
4818
649722
... More
Laying of Balance CC Road;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
556.8
2357
1312723
... More
Laying of Balance CC Road;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH
1737.79
112
196249
... More
Laying of Balance CC Road;Dismantling of existing structures like concrete, grade M15 and above including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and initial lead (By Mechanical means in Cement concrete grade M-15 & M-20)
22.5
749
16855
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements