Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 19,715Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
565862Tender No
20/EE5/SRNR/GHMC/38/2024-25, Dt.03-01-2025Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
laying of 450 mm dia RCC Pipeline;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
54.06
2050
110858
... More
laying of 450 mm dia RCC Pipeline;Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 MORD
148.67
293
43562
... More
laying of 450 mm dia RCC Pipeline;Filling with Earth filling (ordinary soil) useful excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
350.4
54
19156
... More
laying of 450 mm dia RCC Pipeline;Plain Cement Concrete (1:2:4) prop using 20mm metal with concrete mixer upto Plinth level including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water etc., to Site Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete for foundation tamping, vibrating, lifting, curing, finishing top surface for benching, Kerbing, lintel & table drain, But Excluding centering shuttering charges cost of steel and fabrication charges etc., Complete for finished item of Work.(As per SS 402). per 1 Cum.
13.25
6045
80086
... More
laying of 450 mm dia RCC Pipeline;Plain Cement Concrete (1:4:8) prop using 40mm metal with hand mixing upto Plinth level including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water etc., to Site Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete for foundation tamping, vibrating, lifting, curing, finishing top surface for benching, Kerbing, lintel & table drain, But Excluding centering shuttering charges cost of steel and fabrication charges etc., Complete for finished item of Work.(As per SS 402). per 1 Cum.
16.7
4936
82422
... More
laying of 450 mm dia RCC Pipeline;Flush pointing with CM (1:3) to RR/CRS/Brick Masonary, including cost and conveyance of all materials to site, cost of seigniorage charges on all materials, all taxes, labour charges on all materials, curing etc. complete for finished item of work.
205.45
1159
23828
... More
laying of 450 mm dia RCC Pipeline;Construction of RR Masonary in C.M (1:6) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc. including cost of seigniorage charges on all materials, all taxes including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work.
115.85
4724
547308
... More
laying of 450 mm dia RCC Pipeline;Supply & fixing of RCC perforate covers and frames of size 0.90 x 0.90 x 0.125 including cost and conveyance of all materials labour charges etc, complete( HD-35)
13
3225
41925
... More
laying of 450 mm dia RCC Pipeline;Lowering the 450mm dia RCC NP3 class Socket and Spigot pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead upto 500 meters excluding cost of rubber rings as per BIS No. 783/1985
159
280
44612
... More
laying of 450 mm dia RCC Pipeline;Manufacture,supply and delivery of Rubber rings to suit450mm dia RCC NP3 class Socket and Spigot pipes confirming to B.I.S. 5382/ 1985 (RATE PER EACH RUBBER RING) including Transportation charges etc.complete.( Each)
80
265
21200
... More
laying of 450 mm dia RCC Pipeline;Manufacture,Supply and delivery of 450mm dia RCC NP3 class Socket and Spigot pipes conforming to BIS 458/2003 at Ex-Factory (Rate per meter of effective length)including Transportation etc.complete.(10 km lead)
159
2319
368810
... More
laying of 450 mm dia RCC Pipeline;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, dewatering charges, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH
477.6
99
47488
... More
laying of 450 mm dia RCC Pipeline;Dismantling of CC road suraface including all conveyance charges
38.16
1589
60655
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements