Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
231399Tender No
Tender Notice No.08/SE/HL&WBMC/2020-2021, Dt: 24.03.2021Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Carting of excavated all soils, HDR, Rock spoil to a of 20 kms and depositing the same on out of working area as directed by the Department but excluding loading, unloading & stocking. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
9680.72
-
2958428
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Bailing out water using 5 HP Dewatering pump (diesel) complete Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
2160
-
700596
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Bailing out water using 5 HP Dewatering pump (diesel) complete Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
1920
-
622752
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Bailing out water using 5 HP Dewatering pump (diesel) complete Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
1600
-
518960
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Bailing out water using 5 HP Dewatering pump (diesel) complete REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
1200
-
389220
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing fencing using Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) of 2.4m high as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge with 50 mm Nominal Bore GI pipe of 8 No's of 3.0 m length in 10m stretch with medium grade properties & weight as per IS 1239 ISI mark with GI fittings and MS flats of 25mm x 3mm size 4 No's for each pipe of 100mm length @ 0.59 Kg/m including the cost of pipe & its fittings & labour charges for all conmponents, drilling holes to GI pipes & MS flats, fixing jali with costs of nuts and bolts, for straightening, erection and fixing of chain link mesh with MS flat and GI bolts & nuts 10mm dia, etc., complete for finished item of work. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
710
-
1927437
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing fencing using Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) of 2.4m high as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge with 50 mm Nominal Bore GI pipe of 8 No's of 3.0 m length in 10m stretch with medium grade properties & weight as per IS 1239 ISI mark with GI fittings and MS flats of 25mm x 3mm size 4 No's for each pipe of 100mm length @ 0.59 Kg/m including the cost of pipe & its fittings & labour charges for all conmponents, drilling holes to GI pipes & MS flats, fixing jali with costs of nuts and bolts, for straightening, erection and fixing of chain link mesh with MS flat and GI bolts & nuts 10mm dia, etc., complete for finished item of work. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
1500
-
4072050
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing fencing using Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) of 2.4m high as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge with 50 mm Nominal Bore GI pipe of 8 No's of 3.0 m length in 10m stretch with medium grade properties & weight as per IS 1239 ISI mark with GI fittings and MS flats of 25mm x 3mm size 4 No's for each pipe of 100mm length @ 0.59 Kg/m including the cost of pipe & its fittings & labour charges for all conmponents, drilling holes to GI pipes & MS flats, fixing jali with costs of nuts and bolts, for straightening, erection and fixing of chain link mesh with MS flat and GI bolts & nuts 10mm dia, etc., complete for finished item of work. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
1308
-
3550828
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing fencing using Hot dipped Galvanised Iron Chain link mesh 8 gauge - (4.0 mm) of 2.4m high as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge with 50 mm Nominal Bore GI pipe of 8 No's of 3.0 m length in 10m stretch with medium grade properties & weight as per IS 1239 ISI mark with GI fittings and MS flats of 25mm x 3mm size 4 No's for each pipe of 100mm length @ 0.59 Kg/m including the cost of pipe & its fittings & labour charges for all conmponents, drilling holes to GI pipes & MS flats, fixing jali with costs of nuts and bolts, for straightening, erection and fixing of chain link mesh with MS flat and GI bolts & nuts 10mm dia, etc., complete for finished item of work. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
586
-
1590814
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Supply and fixing high performance expansion joint filler board conforming to IS: 1838 - 25mm THICK including cost and conveyance of all materials labour charges, fixing in position with all incidental charges etc.,complete for finished item of work. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
105.73
-
122768
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Supply and fixing high performance expansion joint filler board conforming to IS: 1838 - 25mm THICK including cost and conveyance of all materials labour charges, fixing in position with all incidental charges etc.,complete for finished item of work. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
218.63
-
253862
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Supply and fixing high performance expansion joint filler board conforming to IS: 1838 - 25mm THICK including cost and conveyance of all materials labour charges, fixing in position with all incidental charges etc.,complete for finished item of work. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
183.04
-
212537
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Supply and fixing high performance expansion joint filler board conforming to IS: 1838 - 25mm THICK including cost and conveyance of all materials labour charges, fixing in position with all incidental charges etc.,complete for finished item of work. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
81.5
-
94634
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 100mm dia perforated PVC pipes 40cm long for weep holes including cost of all materials, labour,drilling 8mm dia holes etc., complete with all leads and lifts Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
397.32
-
90351
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 100mm dia perforated PVC pipes 40cm long for weep holes including cost of all materials, labour,drilling 8mm dia holes etc., complete with all leads and lifts Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
840
-
191016
