Municipal Corporation Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GHMC Tender
Civil And Construction
Civil Works Others
Excavation
Opening Date28 Feb 2025
Closing Soon7 Mar 2025
Tender Amount₹ 80,79,257
Costs
EMD
₹ 80,793Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
578492Tender No
NIT No.24/02/SE/KPZ/GHMC/2024-25, Dt:25.02.2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Development of Balance work of Hindu Graveyard;Supply and placing of the Ready Mix Concrete M10 grade as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard Mix Design, as per IS-10262:1982 with coarse aggregate of nominal size 20 mm and fine aggregate of Zone-II as per the Mix Design approved by the Department from standard suppliers including cost and conveyance, vertical pumping up to 5 floors/ horizontal pumping up to 60.0 M for buildings/ pavements etc., works for including levelling, grading, seperation membrane 125 Micron thick spreading, centring, vibrating, compacting fininsing excluding curing, etc as required.
65
4899
318467
... More
Development of Balance work of Hindu Graveyard;Supply of precast cc blocks (of 600*325*150/115mm) for kerbing made with rubberized moulds of M30 grade design mix with 350 kgs cement/cum of concrete.20mm ? 6mm nominal hard granite machine crushed metal at 0.80 cum/cum of concrete and sand at 0.4 cum/cum of concrete including cost and conveyance of all materials like sand water coarse aggregate etc complete. Including Fixing of Precast kerbing blocks of 600 mm length true to its alignment as specified by the Dept to form divider including pointing with cement mortar (1.3) prop Cost and conveyance of all materials like cement, sand, water etc to site, including curing and labour charges for mixing, etc complete.
260
241
62660
... More
Development of Balance work of Hindu Graveyard;Filling with Crusher Stone dust finer than 3mm with not more than 10% passing 0.075 sieve, including supply and delivery of crusher stone dust finer than 3mm for filling, including cost of crusher stone dust, and conveyance to site, filling charges, watering, tamping and rammming and all labour charges and operational charges complete as directed by the Departmental officers.
130
1259
163773
... More
Development of Balance work of Hindu Graveyard;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
260
332
86557
... More
Development of Balance work of Hindu Graveyard;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
64
12257
78449
... More
Development of Balance work of Hindu Graveyard;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
1221
174
213126
... More
Development of Balance work of Hindu Graveyard;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site cost of seigniorage charges on all materials , all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (As per S.S. 904) per 10 Sqm.
1221
6478
790977
... More
Development of Balance work of Hindu Graveyard;Brick masonary in CM (1:6) with 2nd class bricks traditional size 23x11x7 cm including c/c of all material and water to work at site and all operational incidental, labour charges such as scaffolding, mixing mortar lift charges curing etc complete for finished item of work.
292.29
8762
2561083
... More
Development of Balance work of Hindu Graveyard;Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti-capillary grove.
144
842
121248
... More
Development of Balance work of Hindu Graveyard;Supply and fixing of Structural steel roof trusses using the tubular pipes including cost and conveyance of all materials and erecting and fixing in position fabrication charges etc., complete as per specification.including painting three coats etc complete as per design.
10500
148
1562820
... More
Development of Balance work of Hindu Graveyard;Flush Pointing to CRS/Brick Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site including cost of seignaiorage charges on all materials, all taxes, labour charges on all materials, curing etc., Complete for finished item of work.
36
1156
4165
... More
Development of Balance work of Hindu Graveyard;Damp proof course 50mm thick with 1:2:4 cement concrete Nominal mix, using 12mm hard broken stone aggregate including cost of all materials, conveyance charges of materials including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)
21.6
344
7433
... More
Development of Balance work of Hindu Graveyard;Randum Rubble Stones in Cement Mortor 1:6 Prop using hard granite stone including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, Etc.,including cost of Seigniorage Charges on all Materials, all taxes including Labour for cutting Stones to required size and shape mixing of Cement Mortor Construction, Scaffolding charges Curing , Etc., complete for finished item of work. (As per SS 615). per 1 Cum
33.48
5408
181065
... More
Development of Balance work of Hindu Graveyard;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.( AF star TMT/MS Life TMT, Radha TMT, SUGNA TMT)
576
66
38540
... More
Development of Balance work of Hindu Graveyard;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., COLOUMN
0.81
15585
12625
... More
Development of Balance work of Hindu Graveyard;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., PEDESTAL
0.9
11905
10715
... More
Development of Balance work of Hindu Graveyard;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.Unsupported Height up to 3.66 M Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc., FOOTING
4.05
11052
44761
... More
Development of Balance work of Hindu Graveyard;Plain Cement concrete (1:4:8) using 40 mm metal with hand mixing upto Plinth level including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site ,labour charges , for mixing , laying, concrete in foundation ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work
6.62
5571
36905
... More
Development of Balance work of Hindu Graveyard;Earth work excavation Ordinary rock (not requiring blasting)-Manual Means-Upto 3 m depth including labour and all charges etc. as per specification.
75
475
35669
... More
Development of Balance work of Hindu Graveyard;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
61.99
332
20638
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%