Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Building Construction
Opening Date22 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 8,07,700 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of park;Regular watering and removal of weeds, protection etc for 45 days for initial establishment

200

9

1978

... More
Development of park;II ) Peripheral Plantation : Digging of 0.60 mt x 0.60 mt x 0.60 mt pits

50

6761

3380.61

... More
Development of park;Application of red soil and FYM including internal distribution 60cm cube pits

50

831

415.67

... More
Development of park;Cost and conveyance of well-decomposed Farmyard manure to plantingsite

50

2558

1279.37

... More
Development of park;Planting of bag plants after refilling the pits/support sticks (same as2.15.11)

50

2139

1069.6

... More
Development of park;Cost, transport and fixing of support sticks for tall plants

50

28

1400

... More
Development of park;1st Circular weeding 10 cms deep using crowbars to a radius of 50 cms around the plant

50

160

80.47

... More
Development of park;1st Soil working 10 cms deep using crowbars to a radius of 50 cms around the plant

50

482

241.41

... More
Development of park;2nd Circular weeding without application of fertilizers to a radius of 50 cms around theplant

50

160

80.47

... More
Development of park;2nd Soil working 10 cms deep using crowbars to a radius of 50 cms around theplant

50

482

241.41

... More
Development of park;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete

10.5

1228

12899.25

... More
Development of park;Transport of plants from nursery site to planting site up to alead of 3kms includind and unloading where ever departmental vehicles are not provided (12x16 bags)

50

1399

699.5

... More
Development of park;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

150

194

29110.5

... More
Development of park;Hedge / shrub planting:Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers(@ 20 gms/pit/sqmt) and plantmaterial.

75

756

56736.75

... More
Development of park;Add 18% GST

1

-

37924.44

... More
Development of park;III) MAINTENANCE : - Maintenance of Lawn, Mannaual watering (1) Watering the lawns@10 liters / Sqm. / day basing on the season and weather conditions (sub soil moisture shall be maintained contionously). The watering shall be carried out DAILY during non rainy days. (2) Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (i) June to November - once in 15 days (ii) December to May - once in 30 days. (3) Edging of the lawns in such a way that the lawn grass do not penetrate innto the plants and in a defined perfect geaometric shapes or smootha curves. (4) Keeping the lawns in lush green & weed - free condition. (5) Application of fertilizers, insecticides, Fungicides etc. (a) With manual watering. (b) With Drip / Sprinklers system. (12) Months =200X 924.112/100 X 12 = 22178.69

200

924

22178.69

... More
Development of park;Maintenance of hedge / shrub planting:i)Trimming of hedges / shrubs once in 15 days. ii) Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). iii). Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., for (12) months =75 X 4103.11/100 X12months =36927.99

75

2930

26377.11

... More
Development of park;Maintenance of individual shrubs, rose plants, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 12 months =200X 612.61/100X12= 14702

200

612

14702.69

... More
Development of park;Errection of Display of Name Boards with Iron angulars

1

15000

15000

... More
Development of park;Cost of Folidol dust (10%) @20grms/pit

25

35

875

... More
Development of park;Cost of chemicals and fertilizers @ 20gms/pit/dose (2 doses)

50

50

2500

... More
Development of park;Tools and implements ( Hose Pipes and other implements )

1

20000

20000

... More
Development of park;Banglore stone benches with back support

8

10700

85600

... More
Development of park;Laying of pre fabricatedAACbrick kerbing block size 0.60cmx0.30cmx0.10cm including cost and all material etc alinment 1;3 mortar

250

225

56375

... More
Development of park;Laying of paved pathway with Shabad Stones

35

743

26019.7

... More
Development of park;Add 18% GST

1

-

48533

... More
Development of park;Sweeping & maintenance 1 person x 12 months ( Including ESI @ 3.25% , EPFO @ 13% per month )

180

728

131040

... More
Development of park;Cost of Carpet grass ( 150x 10.76= 1614 sqmt)

1614

10

17043.84

... More
Development of park;Pisonia alba 8X10

300

65

19500

... More
Development of park;Acalypha red 8x10

400

40

16000

... More
Development of park;Duranta erecta 8X10

300

50

15000

... More
Development of park;Eranthimum 7x8

500

25

12500

... More
Development of park;tecoma gadichaudi 8x8

20

28

560

... More
Development of park;Pedilanthus verigated 7x8

50

25

1250

... More
Development of park;Veitchia Merrilli green 21x21

5

700

3500

... More
Development of park;Areca palm 15x16

50

120

6000

... More
Development of park;Draccaena mahatma 7x8

100

30

3000

... More
Development of park;Draccaena victoria 13x13

25

150

3750

... More
Development of park;Ixora singaporensis 13x13

25

100

2500

... More
Development of park;Allamanda bush 8x12

25

70

1750

... More
Development of park;Golden pandanus 7x8

50

35

1750

... More
Development of park;Song of india 8x10

10

45

450

... More
Development of park;Bamboo budda belli 13x13

25

150

3750

... More
Development of park;costus 7x8

30

50

1500

... More
Development of park;Misc

1

-

79



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.