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 100mm dia perforated PVC pipes 40cm long for weep holes including cost of all materials, labour,drilling 8mm dia holes etc., complete with all leads and lifts Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
732.48
-
166566
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 100mm dia perforated PVC pipes 40cm long for weep holes including cost of all materials, labour,drilling 8mm dia holes etc., complete with all leads and lifts REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
328.44
-
74687
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-20/M25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
3917.07
-
29749559
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-20/M25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
8242.5
-
62600551
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-20/M25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
6822.53
-
51816092
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-20/M25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
3053.35
-
23189735
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour with initial lead with up to 50 m and all lifts etc., complete with initial lead upto 50 and all lifts Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
162882.68
-
13144632
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour with initial lead with up to 50 m and all lifts etc., complete with initial lead upto 50 and all lifts Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
341400
-
27550980
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour with initial lead with up to 50 m and all lifts etc., complete with initial lead upto 50 and all lifts Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
284712.36
-
22976287
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour with initial lead with up to 50 m and all lifts etc., complete with initial lead upto 50 and all lifts REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
123774.92
-
9988636
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., the initial lead up to 50 m and all lifts. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
305.3
-
1980420
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., the initial lead up to 50 m and all lifts. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
645
-
4183986
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., the initial lead up to 50 m and all lifts. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
523.2
-
3393894
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., the initial lead up to 50 m and all lifts. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
234.4
-
1520506
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
915.9
-
874730
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
1935
-
1848022
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
1569.6
-
1499046
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
234.4
-
223864
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials,machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
142
-
171472
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials,machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
300
-
362265
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials,machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
262
-
316378
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials,machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
39
-
47094
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
142
-
70283
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
300
-
148485
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
262
-
129677
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
39
-
19303
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation for foundation in hard rock (including F&F rock) including boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
457.95
-
200994
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation for foundation in hard rock (including F&F rock) including boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
967.5
-
424636
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation for foundation in hard rock (including F&F rock) including boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
784.8
-
344449
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation for foundation in hard rock (including F&F rock) including boulders above 0.6 m upto 1.2 m dia. by controlled blasting and controlling fly rock by muffling arrangements for dam, spillway, intake structure and other appurtenant works and other open foundation works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all leads REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
117.2
-
51439
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6m dia for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump are or disposing of the same as directed etc., complete with initial lead of 50m and initial lift upto 3 m. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
2289.75
-
1466356
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6m dia for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump are or disposing of the same as directed etc., complete with initial lead of 50m and initial lift upto 3 m. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
4837.5
-
3097935
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6m dia for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump are or disposing of the same as directed etc., complete with initial lead of 50m and initial lift upto 3 m. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
3924
-
2512930
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6m dia for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump are or disposing of the same as directed etc., complete with initial lead of 50m and initial lift upto 3 m. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
351.6
-
225165
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Reach -VII - From KM.8.705- KM.9.125 L/S & KM.8.686 to 8.749 and Km.8.898 to Km.9.125 on R/S
6411.3
-
712937
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Reach -VI- From KM.7.900-KM.8.685 L/S &KM.7.900 to 8.561 R/S
13545
-
1506204
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Reach -V - From KM.6.940-KM.7.280 L/S &KM.6.940 to 7.286 R/S
10987.2
-
1221777
Construction Of RCC Retaining Wall On Hussain Sagar Surplus Nala;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. REACH-IV: L/S KM.6.529 to KM.6.835 & R/S KM.6.540 to 6.820
11251.2
-
1251133
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements