Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 8,775Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
571310Tender No
NIT No.26/DB/EE/Alwal Circle/GHMC/2024-25 Dt.21.01.2025 ( Item No.01)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
others;Supply and Fixing tube tunnel including material charges labor charges,transportation charges etc., Cost and conveyance of all charges etc.
1
65620
65620
... More
others;Supply and Fixing 2 seater swing including material charges labor charges,transportation charges etc., Cost and conveyance of all charges etc
1
50300
50300
... More
others;Supply and Fixing merry goaround including material charges labor charges,transportation charges etc., Cost and conveyance of all charges etc.,
1
9000
9000
... More
others;Plain Cement Concrete M20 nominal mix with 20mm metal with concrete mixture, using 400kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing including hire charges of machinary but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum
2.43
6395
15540
... More
others;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level.
0.75
4774
3581
... More
others;Engaging of tipper 5.5cum Per hour on hire basis including driver batta, diesel, lubricants etc and all operational and incidental charges etc complete. ( Data 2022-23, Machinery s.no 15)
9
1280
11524
... More
others;Engaging of JCB on hire basis including all charges etc complete
12
850
10200
... More
others;Supply and fixing of MS gate/ Window grills, Iron doors/ Iron windows as approved by the dept officers including cost and conveyance of metarials, fabrication charges, cost of welding rods, power charges, labour charges for fixing of gate in position etc complete
800
106
84800
... More
others;Supply and delivery of GI nut , bolt and washers including cost and conveyance of all materials labour charges etc., complete pg.no.23/17-18
20
108
2160
... More
others;Drilling of 12mm dia holes to GI pipes and MS angular including cost and conveyance of all materials labour charges etc., complete ELEC-9.4.20
75
-
33
... More
others;Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2"(50 mm x 50 mm) - 8Gauge TBSC-E.II-06
225
408
91800
... More
others;S& F 50 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings &labour chargescomplete TBSP-G.I-12
300
547
164100
... More
others;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work
159.3
186
29732
... More
others;White washing one coat with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
159.3
27
4408
... More
others;Damp proof course 40mm thick with cement concrete (1:2:4 Nominal mix), using 12mm hard broken stone aggregate including cost of all materials, seigniorage charges, excluding conveyance charges of materials, including the cost of machinery, labour charges, mixing, placing in position, leveling, vibrating, curing etc. complete for finished item of work. (Using concrete mixer)
3.74
244
916
... More
others;Flush Pointing to RR Masonary in Cement Mortor 1:3 Prop . including cost & conveyance of all materials like cement, sand to site including cost of seignaiorage charges on all materials, all taxes, labour charges on all materials, curing etc., Complete for finished item of work.
109.44
115
12693
... More
others;Randum Rubble Masonry in Cement Mortor 1:6 Prop using hard granite (CR stone), Rough stone, Bond stones including Cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones,Rough stone, bond stone etc.,including Cost of Seigniorage Charges on all Materials, all taxes including Labour charges for cutting Stones to required size and shape at mixing of Cement Mortor Construction, Scaffolding, lift and curing Charges etc., Complete for Finished item of Work .Per 1 Cum
31.37
5223
163892
... More
others;Plain Cement Concrete (1:4:8) using 40mm metal with hand mixing up to plinth level using 162kgs of cement including Cost and Conveyance of all materials like Cement Sand Coarse Aggregate Water Etc., to Site, Cost of Seigniorage Charges on all materials, all taxes and Labour Charges for mixing , laying Concrete tamping, lifting, curing, finishing but excluding Centering Shuttering Charges and cost of steel and fabrication charges Etc., Complete for finished item of Work.1 Cum.
13.5
4936
66638
... More
others;Supply and filling with Stone crusher Dust finer than 3mm with not more than 10% passing 0.075 sieve (exluding rock) in trenches sides of foundations and basement with intial lead inlayers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., coplete for finished tiem of work
10.62
1108
11781
... More
others;Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth
44.75
293
13113
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements