Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Corporation - GWMC Tender
Civil And Construction
Building Construction
Opening Date7 Jan 2025
Closing Soon16 Jan 2025
Tender Amount₹ 19,18,797
Costs
EMD
₹ 19,188Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
566409Tender No
21EE-III/GWMC/CTN-20/eProcurement/2024, Dt:30-12-2024Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://gwmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .
31
4698
145667.76
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS.
6.48
9345
60557.28
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. (PEDASTAL)
2.16
9689
20929.36
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Plinth beam
3.76
11758
44217.65
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. (Columns)
3.22
12993
41838.52
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. (Roof Beam L & For staircase)
9.27
12741
118158.65
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS (Slab 125mm thick)
123.26
1693
208760.53
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-3-14-(31) - A : S: Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (Footings ) (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS (Bottom/Top, Walls sides)
2.51
5133
12906.67
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
2724.49
91
249453.94
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
46.44
7383
342888.81
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site
623.54
304
189924.05
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-12-1-(168) : Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
623.54
135
84396.14
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Supply and Fixing in position of MS steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows etc, including cost and conveyance of all material , labour charges for fabrication and fixing in postion etc,. Complete
759
160
121849.86
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
63
575
36253.98
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSC-L.I-18 Supplying and fixing of 30mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fiber), and the remaining 15% additives, the door shutter shall be water resistant, fire resistant and termite resistant, with Tensile Strength not less than 170 Kgf/cm2 and the door shutters surface finished deco paint etc., complete excluding cost of hinges, latches, aldrops etc.,
7.28
2200
16021.24
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSC-L.I-17 Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast
20
798
15974.27
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Supply, delivery, fabrication and fixing of UPVC windows
3.96
8623
34148.58
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Flooring Supply of ordinary soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-9 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designswith vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including, etc., complete for finished item of work
54.95
1086
59685.59
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (Elbows)
30
51
1554
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (TEE)
26
64
1674.4
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (Couplings)
30
33
1008
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (Nippels)
12
110
1327.2
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (Ball Valves)
2
881
1763.66
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (110mm dia)
15
257
3865.05
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Sanitary items (Taps)
8
102
816
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 25 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm (swr pipe 110 mm dia)
15
819
12285
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 25 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm (SWR Elbow 110mm dia)
4
250
1000
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 25 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm (SWR plain Elbow 110mm dia)
10
180
1800
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 25 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm (SWR plain coupling)
5
170
850
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 25 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm (Reducer 4" x 2 1/2")
5
185
925
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (swr pipe 75mm dia)
15
252
3780
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (Elbows 75mm dia)
10
175
1750
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (Tee 2 1/2" size)
10
85
850
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (Door Elbow 2 1/2")
10
75
750
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (Air pipe)
4
250
1000
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (WASTAGE PIPES)
10
550
5500
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (PILLER COCKs for hand wash basin)
2
450
900
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (NAUNHY TRAP WITH JOLLY)
10
450
4500
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;TBSP-H.I 23 75 mm dia 3 M Single Socket PVC/SWR pipe -6 Kg/sq.cm (ANGLE COCKS)
4
325
1300
... More
Construction of Community Hall at Indira Nagar SC Colony Shayampet in Div.No.32;Construction904mm of Inspection Chamber Chamber 3'x1'6" Dia Brick Masonary IS 4111 With Cement Motar (1;6) prop Using Second Class Brick and Cost of all Material and Labour Charges etc Completed
4
6091
24364
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%