Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Road Construction
Opening Date19 Dec 2024
Closing Date23 Dec 2024
Tender Amount₹ 39,42,152 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of CC Road;Supply and placing of the M-20 Design Mix Concrete by ready mix, mixed in a batching and mixing plant as per approved mix design, for sub base over a prepared subgrade, cement content not to be less than 300Kg/Cum with crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1, with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, concrete strength not to be less than 10 Mpa at 7 days, including cost and conveyance of all materials like cement, sand, coarse aggregate, water, centering etc., to site, all labour charges for mixing, transported to site by transit mixer,pumping and laying concrete, centering and vibrating, curing and finishing etc. complete, for finished item of work, as per Technical Specification 601 MORTH etc., complete for finished item of work- For CC Roads.

30.5

5824

177642

... More
Laying of CC Road;Saw cut joints for freshly laid concrete pavement including all materials and labour charges etc complete

3660

60

219600

... More
Laying of CC Road;Curing compound, including Spraying at 0.25ltr/Sqm ( item-15,P-20/SSR 2019-20)

2135

39

83798.75

... More
Laying of CC Road;Floating with power floater,mechanical trawelling,finishing with sound edges and camers including hire and operational charges of machinery, labour, fuel etc, complete for finished item of work as directed by Engineer-in-charge of the work ( As per Quatation).

2135

41

87535

... More
Laying of CC Road;Supply and placing of the M-30 Design Mix Concrete by ready mix, mixed in a batching and mixing plant as per approved mix design, for sub base over a prepared subgrade, cement content not to be less than 360Kg/Cum with crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1, with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, concrete strength not to be less than 10 Mpa at 7 days, including cost and conveyance of all materials like cement, sand, coarse aggregate, water, centering etc., to site, all labour charges for mixing, transported to site by transit mixer,pumping and laying concrete, centering and vibrating, curing and finishing etc. complete, including seigniorage charges and cost of steel and its fabrication charges for finished item of work, as per Technical Specification 601 MORTH etc., complete for finished item of work- For CC Roads.

308.25

6151

1896342

... More
Laying of CC Road;Supply and placing of the impermeable plastic sheeting 125 micron thick over lean concrete mix as seperation membrane including all charges etc., complete

2135

19

40565

... More
Laying of CC Road;Supply and placing of the M-10 Design Mix Concrete by ready mix, mixed in a batching and mixing plant as per approved mix design, for sub base over a prepared subgrade, cement content not to be less than 220Kg/Cum with crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes graded as per table 600-1, with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, concrete strength not to be less than 10 Mpa at 7 days, including cost and conveyance of all materials like cement, sand, coarse aggregate, water, centering etc., to site, all labour charges for mixing, transported to site by transit mixer,pumping and laying concrete, centering and vibrating, curing and finishing etc. complete, including seigniorage charges and cost of steel and its fabrication charges for finished item of work, as per Technical Specification 601 MORTH etc., complete for finished item of work- For CC Roads.

160.13

5387

862716

... More
Laying of CC Road;Excavation of roadway in soil using manual means for carrying of cut earth to embakment site with intial lift of 3 Mts and lead upto 50 m as per techhnical specificaiton clause 302.3 MORD for road work

163.13

313

51215

... More
Laying of CC Road;Dismantling of existing structures like concrete, grade M15 and above including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and initial lead (By Mechanical means in Cement concrete grade M-15 & M-20)

24

813

19512

... More
Laying of CC Road;Cutting open B.T. road surface including stacking of excavated materials including hire charges of all tools and plants and all labour charges for finished item of work as directed by the Engineer - in - Charge.

280.5

1127

316123.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.