Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Irrigation Work
Agriculture or Forestry Works
Opening Date11 Feb 2025
Closing Date18 Feb 2025
Tender Amount₹ 59,61,200 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development and maintenance of;syngonium (7"X8")

1100

28

30800

... More
Development and maintenance of;Pisonia alba (8"X10")

1100

35

38500

... More
Development and maintenance of;Eranthimum Brown (7"X8")

1100

28

30800

... More
Development and maintenance of;Eranthimum Gold (7"X8")

1100

28

30800

... More
Development and maintenance of;costus (7"X8")

1100

28

30800

... More
Development and maintenance of;Acalypha holand red (7"X8")

1100

28

30800

... More
Development and maintenance of;Song of India (8"X10")

1100

65

71500

... More
Development and maintenance of;Eranthimum red (7"X8")

1100

28

30800

... More
Development and maintenance of;Pendanus (7"X8")

1100

28

30800

... More
Development and maintenance of;spider lilly (7"X8")

1100

28

30800

... More
Development and maintenance of;dracena coloroma (13"X13")

350

120

42000

... More
Development and maintenance of;alpinia varigated (13"X13")

350

260

91000

... More
Development and maintenance of;phyllodendron xanadu gold (13" x13")

350

230

80500

... More
Development and maintenance of;Heliconia (13"X13")

350

150

52500

... More
Development and maintenance of;Dracena mahathma (13"X13")

350

100

35000

... More
Development and maintenance of;Pisonia alba (13"X13")

350

100

35000

... More
Development and maintenance of;Vitchimeria gold ( 21"X21")

30

1820

54600

... More
Development and maintenance of;Radermachera ( 21"X21")

25

650

16250

... More
Development and maintenance of;filicium (21"X21")

20

650

13000

... More
Development and maintenance of;Cost of Plant Material: Ficus multihead topiary ( 21"X21")

5

4550

22750

... More
Development and maintenance of;Provision of workers for maintenance of shurbbery, individual plants, Sweeping, over all ambinence (For 12 Months, per month =17027/-)

2

17027

408648

... More
Development and maintenance of;GST 18%

1

-

714536.53

... More
Development and maintenance of;Sculptures

1

-

1250000

... More
Development and maintenance of;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

80

28

2240

... More
Development and maintenance of;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

2100

1528

32088

... More
Development and maintenance of;cost of chemical and fertilizers (for maintainance)

200

50

10000

... More
Development and maintenance of;cost of folidol dust

100

35

3500

... More
Development and maintenance of;Laying of pre fabricated AAC brick kerbing block size 0.60cmx0.30cmx0.10cm including cost and all material etc alinment 1;3 mortar

600

225

135300

... More
Development and maintenance of;Banglore stone benches with back support

16

10700

171200

... More
Development and maintenance of;Laying of paved pathway with shabad stones including cementing gaps with greencolour

800

743

594736

... More
Development and maintenance of;Maintenance of Individual: i) Trimming once in 15 days, ii) Watering once in a day @ 5liters / per plant/ per day ( sub soil moisture shall be maintained continuously) iii) Formation of basins for each and avery plant upto 1 ft. away from the plant. iv) Application of fertilizers, insecticides, Fungicides ( @20 gms/pit/sqmt) etc,,

2180

612

160258.78

... More
Development and maintenance of;Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.60x0.60x0.60 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

80

344

27589.6

... More
Development and maintenance of;Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

2100

194

407547

... More
Development and maintenance of;Maintenance of hedge/shrub planting i) Trimming of hedges/ shrubs once in 15 days ii) Watering hadges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application of fertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.

660

2930

232118.57

... More
Development and maintenance of;Hedge/Shrub Planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (20 gms / pit/sqmt) complete but excluding the cost of fertilizers (@20 gms/pit/sqmt) and plant material

660

756

499283.4

... More
Development and maintenance of;Cost of Gravel including internal transportation, application and spreading complete (90 mtrs Length X 19 mtr width X 0.60 depth = 1026 Cum)

1026

432

443786.04



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.