Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Opening Date22 Jun 2021
Closing Date25 Jun 2021
Tender Amount₹ 7,21,700 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Raising of Avenue Plantation;Application of FYM including internal distribution in red soil areas 60 cm pit

1000

-

2474.6

... More
Raising of Avenue Plantation;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16 " / 15"x16" bag plants)

1000

-

7349.3

... More
Raising of Avenue Plantation;Over and above 3 Km lead add following rates per km per 100 Plants = Average 5 Km extra

1000

-

529

... More
Raising of Avenue Plantation;Internal transporation of Bag plants to planting site

1000

-

6084.4

... More
Raising of Avenue Plantation;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 15"x16" bag plants)

1000

-

21392

... More
Raising of Avenue Plantation;cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

1000

-

28000

... More
Raising of Avenue Plantation;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit

20

-

700

... More
Raising of Avenue Plantation;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

1000

-

571

... More
Raising of Avenue Plantation;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

40

-

2000

... More
Raising of Avenue Plantation;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

1000

-

2939.2

... More
Raising of Avenue Plantation;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 15"x16" bag plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities durin gthe year, the Contractor agency has to be planted to the extent of dead at his own cost and must show 100% survival

200

-

4522

... More
Raising of Avenue Plantation;1st Circular weeding without application of fertilizers to a radius of 50 cms around the plant in August/Sept

1000

-

1609.4

... More
Raising of Avenue Plantation;1st Soil working 10 cms deep using crowbars to a radius of 50 cms around the plant in August /Sept

1000

-

4828.1

... More
Raising of Avenue Plantation;Cost and supply of water @ 20 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity (5 tankers - 25000 Ltrs) March to june ( 3 days once)- 40 waterings July to Nov( weekly once) - 20 waterings Dec to Feb(5 days once) -14 waterings Total - 74 waterings (Watering schedule/Log book should be maintained mandatorily)

59.2

-

198456.16

... More
Raising of Avenue Plantation;GST

1

-

45041.78

... More
Raising of Avenue Plantation;Protection, maintenance, tending the plants upkeep the fencing & removal of unwanted growth for a period of 12 months (Watcher to be engaged, Name of the watcher to be reported and payment to be made in the Bank A/c of the Watcher)

1000

-

121275.6

... More
Raising of Avenue Plantation;Cost of Plant Material (15" X 16")

1200

-

180000

... More
Raising of Avenue Plantation;Misc

-

-

34.46



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.