Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date17 Oct 2024
Closing Date25 Oct 2024
Tender Amount₹ 10,59,666 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Store room;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II) ELEC-8.16.7

1

5840

5840

... More
Construction of Store room;Supply of 2.5 Sq.mm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells /Polycab /Beljin (HFFR) /Ollvin(HFFR) /Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million(HFFR) / KEI (HFFR)/ V-Guard (HFFR)./ DEC (FRLS / HFFR) /Bonton (HFFR) and Avocab (HFFR) /Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) / Rajnigandha (HFFR) / Pawancab (HFFR) / South King(HFFR) ELEC-1.5.1

1

3900

3900

... More
Construction of Store room;Supply of 1.0 Sqmm FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable.Makes : Finolex / RR kabel / Havells / APAR EBXL / KEI / LK (L&T) / V-Guard. ELEC-10.2.8

1

1343

1343

... More
Construction of Store room;Supply of 16A flush type Switch Socket combined (2 in one). Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL. ELEC-1.7.1

2

112

224

... More
Construction of Store room;Supply of 6A 3/2 pin flush type Socket with shutter. Makes : GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry /Great white Omega / HPL / Vimal / CPL. ELEC-1.7.1

10

29

290

... More
Construction of Store room;Supply of ISI 25mm dia mediumgrade, with IS:9537 part 3 rigid PVC pipe.Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast /Gold / Polycab / DEC / Beljin / Champion/ Austro ELEC-1.2.2

90

32

2880

... More
Construction of Store room;Supplying and fixing of Unplasticized Poly VinylChloride (UPVC) casement windows openableshutters duly manufactured using UPVCreinforced profiles (Composition of profile shallconsists a minimum of 5.5 PHR of TiO2 and notmore than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm forouter frames, 74 mm x 60 mm x 2.40 mm formullion sections for two or more openableshutters 75 mm x 60 mm x 2.40 mm for openableshutter frame capable of mounting single glazingsystem structurally reinforced with hot dipgalvanized up to 50 microns of minimumthickness of 1.0/1.2 mm prefabricated & weldedthrough fusion welding. The window sash shall befitted with 5 mm thick clear float glass ofreputed make duly fixed with Grey colour TPVGasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC andaccessories for casement window ? friction hingesof stainless steel grade 304/430- 2 Nos., per sash,handle with mazak alloy casting 1 No. per sash,multipoint locking system suitably concealed 1No., per sash provided with raiser wedges forsmooth operation and the system is to beinstalled at the site using anchor fasteners,silicon rubber sealant, easy glazing/ deglazing atsite etc., including cost and conveyance of allmaterials, accessories, labour charges fortransportation, erection at site complete forfinished item of work..(TBSC-M.I-24)

5.76

7521

43321

... More
Construction of Store room;Supplying and fixing of Unplasticized Poly VinylChloride (UPVC) openable doors with openableshutters duly manufactured using UPVCreinforced profiles (Composition of profile shal consists a minimum of 5.5 PHR of TiO2 and notmore than 12 PHR of CaCo3 for every 100 parts ofPVC resin) of 60 mm x 55 mm x 2.40 mm forouter frames, 74 mm x 60 mm x 2.40 mm formullion sections as per the need and 102 mm x 60mm x 2.40 mm for openable shutter framecapable of mounting single glazing systemstructurally reinforced with hot dip galvanized upto 50 microns of minimum thickness of 1.2 mmprefabricated & welded through fusion weldingthe door sash shall be fitted with 6 mm thickclear float glass of reputed make duly fixed withGrey colour TPV Gaskets for sash & Glazing beadshall be co-extruded with Grey colour soft PVCSystem shall be provided with 4 no?s of 3D Hingesfor each shutter and multipoint locking with keyswith raiser wedges for smooth operation and thesystem is to be installed at the site using anchorfasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost andconveyance of all materials, accessories, labourcharges for transportation, erection at sitecomplete for finished item of work.(TBSC-L.III-12)

4.2

8544

35885

... More
Construction of Store room;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work GROUND FLOOR

132

184

24394

... More
Construction of Store room;Flooring with 40 mm thick Rough Cuddapah/Shabad stones of size (0.457m X 0.457m) set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost and conveyance of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work, GROUND FLOOR

32

713

22821

... More
Construction of Store room;Flooring with high strength Cement Concrete terrazzo/pre-polished/ chequered Step tiles of 25 mm thick (medium shade) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, Extension Area

46

1065

49004

... More
Construction of Store room;Supply and filling with Stone crusher Dust finer than 3mm with not more than 10% passing 0.075 sieve (exluding rock) in trenches sides of foundations and basement with intial lead inlayers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., coplete for finished tiem of work under Flooring (a-f)

4.8

1108

5322

... More
Construction of Store room;Plastering12mm thick in two coats with base coat of 8mm thick in C.M. (1:4) and topcoat of 4mm thick in C.M (1:2) with sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand} for CEILING.

32

553

17717

... More
Construction of Store room;Plastering 20mm thick in two coats with base coat of 16mm thick in C.M. (1:6) and topcoat of 4mm thick in C.M (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand,. Water, etc., to site, all operational, incidental charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surface of walls {50% natural river sand + 50% rock sand} GROUND FLOOR

234

571

133691

... More
Construction of Store room;Supply and fixing of MS gate/ Window grills, Iron doors/ Iron windows as approved by the dept officers including cost and conveyance of metarials, fabrication charges, cost of welding rods, power charges, labour charges for fixing of gate in position etc complete (SSR item)

200

107

21400

... More
Construction of Store room;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop having minimum Crushing strength 40 Kgs Per Sqm including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, Etc., to site including all labour charges like mixing Cement Mortor Scaffoding Charges lift charges , Curing charges Etc., Complete for finished item of work. , per 1 Cum.{50% natural river sand + 50% rock sand} GROUND FLOOR

40.99

7874

322768

... More
Construction of Store room;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

2001.25

59

119955

... More
Construction of Store room;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand}Lintels, Ground Floor , WINODWS

0.22

9326

2052

... More
Construction of Store room;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand} FOR SLABS

4

6923

27696

... More
Construction of Store room;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand} FOR ROOF BEAMS

3.24

6923

22434

... More
Construction of Store room;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand} FOR COLUMNS

1.94

9326

18093

... More
Construction of Store room;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand} FOR PLINTH BEAMS

1.65

8496

14018

... More
Construction of Store room;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and i including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc.,complete but excluding cost of steel and its fabrication charges, centering and shuttering charges for finished item of work. (cement: 400kg) {50% natural river sand + 50% rock sand} FOR FOOTINGS

5.18

8496

44009

... More
Construction of Store room;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum {50% natural river sand + 50% rock sand} Extension area

15.12

4628

69983

... More
Construction of Store room;Plain Cement Concrete (1:4:8) using 40mm metal with concrete mixture upto plinth level, using 162kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site,and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing including hire charges of machinary but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum, {50% natural river sand + 50% rock sand} Below Foundations

3.02

5048

15245

... More
Construction of Store room;Carting of excavated earth with a lead of about 14 KMts, from site including cost and conveyance of all materials and all labour charges, contractor profit and over head charges etc., complete for finished item of work as directed.., as directed by the GHMC officers.

36.29

241

8752

... More
Construction of Store room;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

36.29

293

10634



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.