Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Opening Date12 Feb 2025
Closing Date19 Feb 2025
Tender Amount₹ 60,42,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development and maintenance of greenery;Eranthemum red (7"X8")

4960

28

138880

... More
Development and maintenance of greenery;Ixora dwarf (7"X8")

4960

28

138880

... More
Development and maintenance of greenery;Pendans (7"X8")

4960

28

138880

... More
Development and maintenance of greenery;Bird of Paradise (13"X13")

1600

350

560000

... More
Development and maintenance of greenery;Spathiphylum (8"X10")

1600

100

160000

... More
Development and maintenance of greenery;Fish tail fern (13"X13")

1920

180

345600

... More
Development and maintenance of greenery;Kentia Palm (13"X13")

8

250

2000

... More
Development and maintenance of greenery;Calathea luthea (13"X13")

8

280

2240

... More
Development and maintenance of greenery;Filicium ( 21"X21")

8

845

6760

... More
Development and maintenance of greenery;Ficus reginald ( 21"X21")

8

650

5200

... More
Development and maintenance of greenery;Cost of Plant Material: Ficus Multiheaded Topiary ( 21"X21")

16

4550

72800

... More
Development and maintenance of greenery;GST 18%

1

-

643643.73

... More
Development and maintenance of greenery;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

5168

28

144704

... More
Development and maintenance of greenery;cost of chemical and fertilizers (for maintainance)

300

50

15000

... More
Development and maintenance of greenery;cost of folidol dust

150

35

5250

... More
Development and maintenance of greenery;Maintenance of Individual: i) Trimming once in 15 days, ii) Watering once in a day @ 5liters / per plant/ per day ( sub soil moisture shall be maintained continuously) iii) Formation of basins for each and avery plant upto 1 ft. away from the plant. iv) Application of fertilizers, insecticides, Fungicides ( @20 gms/pit/sqmt) etc,,

5168

612

379916.22

... More
Development and maintenance of greenery;Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.60x0.60x0.60 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

48

344

16553.76

... More
Development and maintenance of greenery;Planting of individual shrub/rose/ornamental Bamboo: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

5120

194

993638.4

... More
Development and maintenance of greenery;Maintenance of hedge/shrub planting i) Trimming of hedges/ shrubs once in 15 days ii) Watering hadges/ shrubs once in a day @ 5 litres/per sqmts / per day / ( sub soil moisture shall be maintained continuously). iii) Formation of basins 1 ft away from the hedge . iv) Application of fertilizers, insecticides, Fungicides @20 gms/pit/sqmt) etc.

1152

2930

405152.41

... More
Development and maintenance of greenery;Hedge/Shrub Planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (20 gms / pit/sqmt) complete but excluding the cost of fertilizers (@20 gms/pit/sqmt) and plant material

1152

756

871476.48

... More
Development and maintenance of greenery;Cost of Gravel including internal transportation, application and spreading complete (28 mtrs Length X 4.8 mtr width X 0.80 depth X 16 Spancs= 1720.32 Cum)

1720.32

432

744107.21



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.