Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
496908Tender No
Short Tender Notice No.70/EE/CIR-18/KZ/GHMC/2023-24 Dt : 13-02-2024 (Item No.06)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of compound wall;Construction of RR Masonary in C.M (1:8) prop. Using hard granite stone including cost and conveyance of all materials like cement, sand, water, Granite stone etc, including labour for cutting stones to required size and shape, mixing of cement mortar construction, Scaffolding charges etc. complete for finished item of work
76.05
4545
345658
Construction of compound wall;Plain Cement concrete Grade M20 - Nominal Mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excludingcentering, shutterin
2.19
5809
12723
Construction of compound wall;Supplying and fixing iron grills of 25mm square bars in 50x50x6mm. M.S. Angle frames including cost and conveyance of all materials and fixing in position fabrication charges etc., complete as per specification
3600
115
414000
Construction of compound wall;Brick masonary in CM (1:6) with 2nd class bricks traditional size 23x11x7 cm including c/c of all material and water to work at site and all operational incidental, labour charges such as scaffolding, mixing mortar lift charges curing etc complete for finished item of work
8.97
8302
74470
Construction of compound wall;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete but excluding seigniorage charges for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)
97.5
559
54592
Construction of compound wall;Painting with Synthetic Enamel paints - Two Coats including cost and conveyance and labour charges etc., complete as per standred specification.
153.6
169
26035
Construction of compound wall;White washing two coats with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials
78
151
11782
Construction of compound wall;Carting the excavated earth to a lead of 15 KMS including Labour chargess for loading and unlosding, Transportation etc. complete as per specification
83.7
294
24617