Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation Tender

Works
Civil And Construction
Civil Works Others
Opening Date6 Jan 2025
Closing Soon17 Jan 2025
Tender Amount₹ 6,82,061 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500/550/550D) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126 )

1005.62

91

92074.57

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;V.C.C. grade grade M 20 using Concrete mixer (Nominal Mix) using 20 mm Graded Metal using (20mm+10 mm) size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate ( Sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work,(MORTH 12.8 G)R.C.C

12.06

5647

68108.61

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

8.28

7873

65195.64

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-8-1-(76) : Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm..( only for Ceiling)

381.2

191

73098.91

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-12-3-(170) ; Painting to walls with Two coats of water proof cement paint of approved brand and shade over a base coat of water based primer of exterior grade-2 of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Water proof cement paint - 1+2 Coats

402.08

137

55322.19

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

250

125

31252.5

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (Manual means)

9

268

2419.29

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Filling with gravel in trenches, sides of fondations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labouru charges, hire charges of T&P etc, compelte for finished item of work (APSS No:309 & 310)

141.75

233

33050.43

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Plain Cement concrete (1:5:10) using 40 mm metal with concrete mixture. All work upto plinth level. nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

0.68

4319

2915.69

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Filling with gravel in trenches, sides of fondations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labouru charges, hire charges of T&P etc, compelte for finished item of work (APSS No:309 & 310)

10.08

233

2350.25

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-5-1(39); Brick Masonary 2nd Class Ground moulded or tredational size 23x11x7cm in Cement Motor 1:6 Prop including cost and conveyance of all materials like cement, sand, bricks, water etc., to site cost of Seigniorage Charges on all materials, including all labour charges like mixing Cement Motor, Scaffolding charges lift charges, curing charges etc., complete for finished item of work.

1.84

7873

14487.92

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Footing)

1.01

9663

9760.04

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Column up to GL)

0.66

13386

8835.06

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Plinth Beam)

0.41

13417

5501.35

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Plinth Beam)

0.33

13386

4427.91

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Column ABOVE GL)

2.13

13386

28513.16

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Roof Slab)

1.39

14101

19601.29

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;BLD-CSTN-3-13- ( 30 ) - A- Nominal mix: RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% river sand 50% rock sand) coarse aggregate, water etc., to site and sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering and shuttering charges for FOUNDATIONS, PLINTH, PEDESTALS (Slab 150mm Dia)

3.36

12288

41290.37

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Providing heigh yield strength deformed (HYSD)/Thermo Mechanically Treated (TMT)/Mild Steel (MS) steel bars (FE 415/Fe500 grade as per IS 1786-1979) of different diameters for RCC Works, including labour charges for straightening, cutting bending to required sized and shapes, palcing in position with cover blocks of approved materails and size and tying and lapsplicing with binding wire of 18SWB, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying incuding sales and other taxes on all materials etc compelte for finished items of work in all floors (APSS No:126)

1189.56

91

108916.11

... More
Construction of Gate, Pillers and Raising of Compound Wall, Burning Platform at Sarvajanik Smashana;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

15.48

180

2794.29



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.